ASTM D5903-1996(2006) Standard Guide for Planning and Preparing for a Groundwater Sampling Event《地下水取样结果的制备和规划标准指南》.pdf
《ASTM D5903-1996(2006) Standard Guide for Planning and Preparing for a Groundwater Sampling Event《地下水取样结果的制备和规划标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM D5903-1996(2006) Standard Guide for Planning and Preparing for a Groundwater Sampling Event《地下水取样结果的制备和规划标准指南》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D 5903 96 (Reapproved 2006)Standard Guide forPlanning and Preparing for a Groundwater Sampling Event1This standard is issued under the fixed designation D 5903; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year
2、of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide covers planning and preparing for a ground-water sampling event. It includes technical and administrati
3、veconsiderations and procedures. Example checklists are alsoprovided as Appendices.1.2 This guide may not cover every consideration proce-dure, or both, that is necessary before all ground-watersampling projects. In karst or fractured rock terranes, it may beappropriate to collect ground water sampl
4、es from springs (seeGuide D 5717). This guide focuses on sampling of groundwater from monitoring wells; however, most of the guidanceherein can apply to the sampling of springs as well.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is the
5、responsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.1.4 This guide offers an organized collection of informationor a series of options and does not recommend a specificcourse of acti
6、on. This document cannot replace education orexperience and should be used in conjunction with professionaljudgment. Not all aspects of this guide may be applicable in allcircumstances. This ASTM standard is not intended to repre-sent or replace the standard of care by which the adequacy ofa given p
7、rofessional service must be judged, nor should thisdocument be applied without consideration of a projects manyunique aspects. The word “Standard” in the title of thisdocument means only that the document has been approvedthrough the ASTM consensus process.2. Referenced Documents2.1 ASTM Standards:2
8、D 5717 Guide for Design of Ground-Water MonitoringSystems in Karst and Fractured-Rock Aquifers33. Significance and Use3.1 The success of a sampling event is influenced byadequate planning and preparation. Use of this guide will helpthe ground-water sampler to methodically execute the planningand pre
9、paration.3.2 This guide should be used by a professional or techni-cian that has training or experience in ground-water sampling.4. Considerations and Procedures4.1 Evaluate the scope of the sampling and analysis pro-gram.4.1.1 Review plans, protocols, and objectives of the sam-pling program and eve
10、nt. The sampler should review thesampling and analysis plan, site health and safety plan,sampling protocol, and quality assurance/quality control plan,when available. These documents will provide information onrequired sampling procedures and also should provide theinformation in the following parag
11、raphs.4.1.2 Determine which wells will be sampled. The samplershould have a map or diagram showing the locations of thewells to be sampled. Determine if there is a preferred wellsampling sequence specified in the sampling and analysis plan.4.1.3 Identify the laboratory analyses to be performed onsam
12、ples from each well. The analytical requirements are often,but not always, the same for each well. Determine if there is apreferred order in filling containers based on analytes.4.1.4 Identify data to be collected in the field. The samplermust know in advance what types of data must be collected int
13、he field (that is, chemical measurements, water level measure-ments, etc.) Many samplers use a form to record field data andother observations. The use of a form can help the sampler tocollect and record information in a consistent manner and canreduce the chance of failure to collect needed data.4.
14、1.5 Determine from what depth range within the well thesamples will be collected.4.1.6 Evaluate the need for specialized handling of purgedwater and decontamination wastewater. The waters may bereleased to the ground surface, discharged to a sanitary or1This guide is under the jurisdiction ofASTM Co
15、mmittee D18 on Soil and Rockand is the direct responsibility of Subcommittee D18.21 on Ground Water andVadose Zone Investigations.Current edition approved July 1, 2006. Published July 2006. Originally approvedin 1996. Last previous edition approved in 2001 as D 5903 96 (2001).2For referenced ASTM st
16、andards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Withdrawn.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West C
17、onshohocken, PA 19428-2959, United States.industrial sewer, or containerized and handled as a potentiallyhazardous waste. Hazardous wastes will require specializedlabeling, storage, transportation, and disposal.4.1.7 Identify all documentation and field quality controlprocedures stipulated in the sa
18、mpling and analysis plan orquality control plan.4.2 Review available information.4.2.1 Review well construction details. The sampler shouldknow the material of construction, the inside diameter, thecompletion depth, the screened interval, and the cap type andlock type (if locked). This information i
19、s needed to selectpurging and sampling equipment, and may be needed to selectother tools (for example, a strap wrench to remove the cap,boltcutters or a hack saw to remove damaged locks, or keys forlocks).4.2.2 Evaluate historical well performance and chemicalcharacteristics of the water from each w
20、ell, if available. Thebehavior of the well during past sampling events is usefulinformation in the planning process. This may include the flowrate in the screened interval, the maximum pumping rate, thetime required to purge the well, whether the well is easilybailed or pumped dry, etc. Knowledge of
21、 the past ground-waterchemistry and non-aqueous phase liquids in the well also canbe useful. The turbidity of the water may influence samplingmethods and the need for or approach to filtration of samples.Use of personal protective equipment also may be dictated byknown contamination of the water fro
22、m a well.4.2.3 Evaluate the physical setting of the well locations.This is necessary to determine the accessibility of the wells.Access could be impeded or difficult due to mud, snow, trees,fences, steep hills, secured areas, etc. This information willhelp the sampler determine what type of vehicle
23、is needed,whether special tools are needed, or whether administrativeclearances are required, or both.4.2.4 For wells with dedicated sampling equipment find outthe type of equipment, pump depth, whether there are anypackers in the well, where packers are set, and the powersource for equipment.4.3 Es
24、timate the time required to complete the samplecollection and associated field work. The amount of timerequired will affect equipment needs and possibly lodging orother administrative arrangements. It is usually necessary toinform the laboratory when samples should arrive at thelaboratory.4.4 Coordi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD590319962006STANDARDGUIDEFORPLANNINGANDPREPARINGFORAGROUNDWATERSAMPLINGEVENT 地下水 取样 结果 制备 规划 标准

链接地址:http://www.mydoc123.com/p-521020.html