《DIN EN 16125-2016 LPG Equipment and Accessories - Pipework systems and supports - LPG liquid phase and vapour pressure phase German version EN 16125 2015《液化石油气设备和配件 管道系统和支持 液化石油气液相.pdf》由会员分享,可在线阅读,更多相关《DIN EN 16125-2016 LPG Equipment and Accessories - Pipework systems and supports - LPG liquid phase and vapour pressure phase German version EN 16125 2015《液化石油气设备和配件 管道系统和支持 液化石油气液相.pdf(46页珍藏版)》请在麦多课文档分享上搜索。
1、March 2016 English price group 19No part of this translation may be reproduced without prior permission ofDIN Deutsches Institut fr Normung e. V., Berlin. Beuth Verlag GmbH, 10772 Berlin, Germany,has the exclusive right of sale for German Standards (DIN-Normen).ICS 23.040.01!%Le 16 Circumferential w
2、elds on pipes and pipe fittings 20 % Branches, fillet welds; including socket welds. 20 % Table 8 Inspection standards Examination Standard(s) Visual inspection EN ISO 17637 Ultrasonic examination EN ISO 16810 and EN ISO 17640 Radiographic examination EN ISO 17636-1 Magnetic particle testing EN ISO
3、17638 Penetrant testing EN ISO 3452-1 8.4 Testing personnel Non-destructive examination shall be carried out by persons who are competent and appropriately qualified for the duties they are to perform. Non-destructive examination personnel shall be qualified to at least level 2 of EN ISO 9712:2012.
4、DIN EN 16125:2016-03 EN 16125:2015 (E) 25 All companies providing such personnel should be certificated according to an appropriate standard e.g. EN ISO/IEC 17020 1. 8.5 Acceptance criteria Acceptance criteria shall be in accordance with EN ISO 5817. 8.6 Repairing welds Before proceeding with the re
5、pair of a weld, consideration shall be given to whether the repair can reasonably be expected to improve the quality of the weld. If not, the weld shall be rejected. Rejected parts of welds shall be cut out and the pipe shall be re-welded before being re-examined. Parts of welds containing unaccepta
6、ble defects shall be removed by grinding or cutting down to sound metal before proceeding with repair. Slag and oxide deposits shall be removed. Repairs shall be carried out in accordance with an approved procedure. No further repairs are permitted on repaired parts of a weld. All weld repairs shall
7、 be examined and be subjected to 100 % non-destructive examination as per 8.3. 8.7 Brazed copper joints Non-destructive examination of brazed joints shall be in accordance with EN 12799. 9 Inspection and documentation 9.1 General Before testing and commissioning, the installation and associated docu
8、mentation shall be inspected to ensure that it meets the design specification and will be safe to operate within the design parameters. The technical file and operating manual shall be available to those involved in the inspection. The following points shall be considered during the inspection: the
9、complete installation shall be checked to confirm it is correctly assembled using the specified materials/components and that there is no mechanical damage; control and safety devices (e.g. regulators, hydrostatic relief valves) shall be checked to confirm location, orientation and correct set press
10、ures. Any equipment that meets the operating pressure requirements but is not suitable for the proof test pressure shall be replaced with a spool piece or shall be blanked off; non-return valves are installed in the correct orientation; welded joints have been tested and/or inspected as required by
11、the relevant design and welding standards, see Clause 8; fittings, flanges, gaskets and bolts shall be examined to ensure that they are of the correct specification and that they are correctly assembled and aligned; threaded connections shall be examined to ensure that they are correctly assembled,
12、sealant is appropriately used and that there are no excessive exposed threads (i.e. the threads are correctly engaged and not mismatched); compression joints shall be examined to ensure that there is no undue distortion of the tube and that the nuts have not been over tightened; DIN EN 16125:2016-03
13、 EN 16125:2015 (E) 26 capillary joints shall be visually examined to confirm that the spelter or solder has run correctly between the tube and fitting; joints on non-metallic pipework shall be examined to ensure that they are correctly made and that there is appropriate above-ground pipe protection;
14、 there shall be no undue strain on any joint, pipe or support; pipe supports shall be checked to confirm the support distances are not exceeded; verification of corrosion protecting measures; specific requirements for the inspection of composite pipe required by the manufacturer, see E.3.2; and the
15、pipework is safe for subsequent purging and commissioning. The results of the inspection shall be recorded in writing. 9.2 Inspection and testing of corrosion protection 9.2.1 Coatings on underground pipework Carbon steel pipe joints, bends and fittings that require the application of a coating on s
16、ite, and any visible coating damage that has been repaired, shall be checked for defects e.g. with a spark tester (holiday detection). If any air is found trapped under the coating, the defective coating shall be removed, and re-applied. 9.2.2 Above-ground pipework protection Any protection shall be
17、 checked for defects and any damage shall be repaired. 9.2.3 Recording of test results The result of the inspection of each component shall be recorded in the technical file and shall be clearly traceable in the examination and radiographic reports. 10 Testing 10.1 General The completed tests for ea
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DINEN161252016LPGEQUIPMENTANDACCESSORIESPIPEWORKSYSTEMSANDSUPPORTSLPGLIQUIDPHASEANDVAPOURPRESSUREPHASEGERMANVERSIONEN161252015

链接地址:http://www.mydoc123.com/p-672667.html