ASTM A471-2008 Standard Specification for Vacuum-Treated Alloy Steel Forgings for Turbine Rotor Disks and Wheels.pdf
《ASTM A471-2008 Standard Specification for Vacuum-Treated Alloy Steel Forgings for Turbine Rotor Disks and Wheels.pdf》由会员分享,可在线阅读,更多相关《ASTM A471-2008 Standard Specification for Vacuum-Treated Alloy Steel Forgings for Turbine Rotor Disks and Wheels.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: A 471 08Standard Specification forVacuum-Treated Alloy Steel Forgings for Turbine RotorDisks and Wheels1This standard is issued under the fixed designation A 471; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the yea
2、r of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope*1.1 This specification covers vacuum-treated alloy steelforgings intended for use as turbine rotor disks and wheels.
3、1.2 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.3 This standard does not purport to address all of thesafety concerns, if any, asso
4、ciated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2A 275/A 275M Practice for Magnetic Particle Examinationof
5、 Steel ForgingsA 370 Test Methods and Definitions for Mechanical Testingof Steel ProductsA 388/A 388M Practice for Ultrasonic Examination ofHeavy Steel ForgingsA 788/A 788M Specification for Steel Forgings, GeneralRequirementsE30 Test Methods for Chemical Analysis of Steel, CastIron, Open-Hearth Iro
6、n, and Wrought Iron3E 139 Test Methods for Conducting Creep, Creep-Rupture,and Stress-Rupture Tests of Metallic Materials3. Ordering Information3.1 In addition to the ordering information required bySpecification A 788/A 788M, the purchaser shall include withthe inquiry and order, the class of steel
7、, alternative maximumfor silicon content (see Table 1), the choice of yield strengthoffset (0.2 or 0.02 %), and any tests, supplementary require-ments, and purchase options desired.3.2 Forging DrawingEach forging shall be manufacturedin accordance with a purchaser-supplied drawing showing thefinishe
8、d dimensions and the locations of mechanical testspecimens.3.3 Supplementary requirements are provided and shallapply only when specified in the purchasers order.4. Materials and Manufacture4.1 Melting Process:4.1.1 The steel shall be made by the basic electric-furnaceprocess.4.1.2 Provisions for su
9、bsequent secondary melting of thesteel by the consumable electrode-electroslag or vacuum-arcremelting processes are included in Supplementary Require-ment S4.4.2 Vacuum TreatmentThe vacuum degassing require-ments of Specification A 788/A 788M are mandatory.4.2.1 The molten steel shall be vacuum trea
10、ted prior to orduring the pouring of the ingot in order to remove objection-able gases, particularly hydrogen.4.2.1.1 When the vacuum stream degassing process4isused, the vacuum system must be of sufficient capacity to effecta blank-off pressure low enough (usually less than 1000 m) tobreak up the n
11、ormal tight, rope-like stream of molten metalinto a wide-angled conical stream of relatively small droplets.The capacity of the system must also be sufficiently high toreduce the initial surge pressure at the start of the pour to a lowlevel within 2 min.4.2.1.2 When the vacuum-lift process4is utiliz
12、ed, the mol-ten metal shall be repeatedly drawn into the evacuated vessel togive a recirculation factor (Note 1) of at least 2.5 to ensurethorough degassing and mixing of the entire heat. The evacu-ation system shall be capable of reducing the pressure surges,which occur each time a new portion of s
13、teel is admitted to thevessel, to increasingly lower levels until a blank-off pressure(usually less than 1000 m) is achieved.NOTE 1The recirculation factor is obtained as follows:1This specification is under the jurisdiction of ASTM Committee A01 on Steel,Stainless Steel and Related Alloys and is th
14、e direct responsibility of SubcommitteeA01.06 on Steel Forgings and Billets.Current edition approved Oct. 1, 2008. Published October 2008. Originallyapproved in 1962. Last previous edition approved in 2006 as A 471 06.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact AS
15、TM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Withdrawn.4Details of the vacuum stream degassing process may be found in the Journalof the Iron and Steel Institute, Vol 191, January 1959; “
16、Vacuum Pouring of Ingotsfor Heavy Forgings” by J. H. Stoll.1*A Summary of Changes section appears at the end of this standard.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.tons of steel lifted per cycle 3 number of cyclesheat weight
17、 in tons4.2.1.3 When the ladle degassing process is used, theevacuation system shall be capable of reducing the systemvacuum pressure to a low level (usually less than 1000 m).The molten metal shall be adequately stirred for a sufficientlength of time to maximize exposure to the evacuated atmo-spher
18、e. When this process is used, hydrogen testing perSupplemental Requirement S2 is mandatory.4.2.1.4 Other methods of degassing may be used if thesupplier can demonstrate their adequacy to the satisfaction ofthe purchaser. When other processes are used, hydrogen testingper the supplemental requirement
19、 S2 is mandatory.4.3 DiscardSufficient discard shall be taken from eachingot to secure freedom from pipe and undue segregation in thefinished forging.4.4 Forging ProcessThe forgings shall receive their hotmechanical work under a press, hammer, or mill of sufficientpower to work the metal throughout
20、its section. The forgingsshall be upset by forming from a block having an axial lengthbefore upsetting of at least two times the thickness of theforging after upsetting.4.4.1 The as-forged dimensions of each forging shall beplanned so the metal is shaped by forging as close as ispractical to the dim
21、ensions shown on the purchasers drawingso as to keep subsequent machining to a minimum.4.4.2 The axial center of the forging shall be maintained incommon with the axial center of the ingot.4.5 Heat Treatment:4.5.1 Cooling Prior to Heat TreatmentAfter forging andbefore reheating for heat treatment, t
22、he forging shall beallowed to cool in a manner to prevent damage and toaccomplish transformation.4.5.2 Preliminary Heat TreatmentThe forgings shall begiven such preliminary heat treatment as is proper for thedesign and composition. The forgings shall be heated to asuitable temperature for a sufficie
23、nt length of time for completeaustenitization and shall be suitably cooled to bring aboutcomplete transformation.4.5.3 Heat Treatment for Mechanical PropertiesThe forg-ings shall be reheated to a temperature above the upper criticaltemperature, held a sufficient length of time for completeaustenitiz
24、ation, and liquid quenched.4.5.4 Tempering TemperatureThe forgings shall be tem-pered to develop the specified properties. The final temperingtemperature for Class 1 to 6 and 11 through 14 shall be not lessthan 1100F (593C), and for Class 10 not less than 1200F(649C). The forgings shall be cooled un
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMA4712008STANDARDSPECIFICATIONFORVACUUMTREATEDALLOYSTEELFORGINGSFORTURBINEROTORDISKSANDWHEELSPDF

链接地址:http://www.mydoc123.com/p-458425.html