ARMY MIL-T-62222-1985 TANK COMBAT FULL TRACKED 105MM GUN M48A5《M48A5型105MM全履带作扎坦克》.pdf
《ARMY MIL-T-62222-1985 TANK COMBAT FULL TRACKED 105MM GUN M48A5《M48A5型105MM全履带作扎坦克》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-T-62222-1985 TANK COMBAT FULL TRACKED 105MM GUN M48A5《M48A5型105MM全履带作扎坦克》.pdf(66页珍藏版)》请在麦多课文档分享上搜索。
1、i 1- ii 1. SCOPE 1.1 Scope. This specification covers one type of full-tracked, armored combat vehicle, which mounts a 105MM gun as the primary weapon. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications, standards, and handbooks. Unless otherwise specified, the following specific
2、ations, standards, and handbooks of the issue Listed in that issue of the Department of Defense Index of Specifications and Standards (DoDISS) Specified in the solicitation form a part of this specification to the extent specified herein. 1 July 1985 SUPERSEDING (see 6.7) MILITARY SPECIFICATION TANK
3、, COMBAT, FULL-TRACKED: 105MM GUN, M48A5 This specification is approved for use by US Army Tank-Automotive Command, Department of the Army, and is available for use by all Departments and Agencies of the Department of Defense. Beneficial comments (recommendations, additions, deletions) and any perti
4、nent data which may be of use in improving this document should be addressed to: US Army Tank-Automotive Command, ATTN: AMSTA-GSS, Warren, MI 48397-5000, by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document, or by letter. FSC
5、2350 DISTRIRUTION STATEMENT A. Approved for public release; distribution is unlimited. I THIS DOCUMENT CONTAINS 66 PAGES Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-62222 23 m 7777706 0203772 O MIL-T-62222(AT) SPECIFICATIONS FEDERAL TT-E-52
6、7 W-F-800 MILITARY MIL-L-2104 MIL-E-52798 MIL-T-62050 - Enamel, Alkyd, Lusterless. - Fuel Oil, Diesel. - Lubricating Oil, Internal Combustion Engine, Tactical Services. - Enamel, Alkyd, Camouflage. - Tank, Combat, Full Tracked; 105MM Gun, M48A5, Processing for Stowage and Shipment of. L STANDARDS FE
7、DERAL FED-STD-595 MEL I TARY MIL-STD-105 MIL-STD-193 MIL-STD-4 6 1 MIL-STD-462 MIL-STD-810 MIL-STD-1474 - Colors. - Sampling Procedures and Tables for - Painting Procedures Tactical Vehicles - Electromagnettc Interference Inspection by Attributes. (Tracked and Wheeled). Characteristics, Requirements
8、 for Equipment, Subsystem and System. characteristics, Measurement of. - Electromagnetic Interference - Environmental Test Methods. - Noise Limits for Army Materiel. 2.1.2 Other Government documents, drawings, and piiblications. The following documents, drawings, and publications form a part of this
9、 specification to the extent specified herein. DRAWINGS ARMY 8736758 11655710 12270442 OTHER PUBLICATIONS 2-2-614 - Tank, Combat, Full-Tracked: 105MM Gun, - Conversion Kits M48A1 to M48A5 (M48A3El). - Balancing Procedure for Main Gun M485A5. Combination System M48A5. - USA TECOM Material Test Proced
10、ure. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-62222 23 77977Ob 0203773 2 I L 2.1.3 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein, the text of this specification s
11、hall take precedence. (Copies of specifications, standards, handbooks, drawings, and publications required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting officer.) 3. REQUIREMENTS 3.1 First article
12、. When specified (see 6.2), the contractor shall furnish vehicles which shall be subjected to first article inspection (see 4.4.1 and 6.2). First article inspection samples, properly marked with identifying information shall be representative of the unit to be furnished to the Government. All subseq
13、uent vehicles delivered to the Government shall conform to these samples in all of their pertinent physical and performance attributes. 3.2 Materials. Materials shall be as specified herein and in referenced specifications, standards, and drawings. Material shall be free from defects which adversely
14、 affect performance or serviceability of the finished product (see 4.6.1 and 6.6). 3.2.1 Ozone resistance. When rubber components are required to be ozone resistant, the degree of resistance shall be as specified in applicable specifications or drawings (see 4.6.1). 3.3 Design and construction. Vehi
15、cles, components, subassemblies and assemblies shall be manufactured and assembled into a complete vehicle in accordance with Drawing 11655710 and applicable specifications and documents. Vehicles shall meet all requirements specified herein and be of a quality that assures a vehicle free from defec
16、ts that would compromise, limit, or reduce its performance (see 4.6.1). 3.3.1 Qualified products. The contractor shall be responsible for using parts and assemblies from Qualified Products Lists (QPLs) whenever available. Contractors inspection records shall specifically list all QPL items by number
17、 and date of the QPL, name of supplier and part or drawing number(s). When parts and assemblies are approved as qualified products, but not yet listed on the QPL, the contractor shall list the products by number and date of the approved document and name of supplier(s) (see 4.6.1). 3.3.2 Break-in ru
18、n. The vehicle shall subjected-to a break-in run. The break-in run will include preliminary checks of suspension, controls, power pack, and provide wear-in for final adjustments. Prior to the break-in run will involve the following activities and conditions (see 4.6.1): e 3 Provided by IHSNot for Re
19、saleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-b2222 23 m 777790b 0203774 4 m a. Preparation. Prior to the break-in run, except for equipment and component installations and servicing performed by the contractor as a final processing of the vehicle for acceptance, the
20、 vehicle shall be completely assembled and all adjustments completed. The vehicle, including all applicable components requiring lubrication, shall be lubricated in accordance with production lubrication chart. shall be serviced with fuel conforming to applicable seasonal grades of VV-F-800. seasona
21、l grade of MIL-L-2104 may be used. applications by grades or types for various expected seasonal temperature ranges shall be specified. Fuel and water separator and the primary fuel filter shall be bled of air by removing each respective bleed plug and operating the in-tank fuel pumpa After air is b
22、led, replace the bleed plugs. The vehicle Engine oil conforming to the applicable Specific b, O11 pressure and temperature. Prior to the start of the break-in run, the engine shall be operated at 800 to 1200 revolutions per minuie (rpm) until lubricating oil is at operating pressure and temperature.
23、 break-in run the engine has been stopped for at least 30 minutes, the engine shall again be operated, as above, before continuing break-in run. Proper oil pressure and temperature shall be maintained during operation on level ground, 60 percent grades and 30 percent side slopes. If at any time duri
24、ng 3,3*2.1 Operation and distance. Each vehicle shall be given a break-in run for the distances specified in table I on smooth, level, hard-surfaced roads. (see figure 1) during “a“ and “b“ dlvisions of the break-in run in both directions (see 4.6.1). The vehicle shall be operated over the undulatin
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILT622221985TANKCOMBATFULLTRACKED105MMGUNM48A5M48A5 105 MM 履带 坦克 PDF

链接地址:http://www.mydoc123.com/p-448847.html