1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 11.52 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 11.52 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 01 11.5
2、2RUNWAY RUBBER REMOVAL08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.2 Payment1.2 SYSTEM DESCRIPTION1.2.1 RUBBER REMOVAL EQUIPMENT1.2.1.1 Waterblasting Equipment1.2.1.2 Shotblasting Equipment1.2.1.3 Sandblasting Equipment1.2.2 Chemical Rubber Removal Equipment1.3 SUBMITTALS1.4 QUALITY ASSURA
3、NCE1.4.1 Maintenance of Traffic1.4.2 Landing and Take-Offs1.5 DELIVERY, STORAGE, AND HANDLING1.6 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS (Not Applicable)PART 3 EXECUTION3.1 RUBBER REMOVAL3.2 CLEANUP AND WASTE DISPOSAL- End of Section Table of Contents -SECTION 32 01 11.52 Page 1Provided by IHSNot
4、for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 11.52 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 11.52 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008
5、*SECTION 32 01 11.52RUNWAY RUBBER REMOVAL08/08*NOTE: This guide specification covers the requirements for runway rubber removal.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate
6、 information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, includi
7、ng their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 UNIT PRICES1.1.1 MeasurementRubber removal will be measured by the number of square meters feet of runway to be cleaned.1
8、.1.2 PaymentRubber removal will be paid for at the contract unit price per square meter foot of runway rubber removed.SECTION 32 01 11.52 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.2 SYSTEM DESCRIPTION1.2.1 RUBBER REMOVAL EQUIPMENTMechan
9、ical rubber removal equipment includes waterblasting, shotblasting, sandblasting, or other approved nonchemical systems. Control equipment to be used on asphalt or tar concrete to remove rubber accumulations and minimize disturbance to asphalt or tar mixtures. Equipment to be used on portland cement
10、 concretes shall be controlled to remove rubber accumulations and prevent removal of hardened paste from the concrete. Basic hand tools and the following major types of mechanical equipment will be considered acceptable for this project.1.2.1.1 Waterblasting EquipmentProvide mobile waterblasting equ
11、ipment capable of producing a pressurized stream of water that will effectively remove rubber from the pavement surface without significantly damaging the pavement. Regulate water pressure so that substantially all rubber accumulations are removed during execution of the work.1.2.1.2 Shotblasting Eq
12、uipmentProvide mobile self propelled shotblasting equipment capable of producing an adjustable depth of rubber removal and of propelling abrasive particles at high velocities on the rubber for effective removal. Each unit shall be self cleaning and self contained. Provide equipment able to confine t
13、he abrasive, any dust that is produced, and removed rubber; and capable of recycling the abrasive for reuse.1.2.1.3 Sandblasting EquipmentProvide mobile sandblasting equipment capable of producing a pressurized stream of sand and air that will effectively remove rubber from the pavement surface with
14、out filling voids with debris in asphalt or tar pavements or removing joint sealants in portland cement concrete pavements. Include with the equipment an air compressor, hoses, and nozzles of adequate size and capacity for removing all rubber. Equip the compressor with traps that will maintain the c
15、ompressed air free of oil and water, and capable of furnishing a flow rate of at least 0.071 cubic meters/second 150 cubic feet/minute of air at a pressure of at least 621 kPa90 psi at each nozzle.1.2.2 Chemical Rubber Removal EquipmentChemical equipment shall be capable of application and removal o
16、f chemicals from the pavement surface and shall leave only non-toxic biodegradable residue.1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals shoul
17、d be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the SECTION 32 01 11.52 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-submittal requires Government approval. Some submittals are a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS320111522008RUNWAYRUBBERREMOVAL 跑道 橡胶 清除 PDF

链接地址:http://www.mydoc123.com/p-449702.html