《BS 6525-1984 Specification for design and construction of reservoirs used in hydraulic fluid power systems《液压流体动力系统用储液器的设计与建造规范》.pdf》由会员分享,可在线阅读,更多相关《BS 6525-1984 Specification for design and construction of reservoirs used in hydraulic fluid power systems《液压流体动力系统用储液器的设计与建造规范》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、BRITISH STANDARD BS 6525:1984 Incorporating Amendment No. 1 Specification for Design and construction of reservoirs used in hydraulic fluid power systems UDC 621.642.31:621.22BS6525:1984 This British Standard, having been prepared under the directionof the Mechanical Engineering Standards Committee,
2、 was published underthe authority of the BoardofBSI and comes intoeffecton 28September1984 BSI 07-1999 The following BSI references relate to the work on this standard: Committee reference MEE/186 Draft for comment 83/74063 DC ISBN 0 580 13989 1 Committees responsible for this British Standard The p
3、reparation of this British Standard was entrusted by the Mechanical Engineering Standards Committee (MEE/-) to Technical Committee MEE/186 upon which the following bodies were represented: Association of British Mining Equipment Companies Association of Hydraulic Equipment Manufacturers British Comp
4、ressed Air Society British Hydromechanics Research Association British Steel Corporation British Telecommunications Department of Trade and Industry (National Engineering Laboratory) Electricity Supply Industry in England and Wales Federation of Manufacturers of Construction Equipment and Cranes Hea
5、lth and Safety Executive Institution of Mechanical Engineers Machine Tool Industry Research Association Ministry of Defence National Coal Board The following bodies were also represented in the drafting of the standard, through subcommittees and panels: Bath University Library GAMBICA (BEAMA Ltd.) H
6、ydraulic Press Manufacturers Association Institution of Production Engineers Amendments issued since publication Amd. No. Date of issue Comments 6075 February 1990 Indicated by a sideline in the marginBS6525:1984 BSI 07-1999 i Contents Page Committees responsible Inside front cover Foreword ii 1 Sco
7、pe 1 2 Definitions 1 3 Construction 1 4 Preparation for despatch 3 5 Codification 3 6 Labelling 4 Appendix A Guidance for the selection and use of reservoirs 8 Figure 1 Details of reservoir 4 Figure 2 Details of access panels 5 Figure 3 Details of drip tray 6 Table 1 Reservoir envelope dimensions 5
8、Table 2 Dimensions of access panel 6 Table 3 Examples of internal surface treatments 7 Table 4 Heat dissipation by reservoir walls 8 Publications referred to Inside back coverBS6525:1984 ii BSI 07-1999 Foreword This British Standard has been prepared under the direction of the Mechanical Engineering
9、 Standards Committee and is based upon proposals prepared by the Association of Hydraulic Equipment Manufacturers in collaboration with the automobile industry, steel industry, Ministry of Defence (Navy) and Machine Tool Industry Research Association. The dimensions specified in this standard are co
10、mpatible with those specified in the German standard DIN24339, published by Deutches Institut fr Normung. A British Standard does not purport to include all the necessary provisions of a contract. Users of British Standards are responsible for their correct application. Compliance with a British Sta
11、ndard does not of itself confer immunity from legal obligations. Summary of pages This document comprises a front cover, an inside front cover, pages i and ii, pages1 to 8, an inside back cover and a back cover. This standard has been updated (see copyright date) and may have had amendments incorpor
12、ated. This will be indicated in the amendment table on theinside front cover.BS6525:1984 BSI 07-1999 1 1 Scope This British Standard specifies basic requirements for the design and construction of reservoirs used in hydraulic fluid power systems. Certain functional and maintenance features are inclu
13、ded which provide manufacturers with freedom of design within the specified basic requirements. The standard is not applicable to reservoirs intended for use with category HFA fluids 1) . Guidance for the selection and use of reservoirs is given inAppendix A. NOTEThe titles of the publications refer
14、red to in this standard are listed on the inside back cover. 2 Definitions For the purposes of this British Standard the following definitions apply. 2.1 breather capacity a measure of the flow rate through an air breather 2.2 nominal fluid capacity the maximum working volume of hydraulic fluid whic
15、h can sensibly be stored in a reservoir 2.3 reservoir a container that stores the working fluid of a hydraulic fluid power system, prevents the ingression of solid or liquid contaminants into the fluid, dissipates heat generated in the fluid, facilitates the separation of air entrained in the fluid,
16、 provides a suitable mounting surface (when required) for system components, and which has accessibility for servicing and facilities for handling 2.4 total volume the total volume of the space within a reservoir 3 Construction 3.1 Capacity 3.1.1 The nominal fluid capacity shall be as given inTable
17、1. 3.1.2 To ensure that there is adequate air space above the fluid surface, the total volume shall be approximately125% the nominal fluid capacity. 3.2 Materials 3.2.1 The reservoir shall be fabricated from suitable rigid materials that are compatible with the fluids to be contained. 3.2.2 All seal
18、 materials shall be compatible with the fluid to be contained within the reservoir. 3.3 Support The reservoir shall be supported in such a manner that the minimum ground clearance shown inFigure 1 is provided to give access to, and permit removal of, the drain plug and to ensure air circulation unde
19、rneath the reservoir. 3.4 Baffles 3.4.1 Reservoirs having a nominal fluid capacity of100L and greater shall be fitted with internal baffles to ensure adequate circulation of all the fluid. 3.4.2 The baffles shall be so located as to separate the return fluid from the suction fluid. 3.4.3 Any apertur
20、es which facilitate flow through the baffles shall be so located as to ensure that the fluid flows along the reservoir sides to give maximum heat dissipation. 3.4.4 The baffles shall have apertures above the maximum fluid level which are of sufficient size to permit air flow between compartments. 1)
21、 Defined in BS6413-4.BS6525:1984 2 BSI 07-1999 3.4.5 The baffles shall be so positioned as to facilitate complete removal of fluid and permit cleaning of all internal surfaces by hand. 3.5 Internal access 3.5.1 At least one access opening, with a covering panel complying with the dimensions given in
22、 Table 2, shall be provided in a vertical wall of the reservoir. 3.5.2 The number and location of the panels shall be such as to facilitate the cleaning of all internal surfaces by hand. 3.5.3 The access panels shall be capable of removal and refitment by one operator and each shall be fitted with a
23、 re-usable elastomeric seal seeFigure 2(b). 3.6 Bottom profile The bottom surface of the reservoir shall be shaped to ensure complete drainage. 3.7 Reservoir top To prevent ingress of contaminants during assembly and/or servicing any threaded accessory mounting holes used to attach components to the
24、 reservoir top shall be of the “blind” type. NOTESuch blind fixings are not necessary when mounting a filler or breather. 3.8 Drip tray 3.8.1 When a drip tray is to be fitted it shall be in accordance with the dimensions given inFigure 3. 3.8.2 The drip tray, if fitted, shall be provided with a drai
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS65251984SPECIFICATIONFORDESIGNANDCONSTRUCTIONOFRESERVOIRSUSEDINHYDRAULICFLUIDPOWERSYSTEMS 液压 流体 动力

链接地址:http://www.mydoc123.com/p-546097.html