ARMY MIL-F-70620 A-1987 FUZE MTSQ M722 LOADING ASSEMBLING AND PACKING《M722引信 MTSQ的装载 装配及包装》.pdf
《ARMY MIL-F-70620 A-1987 FUZE MTSQ M722 LOADING ASSEMBLING AND PACKING《M722引信 MTSQ的装载 装配及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-F-70620 A-1987 FUZE MTSQ M722 LOADING ASSEMBLING AND PACKING《M722引信 MTSQ的装载 装配及包装》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、5-37-27 NIL-F-70620A 13 W 7797906 0356179 3 M MIL-F-70620A (AR) 14 July 1987 SUPERSEDING MIL-F-70620 29 September 1986 MILITARY SPECIFICATION FUZE, MTSQ, M772 LOADING, ASSEMBLING AND PACKING This Specification is approved for use within the U.S. Army Armament Munitions and Chemical Command, and is a
2、vailable for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the requirements and quality assurance provisions for the loading, assembling and packing of the M772 Mechanical Time Super Quick Fuze. 2, APPLICABLE DOCUMENTS 2.1 Government
3、documents. 2.1.1 Specifications and standards. The following specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specification
4、s and Standards (DoDISS) and supplement thereto, cited in the solicitation. SPECIFICATIONS MILITARY MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Spec if icat ion for STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attributes Beneficial co
5、mments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, U.S. Army Armament Munitions and Chemical Command, Attn. AMSMC-QA, Picatinny Arsenal, New Jersey 07806-5000 by using the self-addressed Standardize-
6、 tion Document Improvement Proposal (DD Form 1426) appearing et the end of this document or by letter. - I -3 THIS DOCUMENT CONTAINS /y PAGES. - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-70b20A 13 7777706 0356200 b m MIL-F-7 O 6 2 OA (AR)
7、 MIL-STD-331 - Fuze and Fuze Components, Environmental and MIL-STD-414 - Sampling Procedures and Tables for Perf ormance Test for Inspection by Variables for Percent Be f ec t ive 2.1.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and pu
8、blications form a part of this Specification to the extent specified herein. .Unless otherwise specified, the issues shall be those in effect on the date of the solicitation. DMWINGS US ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER ( ARDEC) PRODUCT DRAWINGS 12624567 - Fuze, MTSQ, M772 (
9、Copies of specifications, standards, drawings, and publications required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting officer.) 2.2 Order of precedence. In the event of a conflict between the tex
10、t of this specification and the references cited herein, (except for associated detail specifications, specification sheets or MS standards), the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws and regulations unless a specifi
11、c exemption has been obtained. 3. REQUIREMENTS 3.1 Material. Materials and parts shall be in accordance with applicable drawings and specifications. 3.2 Fuze assembly. The M772 MTSQ fuze assemblies shall comply with all requirements specified on drawing (dwg.) 12624567 and with all requirements spec
12、ified in applicable specifications. with the requirements of MIL-STD-331, Test 119, Procedure 2, and of 3.7.1, 3.7.3 and 3.7.6. 3.3 Transportation vibration. The fuze assembly shall comply 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1 MIL-F-706
13、20A 13 W 9797906 0356201 8 W MIL-F-7062 OA (AR) 3.4 Jolt and jumble. The fuze assembly shall comply with the 3.5 Drop test, 1.5 meter. The fuze assembly shall comply with requirements of MIL-STD-331, Test 101.2, Procedure 2 and Test 102.1. the requirements of MIL-STD-331, Test 111.1. 3.6 Waterproofn
14、ess. The fuze assembly shall comply with the MIL-STD-331Ar Test 108, except that the duration of immersion shall be five (5) minutes and pressure shall be three (3) psi gauge (6896 Pa) . 3.7 Ballistic perfocmance (provinq ground) . 3.7.1 Premature bursts. There shall be no premature bursts or metal
15、parts failure in the mortar or in the first 100 meters of flight . 3.7.2 Arminq safety. The fuze shall not function on impact against a 1“ (25.4mm) plywood screen positioned at a distance of 40 meters + 1 meter. - 3.7.3 Mechanical time functioninq (700F). The fuze, when set in the time mode, shall c
16、ause the projectile to function within the following upper (UL) and lower (LL) time limits. Set Time (Sec) 16.5 28.0 44.0 Function Time Limits (Sec) LL = 15.88 UL = 17.12 LL = 27.16 UL = 28.84 LL = 43.00 UL = 45.00 3.7.4 Extreme temperatures mechanical time functioning. The fuze, when set in the tim
17、e mode, and conditioned at -500F or t145OF, shall cause the projectile to function within the following time limits. Set Time (Sec) Function Time Limits (Sec) 28.0 LL = 27.00 UL = 29.00 3.7.5 Off time. The fuze when set in the time mode, at any temperature condition, shall function within the follow
18、ing off time limits: Set Time (Sec) Early Off Time (Sec) Late Off Time (Sec) 16.5 28.0 44.0 15.00 or less 26.25 or less 42.00 or less 18.00 or more 29.75 or more 46.00 or more 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ MIL-F-70620A 13 W 7777
19、70b 035620Z T MIL-F-7062OA (AR) 3.7.6 Fuze failures. When a fuze is set to function in the air and functions upon impact, it shall be considered a ground impact. When it fails to function on impact, it shall be considered a dud. 3.8 First article. When specified in the contract or purchase order, a
20、sample shall be subjected to first artice inspection in accordance with the technical provisions herein. (see 4.3 and 6.2) 3.9 Workmanship. All parts and assemblies shall be fabricated in a thorough, workmanlike manner. They shall be free of burrs, sharp edges, cracks, dirt, rust and other foreign m
21、atter. The cleaning methods shall not be injurious to any part, nor shall the parts be contaminated by the cleaning agent. Exterior surface coatings shall be uniform and continuous except for a few light scratches not exposing base material. All required markings shall be neat and sharply defined. 4
22、. QUALITY ASSURANCE PROVISIONS *4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or purchase order, the
23、contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed
24、necessary to assure supplies and services conform to prescribed. requirements. Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail spec if icat ion. 4.1.L Responsibility for compliance. All items must meet all requ
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILF70620A1987FUZEMTSQM722LOADINGASSEMBLINGANDPACKINGM722 引信 MTSQ 装载 装配 包装 PDF

链接地址:http://www.mydoc123.com/p-444859.html