ASTM E1802-2007 Standard Test Methods for Wet Insulation Integrity Testing of Photovoltaic Modules《光电模件的隔湿完整性测试用标准试验方法》.pdf
《ASTM E1802-2007 Standard Test Methods for Wet Insulation Integrity Testing of Photovoltaic Modules《光电模件的隔湿完整性测试用标准试验方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM E1802-2007 Standard Test Methods for Wet Insulation Integrity Testing of Photovoltaic Modules《光电模件的隔湿完整性测试用标准试验方法》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E 1802 07Standard Test Methods forWet Insulation Integrity Testing of Photovoltaic Modules1This standard is issued under the fixed designation E 1802; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last re
2、vision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 These test methods provide procedures to determine theinsulation resistance of a photovoltaic (PV) module, i.e. theelectrica
3、l resistance between the modules internal electricalcomponents and its exposed, electrically conductive, non-current carrying parts and surfaces.1.2 The insulation integrity procedures are a combination ofwet insulation resistance and wet dielectric voltage withstandtest procedures.1.3 These procedu
4、res are similar to and reference theinsulation integrity test procedures described in Test MethodsE 1462, with the difference being that the photovoltaic moduleunder test is immersed in a wetting solution during theprocedures.1.4 These test methods do not establish pass or fail levels.The determinat
5、ion of acceptable or unacceptable results isbeyond the scope of these test methods.1.5 The values stated in SI units are to be regarded as thestandard.1.6 There is no similar or equivalent ISO standard.1.7 This standard does not purport to address all of thesafety concerns, if any, associated with i
6、ts use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use. For specificprecautionary statements, see Section 6.2. Referenced Documents2.1 ASTM Standards:2E 772 Terminology
7、 Relating to Solar Energy ConversionE 1328 Terminology Relating to Photovoltaic Solar EnergyConversionE 1462 Test Methods for Insulation Integrity and GroundPath Continuity of Photovoltaic Modules3. Terminology3.1 Definitions Definitions of terms used in this testmethod may be found in Terminology E
8、 772 and TerminologyE 1328.3.2 Definitions of Terms Specific to This Standard:3.2.1 insulation resistancethe electrical resistance of aphotovoltaic modules insulation, measured between the pho-tovoltaic circuit and exposed, electrically conductive non-current-carrying parts and surfaces of the modul
9、e.4. Significance and Use4.1 The design of a photovoltaic module or system intendedto provide safe conversion of the suns radiant energy intouseful electricity must take into consideration the possibility ofhazard should the user come into contact with the electricalpotential of the module or system
10、. In addition, the insulationsystem provides a barrier to electrochemical corrosion, andinsulation flaws can result in increased corrosion and reliabilityproblems. These test methods describe procedures for verify-ing that the design and construction of the module providesadequate electrical isolati
11、on through normal installation anduse. At no location on the module should the PV generatedelectrical potential be accessible, with the obvious exception ofthe output leads. This isolation is necessary to provide for safeand reliable installation, use, and service of the photovoltaicsystem.4.2 This
12、test method describes a procedure for determiningthe ability of the module to provide protection from electricalhazards. Its primary use is to find insulation flaws that could bedangerous to persons who may come into contact with themodule, especially when modules are wet. For example, theseflaws co
13、uld be small holes in the encapsulation that allowhazardous voltages to be accessible on the outside surface of amodule after a period of high humidity.4.3 Insulation flaws in a module may only become detect-able after the module has been wet for a certain period of time.For this reason, these proce
14、dures specify a minimum time amodule must be immersed prior to the insulation integritymeasurements.4.4 Electrical junction boxes attached to modules are oftendesigned to allow liquid water, accumulated from condensedwater vapor, to drain. Such drain paths are usually designed topermit water to exit
15、, but not to allow impinging water from rain1These test methods are under the jurisdiction of ASTM Committee E44 onSolar, Geothermal and Other Alternative Energy Sources and are the directresponsibility of Subcommittee E44.09 on Photovoltaic Electric Power Conversion.Current edition approved March 1
16、, 2007. Published April 2007. Originallyapproved in 1996. Last previous edition approved in 2001 as E 1802 01.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the st
17、andards Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.or water sprinklers to enter. It is important that all surfaces ofjunction boxes be thoroughly wetted by spraying during thetests to ena
18、ble these protective drain features to be properlytested. Therefore, drain holes should not be plugged or other-wise protected.4.5 These procedures may be specified as part of a series ofqualification tests involving performance measurements anddemonstration of functional requirements. Because insul
19、ationleakage resistance and insulation current leakage are strongfunctions of module dimensions, ambient relative humidity,absorbed water vapor and other factors, it is the responsibilityof the user of these test methods to specify the minimumacceptable leakage resistance.5. Apparatus5.1 In addition
20、 to the apparatus required for the insulationintegrity measurements of Test Methods E 1462, the followingapparatus is required:5.1.1 Wetting SolutionA solution of tap water and awetting agent3, with a surface tension of 0.03 N/m or less at 226 3C.5.1.2 Immersion Tray A tray containing the wetting so
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME18022007STANDARDTESTMETHODSFORWETINSULATIONINTEGRITYTESTINGOFPHOTOVOLTAICMODULES 光电 模件 完整性 测试 标准

链接地址:http://www.mydoc123.com/p-529500.html