ETSI TR 102 615-2008 PowerLine Telecommunications (PLT) Plugtests 2007 on coexistence between PLT modem systems Test cases (V1 1 1)《电力线通信(PLT) PLT调制解调器系统间共存的Plugtests 2007 测试案例(版本1.pdf
《ETSI TR 102 615-2008 PowerLine Telecommunications (PLT) Plugtests 2007 on coexistence between PLT modem systems Test cases (V1 1 1)《电力线通信(PLT) PLT调制解调器系统间共存的Plugtests 2007 测试案例(版本1.pdf》由会员分享,可在线阅读,更多相关《ETSI TR 102 615-2008 PowerLine Telecommunications (PLT) Plugtests 2007 on coexistence between PLT modem systems Test cases (V1 1 1)《电力线通信(PLT) PLT调制解调器系统间共存的Plugtests 2007 测试案例(版本1.pdf(21页珍藏版)》请在麦多课文档分享上搜索。
1、 ETSI TR 102 615 V1.1.1 (2008-02)Technical Report PowerLine Telecommunications (PLT);Plugtests 2007 on coexistencebetween PLT modem systems;Test casesETSI ETSI TR 102 615 V1.1.1 (2008-02) 2 Reference DTR/PLT-00023 Keywords ACCESS, intelligent homes Essential, or potentially Essential, IPRs notified
2、to ETSI in respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (http:/webapp.etsi.org/IPR/home.asp). Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee can be
3、given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document. Foreword This Technical Report (TR) has been produced by ETSI Technical Committee PowerLine Telecommunications (PL
4、T) STF 332. The present document describes test cases prepared for a Plugtests event on coexistence between PLT modem systems. Introduction The Plugtests on the coexistence between PLT modem systems are performed to confirm the robustness of the CDCF as defined in PLT WI20 PLT39_TD_19a1.zip and to v
5、erify the protocol by tests on prototypes of different vendors, as available. A Special Task Force (STF) 332 was established to model the CDCF mechanism on sub MAC layer, to define suitable test cases for the Plugtests and to perform and report the results of the Plugtests. The aim of the Plugtests
6、is to verify the coexistence protocol given in the PLT WI20 drafts. The tasks of the STF with regard to PLT WI20 Plugtests are in detail: Describe and identify Plugtests to be done; Prepare test beds for the Plugtests; Perform the Plugtests; and Report the results of the Plugtests. ETSI ETSI TR 102
7、615 V1.1.1 (2008-02) 5 1 Scope The test cases defined in the present document are designed to verify the coexistence mechanism as defined in PLT-WI20 drafts. They are applicable to PLT modems (Access and Inhouse), in which the coexistence mechanisms are at least partly implemented. Since a monitorab
8、le reference device is not yet available, it is required that the PLT modems used for the tests have built-in monitoring abilities. Results of the verification of the proposed mechanism may be used to improve coexistence between PLT systems. 2 References References are either specific (identified by
9、 date of publication and/or edition number or version number) or non-specific. For a specific reference, subsequent revisions do not apply. Non-specific reference may be made only to a complete document or a part thereof and only in the following cases: - if it is accepted that it will be possible t
10、o use all future changes of the referenced document for the purposes of the referring document; - for informative references. Referenced documents which are not found to be publicly available in the expected location might be found at http:/docbox.etsi.org/Reference. For online referenced documents,
11、 information sufficient to identify and locate the source shall be provided. Preferably, the primary source of the referenced document should be cited, in order to ensure traceability. Furthermore, the reference should, as far as possible, remain valid for the expected life of the document. The refe
12、rence shall include the method of access to the referenced document and the full network address, with the same punctuation and use of upper case and lower case letters. NOTE: While any hyperlinks included in this clause were valid at the time of publication ETSI cannot guarantee their long term val
13、idity. 2.1 Normative references The following referenced documents are indispensable for the application of the present document. For dated references, only the edition cited applies. For non-specific references, the latest edition of the referenced document (including any amendments) applies. Not a
14、pplicable. 2.2 Informative references 1 IEC 61000-4-4: “Electromagnetic compatibility (EMC) - Part 4-4: Testing and measurement techniques - Electrical fast transient/burst immunity test“. ETSI ETSI TR 102 615 V1.1.1 (2008-02) 6 3 Abbreviations For the purposes of the present document, the following
15、 abbreviations apply: AC Alternating Current BNC Bayonet Nut Connector CDB coupling/decoupling box CDCF Commonly-Distributed Co-ordination Function FDM Frequently Division Multiplexing MTU Maximum Transmission Unit PLT PowerLine Telecommunications (http:/www.etsi.org/plt) PSD Power Spectral Density
16、RF Radio Frequency TCP Transmission Control Protocol UDP User Datagram Protocol 4 General Test Conditions, Traffic Generation and Traffic Monitoring Usually the PLT modems build a bridge between the powerline as transport media and a standard communication line (e.g. ethernet). For the tests, in whi
17、ch traffic is to be generated and to be monitored, the use of the public domain tool IPERF (http:/ will be used. The participant should bring with him the required computer with appropriate interfaces for his modem. In case of UDP traffic the following settings apply: stream type packet size data ra
18、te UDP 1 500 byte (MTU) 10 % to 100 % of maximum for PLT system as determined in pretests in steps of 10 % Since TCP uses congestion mechanisms, which may limit the traffic due to packet losses, some tests will be performed using TCP instead of UDP. This may be more realistic for quality perceived b
19、y the user. Since a monitorable reference device is not yet available, it is required that the PLT modems used for the tests have built-in monitoring abilities for the coexistence mechanism. This monitoring should include: Master or Slave synchronised with CDCF frames which resources do a modem try
20、to acquire which S- or D-slot(s) are allocated which priority slots are reserved amount of traffic is received or transmitted amount of traffic within the own system The coexistence mechanism also needs to be stimulated by generation of specific CDCFs. This stimulation should allow to realise Access
21、 / Inhouse (if possible) high / low priority streaming S-Slot, D-Slot, tacit D-slot allocation passive / active resynchronisation ETSI ETSI TR 102 615 V1.1.1 (2008-02) 7 The participant is free to select the tests listed in the following sections he wants to perform. For each given selected tests, t
22、he part of it that can not be performed will be noted and the rest will be performed. Many of the coexistence tests require two PLT systems of different vendors or types. These tests can only be performed in agreement with all participants concerned. 4.1 Coupling and Decoupling of the PLC-Signal The
23、 central element of the modular artificial test environment is a coupling/decoupling box (CDB) as shown in figure 4.1. It consists of a decoupling filter (60 dB for both symmetric and asymmetric signals) between power plug and mains connector and a coupling network (two capacitors, transformer and s
24、everal resistors). The resistors are designed for a 50 termination seen from each BNC connector. An RF-impedance of 100 can be measured into the power plug. The attenuation between the coaxial inputs and power plug depends on the dimensioning of the resistors and the RF-transformer. For all tests th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSITR1026152008POWERLINETELECOMMUNICATIONSPLTPLUGTESTS2007ONCOEXISTENCEBETWEENPLTMODEMSYSTEMSTESTCASESV111

链接地址:http://www.mydoc123.com/p-736040.html