ASTM B837-2001(2009) Standard Specification for Seamless Copper Tube for Natural Gas and Liquefied Petroleum (LP) Gas Fuel Distribution Systems《天然气和液化石油气(LP)燃料配送系统用无缝铜管的标准规范》.pdf
《ASTM B837-2001(2009) Standard Specification for Seamless Copper Tube for Natural Gas and Liquefied Petroleum (LP) Gas Fuel Distribution Systems《天然气和液化石油气(LP)燃料配送系统用无缝铜管的标准规范》.pdf》由会员分享,可在线阅读,更多相关《ASTM B837-2001(2009) Standard Specification for Seamless Copper Tube for Natural Gas and Liquefied Petroleum (LP) Gas Fuel Distribution Systems《天然气和液化石油气(LP)燃料配送系统用无缝铜管的标准规范》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: B837 01 (Reapproved 2009)Standard Specification forSeamless Copper Tube for Natural Gas and LiquifiedPetroleum (LP) Gas Fuel Distribution Systems1This standard is issued under the fixed designation B837; the number immediately following the designation indicates the year oforiginal adop
2、tion or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This specification establishes the requirements for TypeGAS seamless Cop
3、per UNS No. C12200 tube for use in aboveground natural gas and liquified petroleum (LP) gas fueldistribution systems, commonly assembled with flared fittingsor brazed joints.1.2 O60 (soft annealed) temper gas tube is produced in therange of standard sizes38 to78 in. outside diameter; H58(drawn gener
4、al purpose) temper gas tube is produced in therange of standard sizes38 to118 in. outside diameter.1.3 O60 (soft annealed) temper gas tube systems are nor-mally assembled with single 45 flared fittings, althoughbrazed connections using wrought or cast fittings may bepermitted by local or code requir
5、ements. H58 (drawn generalpurpose) temper gas tube systems are assembled with brazedconnections.NOTE 1Tube temper and applicable size are determined by installa-tion code requirements.1.4 Flared fittings used with seamless copper tube fornatural gas and liquified petroleum (LP) gas fuel distribution
6、systems shall be free of residual stresses.1.5 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.2. Referenced Documents2.1 ASTM Standards:
7、2B153 Test Method for Expansion (Pin Test) of Copper andCopper-Alloy Pipe and TubingB601 Classification for Temper Designations for Copperand Copper AlloysWrought and CastB846 Terminology for Copper and Copper AlloysE3 Guide for Preparation of Metallographic SpecimensE8 Test Methods for Tension Test
8、ing of Metallic MaterialsE18 Test Methods for Rockwell Hardness of Metallic Ma-terialsE29 Practice for Using Significant Digits in Test Data toDetermine Conformance with SpecificationsE53 Test Method for Determination of Copper in UnalloyedCopper by GravimetryE62 Test Methods for Chemical Analysis o
9、f Copper andCopper Alloys (Photometric Methods)E112 Test Methods for Determining Average Grain SizeE243 Practice for Electromagnetic (Eddy-Current) Exami-nation of Copper and Copper-Alloy TubesE255 Practice for Sampling Copper and Copper Alloys forthe Determination of Chemical Composition3. Terminol
10、ogy3.1 For general definitions of terms relating to copper andcopper alloys, refer to Terminology B846.3.2 Definitions:3.2.1 coil, na length of tube formed into a series ofconnected turns. The unqualified term “coil” as applied to tubeusually refers to a bunch coil.3.2.1.1 coil, bunched, na coil in
11、which turns are bunchedand held together such that a cross section of the bunched turnsis approximately circular.3.2.1.2 coil, double-layer flat, na coil in which the prod-uct is spirally wound into two connected disk-like layers suchthat one layer is on top of the other (a double-layer pancakecoil
12、or a double-layer spirally wound coil).3.2.1.3 coil, level or traverse wound, na coil in which theturns are wound into layers parallel to the axis of the coil suchthat successive turns in a given layer are adjoining one another(sometimes called a helical coil).1This specification is under the jurisd
13、iction ofASTM Committee B05 on Copperand Copper Alloys and is the direct responsibility of Subcommittee B05.04 on Pipeand Tube.Current edition approved Oct. 1, 2009. Published January 2010. Originallyapproved in 1993. Last previous edition approved in 2001 as B837 01. DOI:10.1520/B0837-01R09.2For re
14、ferenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, W
15、est Conshohocken, PA 19428-2959, United States.3.2.1.4 coil, single-layer flat, na coil in which the productis spirally wound into a single disk-like layer (a pancake coil ora single-layer spirally wound coil).3.2.2 liquified petroleum (LP) gas, nany of the followinghydrocarbons or mixtures of them:
16、 propane, propylene, butane(normal butane or isobutane) and butylene.3.2.3 tube, gas, ntube specifically intended for use inabove ground and natural gas and liquified petroleum gas fueldistribution systems and conforming to the particular dimen-sions known as Type GAS.3.3 Definitions of Terms Specif
17、ic to This Standard:3.3.1 “capable of”, adjas used in this specification thetest need not be performed by the producer of the material toconfirm capability. However, should subsequent testing by thepurchaser establish that the material did not conform to therequirements of this specification, the ma
18、terial shall be subjectto rejection.4. Ordering Information4.1 Include the following information in orders for product.4.1.1 Type GAS tube (Table 1),4.1.2 Standard size (Table 1),4.1.3 Temper (Sections 5 and 7),4.1.4 Whether tension tests, Rockwell Hardness tests, andgrain size determinations are re
19、quired (Section 8),4.1.5 Whether an expansion test is required (Section 9),4.1.6 Length (11.5Table 2),4.1.7 Whether the tube is to be furnished in straight lengthsor coils,4.1.8 Quantity: number of straight lengths or coils required,4.1.9 Certification, if required (Section 20), and4.1.10 Mill test
20、report, if required (Section 21).4.2 In addition, when material is purchased for agencies ofthe U.S. government, it shall conform to the SupplementaryRequirements as defined herein, when specified in the contractor purchase order.5. Materials and Manufacture5.1 The material shall be of such quality
21、and purity that thefinished tube shall have the properties and characteristicsprescribed in this specification and shall be cold drawn to size.5.2 The tube shall be finished by such cold-working andannealing operations as are necessary to produce the requiredtemper and surface finish.5.3 Tubes furni
22、shed in coils shall be annealed after coiling.5.4 Tubes in straight lengths shall be furnished in the H58(Drawn General Purpose) temper, except when the O60 (SoftAnneal) temper is specified in the purchase order or contract.6. Chemical Composition6.1 The material shall conform to the following chemi
23、calrequirements of Copper UNS No. C12200:Copper (incl. silver) 99.9 % min.Phosphorus 0.015 to 0.040 %6.2 These composition limits do not preclude the presenceof other elements. Limits for unnamed elements may beestablished by agreement between the manufacturer or supplierand the purchaser.7. Temper7
24、.1 Type GAS copper tube shall be furnished in either of thefollowing tempers as defined in Classification B601.Soft anneal O60Drawn general purpose H588. Mechanical Property Requirements8.1 The tube shall conform to the mechanical propertyrequirements specified in Table 3. Tension tests and grain si
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMB83720012009STANDARDSPECIFICATIONFORSEAMLESSCOPPERTUBEFORNATURALGASANDLIQUEFIEDPETROLEUMLPGASFUELDISTRIBUTIONSYSTEMS

链接地址:http://www.mydoc123.com/p-462443.html