CEPT T S 43-03 E-1988 CCITT SS No 7 Signalling Connection Control Part (SCCP)《国际电报电话咨询委员会SS七号信令系统信令接续控制部分》.pdf
《CEPT T S 43-03 E-1988 CCITT SS No 7 Signalling Connection Control Part (SCCP)《国际电报电话咨询委员会SS七号信令系统信令接续控制部分》.pdf》由会员分享,可在线阅读,更多相关《CEPT T S 43-03 E-1988 CCITT SS No 7 Signalling Connection Control Part (SCCP)《国际电报电话咨询委员会SS七号信令系统信令接续控制部分》.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、2326414 0008347 3 M Page E 1 Recommendation T/S 43-03 (Edinburgh 1988) CCITT SS No. 7 SIGNALLING CONNECTION CONTROL PART (SCCP) Recommendation proposed by Working Group T/WG 11 “Signalling, Protocols and Switching” (SPS) Text of the Recommendation adopted by the “Telecomminiications” Commission : “T
2、he European Conference of Post and Telecommunications Administrations, considering - that CCIT Recommendations 4.711-714 and 716 define the Signalling Connection Control Part, - that there are a number of points requiring further specification in these CCIT Recommendations, recommends that European
3、Administration who wish to use the SCCP on the international interface apply the following Recommendation, Note that this Recommendation is likely to require modification to conform with final CCLTT Blue Book Recom- mendations.” Note. This Recommendation contains only those SCCP capabilities require
4、d for the signalling in the European mobile system when using the Mobile Application Part and the Transaction Capabilities. An enhanced SCCP Recommendation is foreseen to be provided at the end of 1989 to support some of the Phase 2 Services. 1. INTRODUCTION This Recommendation is based on Draft Iss
5、ue 3 Rev. I Recommendations Q.711-714* as specified for the Blue Book, Volume VI, Fascicle VI.?. The requirements of those Recommendations shall apply unless modified by the exception statements contained in section 3. of this document and in addition shall include the specific requirements containe
6、d in section 4. of this document. Recommendation 4.716, as agreed for the Blue Book, will apply. It is expected that this Recommendation will be expanded to provide SCCP support for GAP Phase II services. 2. BASIC ASSUMPTIONS This Recommendation has been based on the following assumptions, concernin
7、g the international intercon- nection of national SCCPs. 2.1. The MTP specified for GAP Phase 1 requirements (T/S 43-01) will support the SCCP for the international interconnection of the pan european mobile network. There are no SCCP users (subsystems) in the International Network, and therefore no
8、 need for Management Messages to be originated or terminated. 2.2. 2.3. A global title including the Country Code, is required for routing in the International Network. The global title format of 4.713, Paragraph 3.4.2.3.3 will be used to support MAP applications. As a first step, protocol classes 1
9、, 2 and 3 are not required, since no need for them has been identified from study of the requirements for the Mobile Application Part (MAP) as specied by CEPT GSM. Later consideration of the services required for GAP Phase II may, however, demand the support of these protocol classes. * This documen
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CEPTTS4303E1988CCITTSSNO7SIGNALLINGCONNECTIONCONTROLPARTSCCP 国际 电报 电话 咨询委员会 SS 七号信令 系统 接续 控制 部分 PDF

链接地址:http://www.mydoc123.com/p-593277.html