ASTM E1802-2012(2018) Standard Test Methods for Wet Insulation Integrity Testing of Photovoltaic Modules《光伏组件湿绝缘完整性试验的标准试验方法》.pdf
《ASTM E1802-2012(2018) Standard Test Methods for Wet Insulation Integrity Testing of Photovoltaic Modules《光伏组件湿绝缘完整性试验的标准试验方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM E1802-2012(2018) Standard Test Methods for Wet Insulation Integrity Testing of Photovoltaic Modules《光伏组件湿绝缘完整性试验的标准试验方法》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E1802 12 (Reapproved 2018)Standard Test Methods forWet Insulation Integrity Testing of Photovoltaic Modules1This standard is issued under the fixed designation E1802; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the
2、 year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 These test methods provide procedures to determine theinsulation resistance of a photovoltaic (PV) module, i.
3、e. theelectrical resistance between the modules internal electricalcomponents and its exposed, electrically conductive, non-current carrying parts and surfaces.1.2 The insulation integrity procedures are a combination ofwet insulation resistance and wet dielectric voltage withstandtest procedures.1.
4、3 These procedures are similar to and reference theinsulation integrity test procedures described in Test MethodsE1462, with the difference being that the photovoltaic moduleunder test is immersed in a wetting solution during theprocedures.1.4 These test methods do not establish pass or fail levels.
5、The determination of acceptable or unacceptable results isbeyond the scope of these test methods.1.5 The values stated in SI units are to be regarded asstandard. No other units of measurement are included in thisstandard.1.6 This standard does not purport to address all of thesafety concerns, if any
6、, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety, health, and environmental practices and deter-mine the applicability of regulatory limitations prior to use.For specific precautionary statements, see Section 6.1.7 This international st
7、andard was developed in accor-dance with internationally recognized principles on standard-ization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recom-mendations issued by the World Trade Organization TechnicalBarriers to Trade (TBT) Committee.2.
8、 Referenced Documents2.1 ASTM Standards:2E772 Terminology of Solar Energy ConversionE1462 Test Methods for Insulation Integrity and GroundPath Continuity of Photovoltaic Modules3. Terminology3.1 DefinitionsDefinitions of terms used in this testmethod may be found in Terminology E772.3.2 Definitions
9、of Terms Specific to This Standard:3.2.1 insulation resistancethe electrical resistance of aphotovoltaic modules insulation, measured between the pho-tovoltaic circuit and exposed, electrically conductive non-current-carrying parts and surfaces of the module.4. Significance and Use4.1 The design of
10、a photovoltaic module or system intendedto provide safe conversion of the suns radiant energy intouseful electricity must take into consideration the possibility ofhazard should the user come into contact with the electricalpotential of the module or system. In addition, the insulationsystem provide
11、s a barrier to electrochemical corrosion, andinsulation flaws can result in increased corrosion and reliabilityproblems. These test methods describe procedures for verify-ing that the design and construction of the module providesadequate electrical isolation through normal installation anduse. At n
12、o location on the module should the PV generatedelectrical potential be accessible, with the obvious exception ofthe output leads. This isolation is necessary to provide for safeand reliable installation, use, and service of the photovoltaicsystem.4.2 This test method describes a procedure for deter
13、miningthe ability of the module to provide protection from electricalhazards. Its primary use is to find insulation flaws that could bedangerous to persons who may come into contact with the1These test methods are under the jurisdiction of ASTM Committee E44 onSolar, Geothermal and Other Alternative
14、 Energy Sources and are the directresponsibility of Subcommittee E44.09 on Photovoltaic Electric Power Conversion.Current edition approved May 1, 2018. Published May 2018. Originallyapproved in 1996. Last previous edition approved in 2012 as E1802 12. DOI:10.1520/E1802-12R18.2For referenced ASTM sta
15、ndards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken,
16、PA 19428-2959. United StatesThis international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recommendations issued by the World Trade Organization
17、 Technical Barriers to Trade (TBT) Committee.1module, especially when modules are wet. For example, theseflaws could be small holes in the encapsulation that allowhazardous voltages to be accessible on the outside surface of amodule after a period of high humidity.4.3 Insulation flaws in a module ma
18、y only become detect-able after the module has been wet for a certain period of time.For this reason, these procedures specify a minimum time amodule must be immersed prior to the insulation integritymeasurements.4.4 Electrical junction boxes attached to modules are oftendesigned to allow liquid wat
19、er, accumulated from condensedwater vapor, to drain. Such drain paths are usually designed topermit water to exit, but not to allow impinging water from rainor water sprinklers to enter. It is important that all surfaces ofjunction boxes be thoroughly wetted by spraying during thetests to enable the
20、se protective drain features to be properlytested. Therefore, drain holes should not be plugged or other-wise protected.4.5 These procedures may be specified as part of a series ofqualification tests involving performance measurements anddemonstration of functional requirements. Because insulationle
21、akage resistance and insulation current leakage are strongfunctions of module dimensions, ambient relative humidity,absorbed water vapor and other factors, it is the responsibilityof the user of these test methods to specify the minimumacceptable leakage resistance.5. Apparatus5.1 In addition to the
22、 apparatus required for the insulationintegrity measurements of Test Methods E1462, the followingapparatus is required:5.1.1 Wetting SolutionA solution of tap water and awetting agent3, with a surface tension of 0.03 N/m or less at 226 3C.5.1.2 Immersion TrayA tray containing the wetting solu-tion (
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME180220122018STANDARDTESTMETHODSFORWETINSULATIONINTEGRITYTESTINGOFPHOTOVOLTAICMODULES 组件 绝缘 完整性 试验

链接地址:http://www.mydoc123.com/p-529502.html