BS 7273-2-1992 Code of practice for the operation of fire protection measures - Part 2 Mechanical actuation of gaseous total flooding and local application extinguishing systems《防火.pdf
《BS 7273-2-1992 Code of practice for the operation of fire protection measures - Part 2 Mechanical actuation of gaseous total flooding and local application extinguishing systems《防火.pdf》由会员分享,可在线阅读,更多相关《BS 7273-2-1992 Code of practice for the operation of fire protection measures - Part 2 Mechanical actuation of gaseous total flooding and local application extinguishing systems《防火.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、BRITISH STANDARDC ode of pract i c eforT he opera t ion of fireprot e c t ion mea sures Par t 2 :Me c h a nical actua t ion of g a s eous t o t a lflooding a nd local a ppli cat ione xtingu i s hing systemsBS 7273-2: 1992Incorporating Amendment No. 1NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMIT
2、TED BY COPYRIGHT LAWICS 13.220.20BS 7273- 2 : 1992T his B rit i s h S t a nda rd, h a v ingb een prepa red under thedirec t ionof the F ire S t a nda rds P olic y C ommittee, wa s p u b lis hed u nder the a uthority of t he S t a nda rds B o a rd a ndc omes int oeffec t on1 May 1992T he follo w ing
3、BSI referen c e srel a t e to the work on this sta nda rd:C ommittee referen c e FSM/ 1 2D r a f t for c omment 9 0/44410 DCC ommittees res pons i b le for this B rit i s h S t a nda rdT he prepa r a t ion of this B rit i s h S t a nda rd wa s ent r usted b y t he F ire S t a nda rds P olic y C ommi
4、ttee ( FSM/ -) to T e c hnical C ommittee FSM/ 1 2 , upon whic h thefollow ing b odies w ere repres ent ed:B rit i s h Cable Maker s C onfedera t ionB rit i s h F ire P rot e c t ion S ystems A sso c i a t ion L t d.B rit i s h F ire S erv i c e s A sso c i a t ionB rit i s h T ele c omm u nicat ion
5、 s plcC h a r t ered I n sti tut ionof B u ilding S erv i c e s E ngineer sC hief a nd A ssi sta n t C hief F ire O ffi c ers A sso c i a t ionD epa r t ment of H e a l t hD epa r t men t of the E n v ironmen t ( B u ilding R e s e a r c h E stablis hment )D epa r t men t of the E n v ironmen t Cent
6、 r a l(DCSS F ire B r a n c h)D epa r t ment of T r a n s port ( Marine D irec t ora t e)E lec t rical C ont r act ors A sso c i a t ionE lec t rical I n sta lla t ion E q u ipmen t Man u f acturer s A sso c i a t ion(BEAMALt d.)H ome O ffi c eI n sti tution of E lec t rical E ngineersI n sti tution
7、 of F ire E ngineersL ondon F ire a nd C i v il D efenc e A uthorityL o ss P rev ent ion C o u n c ilM ini str y of D efenc eNat ion a l A sso c i a t ionof F ire O ffic ersNat ion a l Car a v a n C o u n c il L imit edNat iona l I n s pec t ion C o u n c il for E lec t rical I n sta lla t ion C ont
8、 r act ingNat ion a l I n s pec t ion C o u n c il ( Q u a lity A ssur a n c e L t d.)S o c iety of F ire P rot e c t ion E ngineersT r a des U nion C ongressT he follow ing b ody w a s a l s orepres ent ed in the dra f t ingof the st a nda rd,t hro u gh su bcommittees a nd p a nels :B rit i s h C o
9、mp uter S o c ietyA mendments i ssued sinc epu b licat ionISBN 978 0 580 59894 4BSI 2007Amd. No. Date Comments17276 31 August 2007 See national forewordBS 7273- 2 : 1992iC ont entsPageC ommittees res pons i b le I n s ide front c o v erF ore w ordii1 Scope 12 D efinit ions 13 S ystem des ign 14 T he
10、rma llink systems 15 P neu m a t i c systems26 Man u a lrelea s ede v i c e s37 A uxilia r y f u n c t ions a nd a n c illa r y c ont rols38 I n s pec t ion, init i a l te sting,commissioning a nd c ert ificat ionof system9 S u perv i s ion 41 0 S erv i c ing 4A ppendix AEx a mple of a simple dia gr
11、a mma t i c repres ent a t ionof a ty pical sequ enc eof act ions lea ding to the relea s eoffiree xting u i s hing mediu m 6Table 1T empera ture r a t ings a nd c olou r c oding of fra ngib leb u l b s a nd soldered met a l therma llink systems2P u b licat ion(s )referred to I n s ide back c o v er
