BS EN 62424-2009 Representation of process control engineering - Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools《过程控制工程的表示法-P&ID工具和PCE-CAE工具之间P&I图表及.pdf
《BS EN 62424-2009 Representation of process control engineering - Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools《过程控制工程的表示法-P&ID工具和PCE-CAE工具之间P&I图表及.pdf》由会员分享,可在线阅读,更多相关《BS EN 62424-2009 Representation of process control engineering - Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools《过程控制工程的表示法-P&ID工具和PCE-CAE工具之间P&I图表及.pdf(140页珍藏版)》请在麦多课文档分享上搜索。
1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationRepresentation of process control engineering Requestsin P 35.240.50Compliance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was publ
2、ished under the authority of the StandardsPolicy and Strategy Committee on 31 May 2010.Amendments issued since publicationAmd. No. Date Text affectedBRITISH STANDARDBS EN 62424:2009Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 01/09/2010 03:02, Uncontrolled Copy, (c) BSIEUROPEAN STANDARD EN
3、 62424 NORME EUROPENNE EUROPISCHE NORM August 2009 CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung Central Secretariat: Avenue Marnix 17, B - 1000 Brussels 2009 CENELEC - All rights of ex
4、ploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. EN 62424:2009 E ICS 35.240.50; 25.040.40 English version Representation of process control engineering - Requests in P it shall not allow unguided automatic changes. The configurable checking step shall include
5、functionality for automatic or manual acceptance of data changes, allowing single decisions up to bulk data management. All changes in the proprietary database and all discovered data inconsistencies shall be reported by the import application. The generation of the report shall be configurable. The
6、 import/export application has to assure that the intersection of the different databases contains the same information, and that additional division specific data is handled in a consistent way. Data manipulation by a project division is an ongoing process during the whole project and beyond it. Th
7、us the creation, changing and deletion of data shall be possible during the life-cycle of the plant. CAEX databases have to be consistent. This requires a consistency check before exporting the data. This procedure has to be followed after a successful data manipulation in a P 2) mandatory fields be
8、ing filled in; 3) correct use of numbering system of the PCE requests. Inconsistent data shall not be exported. b) generate PCE relevant information; c) check for changed information in comparison with previously stored data in the neutral database; d) renaming of PCE request shall be supported by t
9、he export functionality; e) perform data export from proprietary into neutral database: 1) e. g. if the PCE request has been changed, the old PCE request within the neutral database has to be deleted and the new one shall be exported from the proprietary database into the neutral database. The old P
10、CE request information shall be stored in a backup storage system; 2) Other changes shall be performed with the existing object. f) generate reports after each data exchange: e. g. new PCE requests list, missing PCE requests list, changed PCE requests list, deleted PCE requests list, problems and er
11、ror list. Data import from neutral database into the target database shall comprise the following activities: g) generate PCE relevant information from neutral database; h) check for changed information by comparing the neutral database with the target database; i) perform data import from the neutr
12、al into the proprietary database; j) renaming of PCE request shall be supported by the import functionality; k) generate reports after each data exchange: 1) e. g. error lists; 2) inconsistencies due to imported data shall be detected by the target application during the import process and are not c
13、onsidered within this standard. 6 Representation of PCE requests in a P b) the graphical representation of PCE requests in a P c) the type of functional connection between the PCE requests: the control functions; d) the graphical representation of signals in a P&ID. In addition the reference designa
14、tion scheme used for PCE requests in a P&ID shall be specified. Detailed information on complex control functions shall not be part of the P&ID. Therefore, additional documentation (e.g. control narratives, function charts) has to be prepared to define the required functionality. A control function
15、shall also be individually identified and shall be represented on the P&ID. 6.3 Requirements for the identification and representation of PCE requests 6.3.1 General Each PCE request shall be graphically represented by a bubble, which collects all information about the functional requirements. Three
16、data fields inside and ten data fields outside the bubble are defined to hold all the information of a PCE request (see Figure 3). For detailed information see 6.3.3 to 6.3.9. USxxxx.3AH SHH AH SHH YS xxxx.4 AL OH PCE loop xxxx (optional) PCE request PCE control function aPCE request FIxxxx.2 TIxxxx
17、.1 PCE request BS EN 62424:2009Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 01/09/2010 03:02, Uncontrolled Copy, (c) BSI 18 62424 IEC:2008(E) Figure 3 General representation of a PCE-Request in a P&ID As stated before, only the PCE functionality shall be depicted on the P&ID, not the PCE i
18、mplementation. In exceptional cases however, there might be constellations where the presentation of detailed realization information is inevitable. For example, in the case of a multi-sensor element which means an instrument that produces measurements for different categories, every category shall
19、be represented by its own bubble. The bubbles are stacked up, as shown in Figure 4. Figure 4 Multi-sensor element In all cases where the PCE request is connected to the equipment or pipe, this shall be shown by a full line, connecting the bubble with the equipment or pipe. 6.3.2 Types of lines Signa
20、l lines are used to illustrate the functional relationship between PCE requests. A signal line shall be depicted as a dashed line with an arrow to indicate the information flow. Source of information flow shall be a bubble of a PCE control function or request or switching action consisting of the si
21、x fields right outside the bubble. The sink of information flow shall be a bubble of a PCE request or a control function. Process connections shall be depicted by a solid line without a direction. Multi-sensor instruments with only one process connection shall have an extra bubble for each category
22、and only one process connection. 6.3.3 Displaying the location of the operator interface Each PCE request is graphically represented by a bubble. This standard distinguishes the location of the operator interface between a local interface, a local control panel and a central control room. The locati
23、on does not reflect any realization in systems. A local interface shall be represented as shown in Figure 5. It could be e. g. a pressure gauge. PCE category and functionPCE IdentificationPU Vendor Typical ident. Device information ZHHHAHSHHALALLSLLLSafety relevant GMPQuality relevant (SIL3)DIxxxxFI
24、xxxxPIxxxxBS EN 62424:2009Licensed Copy: Wang Bin, ISO/EXCHANGE CHINA STANDARDS, 01/09/2010 03:02, Uncontrolled Copy, (c) BSI62424 IEC:2008(E) 19 PIxxxxFigure 5 Local interface Operator action/information on a local control panel shall be represented as shown in Figure 6. HSxxxxFigure 6 Manually ope
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSEN624242009REPRESENTATIONOFPROCESSCONTROLENGINEERINGREQUESTSINPIDIAGRAMSANDDATAEXCHANGEBETWEENPIDTOOLSANDPCECAETOOLS

链接地址:http://www.mydoc123.com/p-578472.html