ARMY MIL-D-46404-1960 DETONATOR STAB M13 LOADING ASSEMBLING AND PACKING《M13型针刺雷管的装载 组装和包装》.pdf
《ARMY MIL-D-46404-1960 DETONATOR STAB M13 LOADING ASSEMBLING AND PACKING《M13型针刺雷管的装载 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-D-46404-1960 DETONATOR STAB M13 LOADING ASSEMBLING AND PACKING《M13型针刺雷管的装载 组装和包装》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、1, SCOPE 1.1 This specification covers the loading, assembling, and packing for one type of stab detonator designated as Detonator, bu3 0 2, BPPLICABLE WCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids form a part of this specification to the extent specified
2、 herein, SPECIFI; CATIONS MILITARY MIL-G-2550 - General Spec5fication for Ammuition Except Small. Arms inmunition. STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection MIL-STD-109 - Inspection Terms and Definitions. by Attributes. DRAWINGS ORDNANCE CORPS 7548102 - Box, Pack
3、ing, Ammunition for Detonator8 7548103 - Box-, Set-up, Packing, Ammunition, Outer, for BoosGers, Detonators and Primera. Assembly, Details, Packing and Marking. 7548104 - Box, Set-up, Packing, Ammunition, Inner, for Boosters, Detonators and Primerig, Assembly, Details, Packing and Mwking, 8797744 -
4、Detonator, MJ.3, Loading AsrJembly, -. o Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-46404 13 = 7777706 03LL754 O PUBLICATIONS ORDNANCE CORPS 0-608-11 - Procedures and Tables for Continuous Sampling IEL-6119351 - Index of Inspection Equipme
5、nt Lists. (Copies of specifications, standards, drawings and publications re- quired by contractors in connection with specific procurement fnctions should be obtained from the procuring activity or as di- rected by the contracting officer). 2.2 Other irublications.=The following document frms a par
6、t of this specification to the extent specified herein. Unless other- wise indicated, the issue in effect on date of invitation for bids shall apply. by Attributes. CODE: OF FEDERAL REGULATIONS. 49 CFR 71-78 - Interstate Commerce Commission Rules and Regulations for the Transportation of Ex- plosive
7、s and Other Dangerous Articles. (“he Interstate Commerce Commission Regulations are now a part of the Code of Federal Regulations (1949 Edition and revisions) avail- able from the Superintendent of Documents, Government Printing Office., Washington 25, D.C. cite “49 CFR 71-78 (latest revision)“.) Or
8、ders for the above publication should 3. EBQUIREMENTS 3.1 Material.-Materials shall be in accordance with applicable 3.2 Detonators.-The detonators shall comply with all require- 8787744, and wi$h all require- 3.3 Moisture content of bad aride.-The moisture content of Wawings and specifications. ine
9、nts specified on Drawing (dug.) ments specified in applicable specifications. the lead azide used in loading the detonators shall not exceed 0.50 percent when tested as specified in 4.3.2. 2 . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-464
10、04 (Ord ) 3.4 Moisture content of.primer mixture,-The moisture content of the primer mixture used in loading the detonators shall not exceed 0,30 percent when tested as specified in 4.3.3. 3.5 Functioning, 3.5.1 Sensitivity.-The detonators shall function on the first attempt and shall cause perforat
11、ion of the lead disc to a diameter o.f not less than i/ryl from not more than one lot. 4.2.2 Exawination.-Sampling plans and procedures for the fol- lowing classifications of defects shall be in accordance with Standard MIL-STD-lO5 except %ha$ inspection for critical defects, when listed, shall be 1
12、00 percent. Continuons sanplig plans in accordance with Handbook OaD4608-11 may be used if approved by the procuring activity. Also, at the option of the procuring activity, AW*a and sampling plans may be applied to the individual characteristics listed using an AQL of O,Z!j percent for each major d
13、efect and an ACn accordance with Standard MIL-STD-105 using code letter P and an AQL of 0.15 percent. The sample dekonators shall be tested as specified in 4.3.5.1, using test equipment specified in 4.2.4. Rejection shall be in accordance with Standard MIL-STD-105. of 25 detonators shall be selected
14、 from each lot and subjected to the test specified in 4.3.5.2, using test equipment specified in 4.2*4. If one or more detonators fail to function satisfactorily, as evidenced by performing the test specified in 4.3.5.1, the lot shall be rejected, Inspection equipment.-For the performance of the exa
15、mi- nations and tests specified in 4.2.2 and 4.2.3, when applicable, the contractor shall have available, and utilize correctly, all necessary gages, measuring and testing equipment identified by Index of Inspection Lists No. 611.9351, or approved equivalents there- to. (See 4*1.1) When inspecting t
16、he contractors inspection equip- ment, the Government inspector will determine that the contractor has available, and utilizes correctly, gages, measuring and testing equipment of the required accuracy and precision and that, the instru- ments are of the proper type and range to make measurements of
17、 the requixd accuracy. The contractor will have available a set of master gages, standards and appropriate instruments for regularly scheduled calibration of his inspection equipment, Records of such regularly scheduled calibration will and made available for review by the Government. The calibratio
18、n of gages, standards and instruments will be periodically checked by authorized Government personnel. accurately weighed portion of 5 grams shall be transferred to a tared, medium porosity, sintered glass filtering crucible. The sample shall be extracted with four 10 milliliter (mi.) portions of ac
19、etone maintaining each portion in contact with the residue for approximately 5 minutes.before applying suction. Any lumps which may persist shall be broken up and the sides of the crucible washed down w5th each 10 ml. portion of acetone to insure complete removal of the tetryl. The residue shall be
20、aspirated until the odor of acetone is no longer detectable. The crucible and contents shall be placed in a drying oven at 100 degrees Centigrade (OC.) to 150c. for 1/2 hour, coo1ed.i.n a desiccator and weighed. The 4.2.3.4.2 Waterproofness (see 3.5.2) - Ma.ior defect.-A sample 4.2.4 be maintained b
21、y the contractor 4.3 Test methods and procedures. 4.3.1 Determination of binder-lubricant content of tetryl.-An 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-46404 (Ord) above extraction shall be repeated, drying and weighing with individ-
22、ual 10 ml. portions of acetone until the loss in weight on subsequent extractions totals less than 0.005 gram. The weight of residue in the crucible shall be calculated as the percentage of total binder-lubricant. dried aluminum dish 2 inches in diameter shall be covered with a sheet of polytetraflu
23、oroethylene 2 1/2 inches square and sufficiently flat to form a tight cover. approximately two grams of the sample shall be transferred to the moisture dish and the dish and contents shall be %ransferred to an oven and dried at 95O. 2 2OC, for 2 hours, placed in a sulfuric acid desiccator .ring the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILD464041960DETONATORSTABM13LOADINGASSEMBLINGANDPACKINGM13 针刺 雷管 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-442420.html