12、 BSI 2007BS 7273- 2 : 1992iiF orew ordT his B rit i s h S t a nda rd c ode of pract i c eha s b een prepa red under the direc t ion oft he F ire S t a nda rds P olic y C ommittee. I t s hou ld b ere a din c onju n c t ion w i t hB rit i s h S t a nda rds c onc erned wi t hfire e xting u i s hing sys
13、tems ( s ee BS 5 306) a nds hou ld a l s o b e us ed in c onju n c t ion wi t hot her Par ts of this sta nda rd.M e c h a nical actua t ion s a re widely us ed in spec ifi capplicat ion s , e.g. pro c e ss h a z a rds , d u e to t heir inherent simplic i ty a nd reliability. T heir use can b ea d v
14、a n t a geous w here elec t rically act i v a t ed systems a re c ons idered less des irable.S u c h systems can b e used in c onju n c t ion w i t h , or supplemen t , o t her types ofdet e c t ion systems .S inc eme c h a nical systems do not nec e ssa rily h a v e a nelec t ricalpo w er so u r c
15、ea v a ilable, elec t ricalmoni t oringis not a l w a ys possi b le.I n c ert a ina pplicat ions t heabs enc eofelec t ricalmonit oring of the system m a y m a ke suc h a mec h a nicalsystem un accept able.A ttent ionis dra w n to A ppendix A whic hgi v e s a simple dia gra mma t i crepres ent a t i
16、on of a ty pical sequ enc eof act ions lea ding to the relea s eoffiree xtingu i s hing mediu m.S u mma r y of p a gesT his doc u ment c ompris e s a front c o v er,anin s ide front c o v er, p a ges i a nd ii,p a ges 1 to 6,anin s ide back c o v er a nd aback c o v er.T his sta nda rd h a s b een u
17、pda t ed ( s ee c opy right d a t e) a nd m a y h a v eha da mendments inc orpora t ed. T his w ill b eindicat ed in the a mendment t able on theins idefron t c o v er.The start and finish of text introduced or altered by amendment is indicated in the text by tags !“. Tags indicating changes to text
18、 carry the number of the amendment. For example, text altered by amendment 1 is indicated by !“.This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application.Compliance with a British Stqndard cannot confer immunity from le
19、gal obligations. BSI 2007BS 7273- 2 : 199211 ScopeT his Par t ofBS 7273 giv e s rec ommenda t ions for thepla nning, insta lla t ion a nd serv i c ingofme c h a nicalequ ipmen t for the actua t ionofga s eous firee xting u i s hing systems . I t a pplies only t omec h a nically actua t ed to t a lfl
20、ooding a nd locala ppli cat ion g a s eous fire e xting u i s hing systems .2 D efinit ionst herm a llinkspoint type, fix ed tempera ture det e c t orsNOTE E x a mples of thes e a re fra ngib le b u l b s or soldered met a llinks .3 S ystem des ign3 .1 G enera lT he system des ign shou ld c omply wi
21、 t h t hea ppropria t erequ iremen ts a nd rec ommenda t ions ofS ystem actua t ion shou ld init i a t e the requ iredindicat ions a nd c ont rol s a s giv en in BS 5 306 .3 . 2 S ystem spec ificat ionT he requ irements for t he prot e c t ed sp ace(s ) shou ldb e a s c ert a ined b y c onsul t a t
22、ion b e tween the c lient a nd,as a ppropria t e , the a r c hit e c t , the c onsul t a n t ,t he fire det e c t ion a nd a l a rm system c ont r act or, thefire e xting u i s hing c ont r act or( s ) , the fire a uthori ty,t he fire insurer , the H e a l t h a nd Safety E x e c uti v e ,a nd a n y
23、 p u b licauthority c onc erned.I t i s e ssent i a l th a t in the e v ent of fire a pre-pla nneda nd pract i s ed c o u r s eof act ion , shou ld b e ta ken toensure the sa fety of o ccu p a n ts a nd the effe c t i v eopera t ionof the e xting u i s hing system. S u c hnec e ssa r y act ion s s h
24、ou ld b edi s c uss ed a t t he des ignsta ge a nd inc orpora t ed wi t hin the propos ed system.3 . 3 T y pes of system actua t orsM e c h a nical actua t ors used for init i a t ing thea utoma t i c relea s eoffire e xtingu i s hing systems s hou ld b eone of the follow ing ty pes :a ) therma llin
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS727321992CODEOFPRACTICEFORTHEOPERATIONOFFIREPROTECTIONMEASURESPART2MECHANICALACTUATIONOFGASEOUSTOTALFLOODINGANDLOCALAPPLICATIONEXTINGUISHINGSYSTEMS

链接地址:http://www.mydoc123.com/p-546666.html