ARMY UFGS-32 01 13-2008 BITUMINOUS SEAL AND FOG COATS《沥青封层及雾化沥青封层》.pdf
《ARMY UFGS-32 01 13-2008 BITUMINOUS SEAL AND FOG COATS《沥青封层及雾化沥青封层》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-32 01 13-2008 BITUMINOUS SEAL AND FOG COATS《沥青封层及雾化沥青封层》.pdf(20页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 13 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 13 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 01 13BITUMINO
2、US SEAL AND FOG COATS08/08PART 1 GENERAL1.1 MEASUREMENT AND PAYMENT PROCEDURES1.1.1 Bituminous Material Measurement Methods1.1.2 Aggregate Measurement Methods1.1.3 Payment1.1.4 Waybills and Delivery Tickets1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Equipment, Plant and Tools1.3.2 Bituminous Distribut
3、ors1.3.3 Aggregate Spreader1.3.4 Pneumatic-Tired Roller1.3.5 Power Brooms and Power Blowers1.3.6 Scales1.3.7 Weighhouse1.3.8 Storage Tanks1.3.9 Power Rollers1.3.10 Single-Pass, Surface-Treatment Machines1.3.11 Vacuum Sweepers for Fog Seal1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Samples1.5.2 Aggregat
4、es Source1.5.3 Bituminous Material Source1.5.4 Equipment Calibration1.6 DELIVERY, STORAGE, AND HANDLING1.7 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 BITUMINOUS MATERIAL FOR SEAL COAT2.2 AGGREGATE FOR SEAL COAT2.2.1 Coarse Aggregate2.2.1.1 Film Retention2.2.1.2 Particle ShapesSECTION 32 01 13 Page
5、 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.1.3 Weight Loss2.2.1.4 Friable Particles2.2.1.5 Crushed Slag2.2.1.6 Crushed Aggregate2.2.2 Fine Aggregate2.3 ANTISTRIPPING AGENT2.4 EMULSIFIED ASPHALT FOR FOG SEAL2.5 WATERPART 3 EXECUTION3.1 PREP
6、ARATION OF SURFACE3.2 SEAL COAT APPLICATION3.2.1 Rate3.2.2 Temperature3.2.3 Application of Bituminous Material3.2.4 Aggregate Application Rate3.2.5 Application of Aggregate3.2.6 Rolling and Brooming3.3 FIELD QUALITY CONTROL - SEAL COAT3.3.1 Tests3.3.1.1 Gradation3.3.1.2 Abrasion Resistance3.3.1.3 St
7、ripping3.3.2 Bituminous Material Sample3.4 TRIAL APPLICATION - SEAL COAT3.5 FOG SEAL APPLICATION3.5.1 Sample Application3.5.2 Application Inspection3.5.3 Inspection Reports3.5.4 Application3.6 SITE PROTECTION3.7 TRAFFIC CONTROL- End of Section Table of Contents -SECTION 32 01 13 Page 2Provided by IH
8、SNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 13 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 13 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*
9、SECTION 32 01 13BITUMINOUS SEAL AND FOG COATS08/08*NOTE: This guide specification covers the requirements for bituminous surface coatings for low volume roads, parking areas, and other general applications.Edit this guide specification for project specific requirements by adding, deleting, or revisi
10、ng text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the techni
11、cal proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Bituminous seal coat should not be used
12、on primary roads or airfield areas. Fog seals lower the frictional resistance of paved surfaces and will not be used on runways, high speed taxiway turnoffs, or moderate to high speed roads unless approval is obtained from NAVFACENGCOMHQ, AFCESA or the TSMCX.This section must be edited to remove all
13、 references to Fog Seal when it is not required in the project.UFC 3-250-03 should be used for guidance in preparing these specifications.*SECTION 32 01 13 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1 MEASUREMENT AND PAYMENT PROCEDURES*N
14、OTE: Delete this paragraph when lump sum bidding is used.*Measure the quantities of bituminous material and aggregate used in the accepted work and to be paid for, provided that the measured quantities are not more than 10 percent over the specified application rate. Any amount of bituminous materia
15、l and aggregate more than 10 percent over the specified application rate for each application will be deducted from the measured quantities except for irregular areas where hand spraying of the bituminous material and hand spreading of the aggregate is necessary.1.1.1 Bituminous Material Measurement
16、 Methods*NOTE: When the bituminous material is measured in liters (gallons), the appropriate ASTM method will be retained for the type of bituminous material specified.*The amount of bituminous material to be paid for will be measured in metric2000 pound tons, L at 15.6 degrees C gallons at 60 degre
17、es F. Correct volumes measured at temperatures other than 15.6 degrees C 60 degrees F in accordance with ASTM D 633 ASTM D 1250 , using a coefficient of expansion of 0.00045 per degree C 0.00025 per degree F for asphalt emulsion.1.1.2 Aggregate Measurement MethodsThe amount of aggregate to be paid f
18、or will be measured in metric tons tons cubic meters yards of dry aggregate. Measurement of the materials shall be by approved weigh scales determining the volume capacity of each vehicle delivering the material to the site of the work or stockpiles.1.1.3 Payment*NOTE: Delete this paragraph when lum
19、p sum bidding is used.*The quantities of aggregate and bituminous material, determined as specified above, will be paid for at the respective contract unit prices. Payment will constitute full compensation for all operations necessary to complete the work as specified herein.1.1.4 Waybills and Deliv
20、ery Tickets*NOTE: Delete this paragraph when lump sum bidding is used.*Do not remove bituminous material from the tank car or storage tank until SECTION 32 01 13 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-measurements of the remaining quan
21、tity have been taken.1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3201132008BITUMINOUSSEALANDFOGCOATS 沥青 雾化 PDF

链接地址:http://www.mydoc123.com/p-449703.html