1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationBS ISO 7870-3:2012Control chartsPart 3: Acceptance control chartsBS ISO 7870-3:2012 BRITISH STANDARDNational forewordThis British Standard is the UK implementation of ISO 7870-3:
2、2012.It supersedes BS 7783:1994 which is withdrawn.The UK participation in its preparation was entrusted to Technical Committee SS/4, Statistical Process Management.A list of organizations represented on this committee can be obtained on request to its secretary.This publication does not purport to
3、include all the necessary provisions of a contract. Users are responsible for its correct application. The British Standards Institution 2012. Published by BSI Standards Limited 2012ISBN 978 0 580 56116 0 ICS 03.120.30 Compliance with a British Standard cannot confer immunity from legal obligations.
4、This British Standard was published under the authority of the Standards Policy and Strategy Committee on 31 August 2012.Amendments issued since publicationDate Text affectedBS ISO 7870-3:2012 ISO 2012Control charts Part 3: Acceptance control chartsCartes de contrle Partie 3: Cartes de contrle pour
5、acceptationINTERNATIONAL STANDARDISO7870-3First edition2012-03-01Reference numberISO 7870-3:2012(E)BS ISO 7870-3:2012ISO 7870-3:2012(E)ii ISO 2012 All rights reservedCOPYRIGHT PROTECTED DOCUMENT ISO 2012All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or
6、 utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from either ISO at the address below or ISOs member body in the country of the requester.ISO copyright officeCase postale 56 CH-1211 Geneva 20Tel. + 41 22 749 01 11Fax
7、 + 41 22 749 09 47E-mail copyrightiso.orgWeb www.iso.orgPublished in SwitzerlandBS ISO 7870-3:2012ISO 7870-3:2012(E) ISO 2012 All rights reserved iiiContents PageForeword ivIntroduction v1 Scope 12 Normative references .13 Terms and definitions .14 Symbols and abbreviated terms .24.1 Symbols .24.2 A
8、bbreviated terms .35 Description of acceptance control chart practice 36 Acceptance control of a process 56.1 Plotting the chart .56.2 Interpreting the chart 57 Specifications .58 Calculation procedures .68.1 Selection of pairs of elements .68.2 Frequency of sampling 89 Examples .99.1 Example 1 . 99
9、.2 Example 2 1010 Factors for acceptance control limits 1111 Modified acceptance control charts .12Annex A (normative) Nomographs for acceptance control chart design 14Bibliography .20BS ISO 7870-3:2012ISO 7870-3:2012(E)ForewordISO (the International Organization for Standardization) is a worldwide
10、federation of national standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technical committees. Each member body interested in a subject for which a technical committee has been established has the right to be represented on that c
11、ommittee. International organizations, governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization.International Standards are drafted in accor
12、dance with the rules given in the ISO/IEC Directives, Part 2.The main task of technical committees is to prepare International Standards. Draft International Standards adopted by the technical committees are circulated to the member bodies for voting. Publication as an International Standard require
13、s approval by at least 75 % of the member bodies casting a vote.Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. ISO shall not be held responsible for identifying any or all such patent rights.ISO 7870-3 was prepared by Technical C
14、ommittee ISO/TC 69, Applications of statistical methods, Subcommittee SC 4, Applications of statistical methods in process management.This first edition of ISO 7870-3 cancels and replaces ISO 7966:1993.ISO 7870 consists of the following parts, under the general title Control charts: Part 1: General
15、guidelines Part 2: Shewhart control charts Part 3: Acceptance control charts Part 4: Cumulative sum chartsAdditional parts on specialized control charts and on the application of statistical process control (SPC) charts are planned.iv ISO 2012 All rights reservedBS ISO 7870-3:2012ISO 7870-3:2012(E)I
16、ntroductionAn acceptance control chart combines consideration of control implications with elements of acceptance sampling. It is an appropriate tool for helping to make decisions with respect to process acceptance. The bases for the decisions may be defined in terms ofa) whether or not a designated
17、 percentage of units of a product or service derived from that process will satisfy specification requirements;b) whether or not a process has shifted beyond some allowable zone of process level locations.A difference from most acceptance sampling approaches is the emphasis on process acceptability
18、rather than on product disposition decisions.A difference from usual control chart approaches is that the concept of process acceptance is introduced in the process control. The process usually does not need to be in control about a single standard process level; as long as the within-subgroup varia
19、bility remains in control and is much smaller than the tolerance spread, it can (for the purpose of acceptance) run at any level or levels within a zone of process levels which would be acceptable in terms of tolerance requirements. Thus, it is assumed that some assignable causes will create shifts
20、in the process levels which are small enough in relation to requirements that it would be uneconomical to attempt to control them too tightly for the purpose of mere acceptance.The use of an acceptance control chart does not, however, rule out the possibility of identifying and removing assignable c
21、auses for the purpose of continuing process improvement.A check on the inherent stability of the process is required. Therefore, variables are monitored using Shewhart-type range or sample standard deviation control charts to confirm that the variability inherent within rational subgroups remains in
22、 a steady state. Supplementary examinations of the distribution of the encountered process levels form an additional source of control information. A preliminary Shewhart control chart study should be conducted to verify the validity of using an acceptance control chart. ISO 2012 All rights reserved
23、 vBS ISO 7870-3:2012BS ISO 7870-3:2012Control charts Part 3: Acceptance control charts1 ScopeThis part of ISO 7870 gives guidance on the uses of acceptance control charts and establishes general procedures for determining sample sizes, action limits and decision criteria. An acceptance control chart
24、 should be used only when:a) the within subgroup variation is in-control and the variation is estimated efficiently;b) a high level of process capability has been achieved.An acceptance control chart is typically used when the process variable under study is normally distributed; however, it can be
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSISO787032012CONTROLCHARTSACCEPTANCECONTROLCHARTS 控制 验收 图表 PDF

链接地址:http://www.mydoc123.com/p-588065.html