ARMY UFGS-32 01 17 16-2008 SEALING OF CRACKS IN BITUMINOUS PAVEMENTS《沥青路面上的裂缝的封缝》.pdf
《ARMY UFGS-32 01 17 16-2008 SEALING OF CRACKS IN BITUMINOUS PAVEMENTS《沥青路面上的裂缝的封缝》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-32 01 17 16-2008 SEALING OF CRACKS IN BITUMINOUS PAVEMENTS《沥青路面上的裂缝的封缝》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 17.16 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 17 16 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 01 17.1
2、6SEALING OF CRACKS IN BITUMINOUS PAVEMENTS08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.2 Payment1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Routing Equipment1.3.2 Concrete Saw1.3.3 Sandblasting Equipment1.3.4 Waterblasting Equipment1.3.5 Hand Tools1.3.6 Crack Sealing Equipment1.4 SUBMITTALS1
3、.5 QUALITY ASSURANCE1.6 DELIVERY, STORAGE, AND HANDLING1.7 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 SEALANTS2.2 BACKUP MATERIALSPART 3 EXECUTION3.1 PREPARATION OF CRACKS3.1.1 Cracks3.1.1.1 Hairline Cracks3.1.1.2 Small Cracks3.1.1.3 Medium Cracks3.1.1.4 Large Cracks3.1.2 Existing Sealant Removal3
4、.1.3 Routing3.1.4 Sawing3.1.5 Sandblasting3.1.6 Backup MaterialSECTION 32 01 17.16 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1.7 Rate of Progress of Crack Preparation3.2 PREPARATION OF SEALANT3.3 INSTALLATION OF SEALANT3.3.1 Time of App
5、lication3.3.2 Sealing the Crack3.4 CRACK SEALANT INSTALLATION TEST SECTION3.5 CLEANUP3.6 QUALITY CONTROL PROVISIONS3.6.1 Crack Cleaning3.6.2 Crack Seal Application Equipment3.6.3 Crack Sealant- End of Section Table of Contents -SECTION 32 01 17.16 Page 2Provided by IHSNot for ResaleNo reproduction o
6、r networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 17.16 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 17 16 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 32 01 17.16SEALING
7、 OF CRACKS IN BITUMINOUS PAVEMENTS08/08*NOTE: This guide specification covers the requirements for sealing cracks in bituminous pavements.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert a
8、ppropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponent
9、s, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: For additional information concerning bituminous pavements, see UFC 3-250-03, “Bituminous Pavements Standard
10、 Practice.“*1.1 UNIT PRICES*NOTE: Paragraphs Measurement and Payment will be deleted for lump sum bidding.*SECTION 32 01 17.16 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.1 MeasurementDetermine the quantity of each sealing item to be pa
11、id for by actual measurement of the number of linear meters feet of in-place material that has been approved.1.1.2 PaymentPayment will be made at the contract unit bid prices per linear meter foot for the sealing items scheduled. Include in the unit bid prices the cost of all labor, materials, and t
12、he use of all equipment and tools required to complete the work.1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, desi
13、gnation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used
14、in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by
15、 the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM C 509 (2006) Elastomeric Cellular Preformed Gasket and Sealing MaterialASTM D 6690 (2007) Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt PavementsASTM D 789 (2007) Determination of Relative Viscosity and Moisture Content of P
16、olyamide (PA)1.3 SYSTEM DESCRIPTIONMachines, tools, and equipment used in the performance of the work required by this section shall be approved before the work is started and shall be maintained in satisfactory condition at all times.SECTION 32 01 17.16 Page 4Provided by IHSNot for ResaleNo reprodu
17、ction or networking permitted without license from IHS-,-,-1.3.1 Routing Equipment*NOTE: Rotary impact routers that are equipped with vertical sided, carbide tipped bits have been used successfully to rout cracks in bituminous pavements. Impact routers that are not equipped with carbide tipped bits
18、normally chip and damage the surrounding pavement and should not be permitted.*Provide routing equipment which is a self-powered machine operating a power driven tool or bit specifically designed for routing bituminous pavements. The bit shall rotate about a vertical axis at sufficient speed to cut
19、a smooth vertical-walled reservoir in the pavement surface and shall maintain accurate cutting without damaging the sides or top edges of the reservoir. Provide a router capable of following the trace of the crack without deviation. The use of rotary impact routing devices will not be permitted for
20、cleaning cracks.may be permitted if vertical-sided carbide tipped bits are used.1.3.2 Concrete SawProvide a self-propelled power saw with small diameter (152 mm 6 inches or less) water-cooled diamond or abrasive saw blades for cutting cracks to the depths and widths specified and for removing filler
21、 that is embedded in the cracks or adhered to the crack faces. The diameter of the saw blade shall be small enough to allow the saw to closely follow the trace of the crack.1.3.3 Sandblasting Equipment*NOTE: Sandblasting of cracks may not be permitted under certain conditions. Blowing sand and dust
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS320117162008SEALINGOFCRACKSINBITUMINOUSPAVEMENTS 沥青路面 裂缝 PDF

链接地址:http://www.mydoc123.com/p-449705.html