1、AMERICAN NATIONAL STANDARDS ACCREDITED STANDARDS COMMITTEE ASC A92 AERIAL WORK PLATFORMS INTERPRETATIONS 1986 - 2013 400 Admiral Boulevard Kansas City, MO 64106 Phone: 816-595-4860, Fax: 816-472-7765 www.saiaonline.org 2013 Scaffold (2) the dielectric characteristics of oil and insulating hose; (3)
2、the ability to control the various functions to position the platform; (4) the resistance to bursting of critical components under pressure; and (5) the provision for the lower controls to override the upper controls. Question 1. It is my understanding that the meaning of the work line is hose, tubi
3、ng, or any other conduit for hydraulic fluid. In other words, this requirement for appropriate devices to be present within the hydraulic system to prevent unrestricted motion of the aerial device is intended to address the possible failure of specific hydraulic system components. An alternative int
4、erpretation, which I believe is incorrect, has been offered that suggests that the word line is intended to have a more comprehensive meaning, namely, that it means the entire hydraulic system. This interpretation would require that appropriate devices be installed to guard against the failure of an
5、y and all components that comprise the entire hydraulic system(4.8 System Protection. Where the operation of the aerial device is accomplished by hydraulic means, the system shall be equipped with appropriate devices to prevent motion of the platform(s) or material lifting device, or both in the eve
6、nt of hydraulic line failure.) 2013 Scaffold the outriggers extended but not used to level the lift? Does the second paragraph simply provide detailed instructions to be used in order to properly conduct the test? 3. Are the first and second paragraphs under 4.5.2 indicating two separate tests, i.e.
7、 one test on a 5 degree slope where the outriggers cannot be used and a second test on a 5 degree slope where the outriggers can be used? 4. Does paragraph 4.5.2, stability, require the vehicle to rotate 360 degrees at all angles of elevation, if capable, while on a 5 degree side slope? Specifically
8、 does the standard require the vehicle to be capable of lifting the test load towards the downward slope in the direction most likely to cause overturning? 5. If we restrict lifting to the high side of the vehicle, can we consider that to be within the definition of the specific configuration? 6. Ca
9、n we restrict the use of the vehicle to level ground only and would that be considered within the definition of the specific configuration? 7. Does this require the load to be lifted in the direction of the downward slope, the direction that is most likely to cause overturning? (4.5.2 Stability on S
10、lopes. Each aerial device, when mounted on a vehicle meeting the manufacturers minimum vehicle specifications without readily removable tools and material and used in a specific configuration, shall comprise a mobile unit capable of sustaining a static load one and on-third times its rated load capa
11、city in every position in which the load can be placed within the definition of the specific configuration when the vehicle is on a slope of 5 degrees downward in the direction most likely to cause overturning.The load shall be applied at one and one-third times the platform(s) rated load at the cen
12、ter of the platform, simultaneously with one and one-third times the lifting device rated load at the point of load application in its position of maximum overturning moment when so equipped. If having the outriggers extended to a firm footing is part of the 2013 Scaffold we quote aerial devices wit
13、h (emphasis added) a chassis insulating system We note that the drawing attached to the email communication was a facsimile of Figure 3A in the A92.2-1990 standard (and similarly in A92.2-2001) that is an optional test configuration for Category C aerial devices. We assume this illustration was for
14、purposed of explanation of what the questioner was calling the Up and Down boom. It should be noted that Figure 3 and Figure 3A either can be used for testing of the upper boom of the aerial device and Figure 4 is illustrative of the test positions for testing of units with the chassis insulating sy
15、stems that are in most cases a part of the lower boom. Question 1. I am concerned with the visual and/or audible safety warning devices which would tell an operator/user that one of the outriggers had been taken up and would preclude the hydraulic/electrical system from allowing the boom to be lifte
16、d into the air. I believe this type of system can either be accomplished through a hydraulic bypass, flashing lights or an audible sounding system device that would either preclude movement or warn of unstable condition. (6.3.1.2 Frequent Inspection and Test. Items such as, but not limited to, the f
17、ollowing shall be inspected for defects at intervals as defined in 6.3.1.1(2)(a) or as specifically indicated, including observation during operation, for any defects which might appear between regular inspections. These tests and inspections may be performed by the operator; any suspected items sha
18、ll be carefully examined and determination made by a qualified person as to whether they constitute a safety hazard. All unsafe items shall be corrected before further use. (3) Visual and audible safety devices for malfunction.) Response 1. Paragraph 6.3.1.2(3) which you referenced in a part of the
19、maintenance section. Its purpose is to remind maintenance forces that audible alarms and shutdown devices can and do fail, and as such, must be checked on an ongoing, scheduled basis. 2013 Scaffold will this satisfy the ANSI A92.2 requirements stated above? In other words, can the operator for the n
20、ext day begin to use the aerial device based on the prior days end of day inspection, assuming the aerial device was not used between those two times? Response 1. Section 8.2.3 of the ANSI A92.2-2001 concerning frequent inspection and test of aerial devices does not address the time of day an inspec
21、tion prior to use is made. The Standard is not interested in the time when the inspection is made, only in the intervals between inspections. The following is excerpted for that section: “once daily prior to use.” Since “prior” is not prefaced with the word “just”, no time constraint seems intended.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSISAIAA92INTERPRETATIONS2013ASCA92CAERIALWORKPLATFORMSINTERPRETATIONS19862013PDF

链接地址:http://www.mydoc123.com/p-437902.html