1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 16.17 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 16.17 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 01 16.1
2、7COLD MILLING OF BITUMINOUS PAVEMENTS08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.2 Payment1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Cold-Milling Machine1.3.2 Cleaning Equipment1.3.3 Straightedge1.4 QUALITY ASSURANCE1.4.1 Grade1.4.2 Surface Smoothness1.4.3 Traffic Control1.5 ENVIRONMENTAL
3、REQUIREMENTSPART 2 PRODUCTS (Not Applicable)PART 3 EXECUTION3.1 PREPARATION OF SURFACE3.2 MILLING OPERATION3.3 GRADE AND SURFACE-SMOOTHNESS TESTING3.3.1 Grade-Conformance Tests3.3.2 Surface-Smoothness Tests3.4 REMOVAL OF MILLED MATERIAL- End of Section Table of Contents -SECTION 32 01 16.17 Page 1Pr
4、ovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 16.17 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 16.17 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMR
5、L dated July 2008*SECTION 32 01 16.17COLD MILLING OF BITUMINOUS PAVEMENTS08/08*NOTE: This guide specification covers the requirements for cold milling of bituminous pavement for airfields, roads, streets, parking areas, and other general applications.Edit this guide specification for project specifi
6、c requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are
7、 welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*N
8、OTE: This guide specification can be used to specify cold milling alone on structurally sound pavements for surface texturing to increase skid resistance of a worn pavement, or for pavement removal to restore roadway geometry. Cold milling can also be used in conjunction with asphalt overlays produc
9、ed from hot or cold recycling of the milled material or from virgin materials to provide structural improvement to distressed pavements.On the project drawings, show:1. Location and extent of pavement.SECTION 32 01 16.17 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted with
10、out license from IHS-,-,-2. Required elevation of finish surface of new pavement.3. Section indicating in mm (inches) the depth that existing pavement has to be removed.4. Location of existing manholes, valve boxes and utility lines.*1.1 UNIT PRICES*NOTE: Delete these paragraphs when lump-sum biddin
11、g is used.*1.1.1 MeasurementThe quantity of milled pavement will be the number of square meters yards completed and accepted as determined by the Contracting Officer. Determine the number of square meters yards of milled pavement by measuring the length and width of the milled surface within the spe
12、cified work area. Measurement to determine the area shall be to the closest mm inch for width and the closest meter foot for length.1.1.2 PaymentPayment will be to the nearest square meter yard. No payment will be made for milling outside the specified area of work.1.2 REFERENCES*NOTE: This paragrap
13、h is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outs
14、ide of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you
15、choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.SECTION 32 01 16.17 Page 3Provided by IHSNot for ResaleNo reproduction
16、 or networking permitted without license from IHS-,-,-ASTM INTERNATIONAL (ASTM)ASTM C 136 (2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates1.3 SYSTEM DESCRIPTIONMaintain in a satisfactory working condition equipment, tools, and machines used in the performance of the work.
17、1.3.1 Cold-Milling MachineProvide a cold-milling machine which is self-propelled, capable of milling the pavement to a specified depth and smoothness and of establishing grade control; with means of controlling transverse slope and dust produced during the pavement milling operation. The machine sha
18、ll have the ability to windrow the millings or cuttings remove the millings or cuttings from the pavement and load them into a truck. The milling machine shall not cause damage to any part of the pavement structure that is not to be removed.1.3.2 Cleaning EquipmentProvide cleaning equipment suitable
19、 for removing and cleaning loose material from the pavement surface.1.3.3 StraightedgeFurnish and maintain at the site, in good condition, one 3.66 meter 12 foot straightedge or other suitable device for each milling machine, for testing the finished surface. Make straightedge available for Governme
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS320116172008COLDMILLINGOFBITUMINOUSPAVEMENTS 沥青路面 冷铣创 PDF

链接地址:http://www.mydoc123.com/p-449704.html