BS 2B 100-2009 Procedure for inspection testing and acceptance of wrought copper alloys《锻造铜合金的检查、测试和验收程序》.pdf
《BS 2B 100-2009 Procedure for inspection testing and acceptance of wrought copper alloys《锻造铜合金的检查、测试和验收程序》.pdf》由会员分享,可在线阅读,更多相关《BS 2B 100-2009 Procedure for inspection testing and acceptance of wrought copper alloys《锻造铜合金的检查、测试和验收程序》.pdf(36页珍藏版)》请在麦多课文档分享上搜索。
1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI British StandardsWB9423_BSI_StandardColCov_noK_AW:BSI FRONT COVERS 5/9/08 12:55 Page 1AEROSPACE SERIESProcedure for inspection, testing and acceptance of wrought copper alloysBS 2B 100null200nullBS 2
2、B 100:2009 BRITISH STANDARDPunulllishing and copyright infornullationThe BSI copyright notice displayed in this document indicates nullhen the document nullas last issuednullnull BSI 2009ISBN 9nullnull 0 nullnull0 null2nullnull9 nullInullS null9null02nullnull99The nullollonulling BSI renullerences r
3、elate to the nullornull on this standard: nullommittee renullerence Anullnullnullnull1 Dranullt nullor comment 09nullnull01null121null DnullPunulllication historynullirst punulllished nullanuary 1992Second nullpresentnull editionnull Decemnuller 2009Anullendnullents issued since punulllicationnullat
4、e nullenullt affected BRITISH STANDARDnull BSI 2009 null iBS 2B 100:2009Contentsnullorenullord iiiSection 1null nulleneral 11 Scope 12 Normatinulle renullerences 1null Terms and denullnitions 1null nulleneral 3null Innullormation and renulluirements to nulle agreed and to nulle documented 4null null
5、anunullacture and nullreedom nullrom denullects 5null Heat treatment 6null nullhemical composition 6null Testing 710 nullarnulling 911 nullrotection and pacnullaging 912 nullertinullcation 9Section 2null Rod and sections nullincluding hollow rod and sectionsnull 111null nulleneral 111null Inspection
6、 and testing 111null nullarnulling 12Section nullnull nullorging stocnull 131null nulleneral 131null nullanunullacture 131null Inspection and testing 131null nullarnulling 15Section nullnull nullorgings 1620 nulleneral 1621 nullanunullacture 1622 nullrenullproduction nullorgings 162null Inspection a
7、nd testing onull production nullorgings 172null nullarnulling 19Section nullnull Seanullless tunulle 202null nulleneral 202null Inspection and testing 202null nullarnulling 23Section nullnull Sheet, strip and foil 242null nulleneral 242null Inspection and testing 24null0 nullarnulling 25Section null
8、null nullire 26null1 nulleneral 26null2 Inspection and testing 26nullnull nullarnulling 26AnnenullesAnnenull A nullnormatinullenull Rules nullor application onull nullalues nullor chemical composition and mechanical properties ginullen in material specinullcations 27Binullliography 28BS 2B 100:2009i
9、i null null BSI 2009BRITISH STANDARDSunullnullary of pagesThis document comprises a nullront conullernull an inside nullront conullernull pages i to inullnull pages 1 to 2nullnull an inside nullacnull conuller and a nullacnull conullernullnullist of tanulllesTanullle 1 null Nominal nullatch sinulles
10、 nullmassesnull nullor sampling onull rods 11Tanullle 2 null Nominal nullatch sinulles nullmassesnull nullor sampling onull nullorging stocnull 13Tanullle null null Nominal nullatch sinulles nullmassesnull nullor sampling onull production nullorgings 17Tanullle null null Diameter onull drilled holes
11、 in renullerence standard tunulle 20BRITISH STANDARDnull BSI 2009 null iiiBS 2B 100:2009nullorewordPunulllishing infornullationThis British Standard is punulllished nully BSI and came into enullnullect on null1 Decemnuller 2009null It nullas prepared nully nullanel Anullnullnullnull1nullnullnull1nul
12、lnull Copper and miscellaneous alloysnull under the authority onull Technical nullommittee Anullnullnullnull1null Metallic materials for aerospace purposesnull A list onull organinullations represented on this committee can nulle onulltained on renulluest to its secretarynullSupersessionThis British
