1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 00 00 (August 2008)-Preparing Activity: USACE SupersedingUFGS-31 00 00 (July 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 00 00EARTHWORK08/08PART 1
2、GENERAL1.1 MEASUREMENT PROCEDURES1.1.1 Excavation1.1.2 Piping Trench Excavation1.1.3 Rock Excavation for Trenches1.1.4 Topsoil Requirements1.1.5 Overhaul Requirements1.1.6 Select Granular Material1.2 PAYMENT PROCEDURES1.2.1 Classified Excavation1.2.2 Piping Trench Excavation1.2.3 Rock Excavation for
3、 Trenches1.2.4 Unclassified Excavation1.2.5 Classified Borrow1.2.6 Unclassified Borrow1.2.7 Authorized Overhaul1.2.8 Sheeting and Bracing1.2.8.1 Timber Sheeting1.2.8.2 Steel Sheeting and Soldier Piles1.3 CRITERIA FOR BIDDING1.4 REFERENCES1.5 DEFINITIONS1.5.1 Satisfactory Materials1.5.2 Unsatisfactor
4、y Materials1.5.3 Cohesionless and Cohesive Materials1.5.4 Degree of Compaction1.5.5 Overhaul1.5.6 Topsoil1.5.7 Hard/Unyielding Materials1.5.8 Rock1.5.9 Unstable Material1.5.10 Select Granular Material1.5.10.1 General Requirements1.5.10.2 California Bearing Ratio Values1.5.11 Initial Backfill Materia
5、lSECTION 31 00 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.5.12 Expansive Soils1.5.13 Nonfrost Susceptible (NFS) Material1.5.14 Pile Supported Structure1.6 SYSTEM DESCRIPTION1.6.1 Classification of Excavation1.6.1.1 Common Excavation1.
6、6.1.2 Rock Excavation1.6.2 Blasting1.6.3 Dewatering Work Plan1.7 SUBMITTALSPART 2 PRODUCTS2.1 REQUIREMENTS FOR OFFSITE SOILS2.2 BURIED WARNING AND IDENTIFICATION TAPE2.2.1 Warning Tape for Metallic Piping2.2.2 Detectable Warning Tape for Non-Metallic Piping2.3 DETECTION WIRE FOR NON-METALLIC PIPING2
7、.4 MATERIAL FOR RIP-RAP2.4.1 Bedding Material2.4.2 Grout2.4.3 Rock2.5 CAPILLARY WATER BARRIER2.6 PIPE CASING2.6.1 Casing Pipe2.6.2 Wood SupportsPART 3 EXECUTION3.1 STRIPPING OF TOPSOIL3.2 GENERAL EXCAVATION3.2.1 Ditches, Gutters, and Channel Changes3.2.2 Drainage Structures3.2.3 Drainage3.2.4 Dewate
8、ring3.2.5 Trench Excavation Requirements3.2.5.1 Bottom Preparation3.2.5.2 Removal of Unyielding Material3.2.5.3 Removal of Unstable Material3.2.5.4 Excavation for Appurtenances3.2.5.5 Jacking, Boring, and Tunneling3.2.6 Underground Utilities3.2.7 Structural Excavation3.3 SELECTION OF BORROW MATERIAL
9、3.4 OPENING AND DRAINAGE OF EXCAVATION AND BORROW PITS3.5 SHORING3.5.1 General Requirements3.5.2 Geotechnical Engineer3.6 GRADING AREAS3.7 FINAL GRADE OF SURFACES TO SUPPORT CONCRETE3.8 GROUND SURFACE PREPARATION3.8.1 General Requirements3.8.2 Frozen Material3.9 UTILIZATION OF EXCAVATED MATERIALS3.1
10、0 BURIED TAPE AND DETECTION WIRE3.10.1 Buried Warning and Identification Tape3.10.2 Buried Detection Wire3.11 BACKFILLING AND COMPACTION3.11.1 Trench BackfillSECTION 31 00 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.11.1.1 Replacement
11、of Unyielding Material3.11.1.2 Replacement of Unstable Material3.11.1.3 Bedding and Initial Backfill3.11.1.4 Final Backfill3.11.2 Backfill for Appurtenances3.12 SPECIAL REQUIREMENTS3.12.1 Gas Distribution3.12.2 Water Lines3.12.3 Heat Distribution System3.12.4 Electrical Distribution System3.12.5 Sew
12、age Absorption Trenches or Pits3.12.5.1 Porous Fill3.12.5.2 Cover3.12.6 Pipeline Casing3.12.6.1 Bore Holes3.12.6.2 Cleaning3.12.6.3 End Seals3.12.7 Rip-Rap Construction3.12.7.1 Bedding Placement3.12.7.2 Stone Placement3.12.7.3 Grouting3.13 EMBANKMENTS3.13.1 Earth Embankments3.13.2 Rock Embankments3.
13、14 SUBGRADE PREPARATION3.14.1 Proof Rolling3.14.2 Construction3.14.3 Compaction3.14.3.1 Subgrade for Railroads3.14.3.2 Subgrade for Pavements3.14.3.3 Subgrade for Shoulders3.14.3.4 Subgrade for Airfield Pavements3.15 SHOULDER CONSTRUCTION3.16 FINISHING3.16.1 Subgrade and Embankments3.16.2 Capillary
14、Water Barrier3.16.3 Grading Around Structures3.17 PLACING TOPSOIL3.18 TESTING3.18.1 Fill and Backfill Material Gradation3.18.2 In-Place Densities3.18.3 Check Tests on In-Place Densities3.18.4 Moisture Contents3.18.5 Optimum Moisture and Laboratory Maximum Density3.18.6 Tolerance Tests for Subgrades3
15、.18.7 Displacement of Sewers3.19 DISPOSITION OF SURPLUS MATERIAL- End of Section Table of Contents -SECTION 31 00 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-31 00 00 (August 2008)-Preparing Activity:
16、 USACE SupersedingUFGS-31 00 00 (July 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 31 00 00EARTHWORK08/08*NOTE: This guide specification covers the requirements for earthwork activities for buildings, utilities, roadways, railroads, and ai
17、rfields.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present
18、.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submi
19、tted as a Criteria Change Request (CCR).This guide specification includes tailoring options for topsoil and borrow. Selection or deselection of a tailoring option will include or exclude that option in the section, but editing the resulting section to fit the project is still required.*PART 1 GENERA
20、L*NOTE: Consult with a soils engineer while editing this section to determine specific requirements for each job.The following information will be indicated on the project drawings:1. Surface elevations, existing and new;SECTION 31 00 00 Page 4Provided by IHSNot for ResaleNo reproduction or networki
21、ng permitted without license from IHS-,-,-2. Location of underground obstructions and existing utilities;3. Location and record of soil borings and test pits. Include ground water observations and topsoil thickness encountered in boring, soil classifications, and properties such as moisture content
22、and Atterberg limit determinations;4. Location of borrow and disposal area if located on Government property;5. Clearing stripping and grubbing limits, if different from clearing limits;6. Areas to be seeded;7. Hydrological data where available;8. Shoring and sheeting required (trench protection is
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3100002008EARTHWORK 土方工程 PDF