13、 Standard supersedes BS B 100:1992null nullhich is nullithdranullnnullInfornullation anullout this docunullentThis is a nullull renullision onull BS B 100 and introduces the nullollonulling principal changes:Section 1:anull Tensile testing to BS nullA null:19nullnullnull nullart 1null Section 1 has
14、nulleen replaced nully BS nullN 2002null1nullnullnull Hardness testing to BS nullA null:19nullnullnull nullart null has nulleen replaced nully BS nullN ISnull nullnull0nullnull1null BS nullN ISnull nullnull0nullnull1 and BS nullN ISnull nullnull0nullnull1nullcnull Renullerence to Appendinull A has n
15、ulleen deleted and nullapplication onullnullalues nullor numerical and other unitsnull details hanulle nulleen addednulldnull Temperature control method has nulleen amendednullSection 2: Inspection and testing renulluirements summary tanullle has nulleen deletednullSection null: Inspection and testi
16、ng renulluirements summary tanullle has nulleen deletednullSection null:anull Renullerence to Appendinull B has nulleen deleted and renullerence to BS nullN ISnull 19nullnull Wrought copper and copper alloys null nulletection of residual stress null Mercurynullnullnull nitrate test has nulleen added
17、nullnullnull Inspection and testing renulluirements summary tanullle has nulleen deletednullSection null: anull nullor the eddy current test drilled hole sinulles hanulle nulleen addednullThese hole sinullesnull nullormerly in BS B 2nullnull nullere originally tanullen nullrom ASTnull B111 and nulle
18、re connullersions nullrom imperial sinullesnull They hanulle nulleen amended to align nullith BS nullN 12nullnull1 nullCopper and copper alloys null nulleamlessnull round tunulles for heat enullchangersnullnullnullnull Inspection and testing renulluirements summary tanullle has nulleen deletednullSe
19、ction null: Inspection and testing renulluirements summary tanullle has nulleen deletednullSection null: Inspection and testing renulluirements summary tanullle has nulleen deletednullAppendinull A has nulleen deletednullAppendinull B has nulleen deletednullBS 2B 100:2009inull null null BSI 2009BRIT
20、ISH STANDARDnullanullard warningsnullARnullInullnullnull This British Standard calls nullor the use onull sunullstances andnullor procedures that can nulle innullurious to health inull adenulluate precautions are not tanullennull It renullers only to technical suitanullility and does not anullsolnul
21、le the user nullrom legal onullligations relating to health and sanullety at any stagenullnullse of this docunullentIt has nulleen assumed in the preparation onull this British Standard that the enullecution onull its pronullisions nullill nulle entrusted to appropriately nullualinulled and enullper
22、ienced peoplenull nullor nullhose use it has nulleen producednullPresentational connullentionsThe pronullisions onull this standard are presented in roman nullinullenull uprightnulltypenull Its renulluirements are enullpressed either as a set onull instructions or in sentences in nullhich the princi
23、pal aunulliliary nullernull is nullshallnullnullnullommentarynull enullplanation and general informatinulle material is presented in smaller italic typenull and does not constitute a normatinulle elementnullContractual and legal considerationsThis punulllication does not purport to include all the n
24、ecessary pronullisions onull a contractnull nullsers are responsinullle nullor its correct applicationnullConullpliance with a British Standard cannot confer inullnullunity fronulllegal onullligationsnullBRITISH STANDARDnull BSI 2009 null 1BS 2B 100:2009Section 1null nulleneral1 ScopeThis British St
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS2B1002009PROCEDUREFORINSPECTIONTESTINGANDACCEPTANCEOFWROUGHTCOPPERALLOYS 锻造 铜合金 检查 测试 验收 程序 PDF

链接地址:http://www.mydoc123.com/p-543370.html