ANSI NEIS 410-2013 Standard for Installing and Maintaining Liquid-Filled Transformers.pdf
《ANSI NEIS 410-2013 Standard for Installing and Maintaining Liquid-Filled Transformers.pdf》由会员分享,可在线阅读,更多相关《ANSI NEIS 410-2013 Standard for Installing and Maintaining Liquid-Filled Transformers.pdf(50页珍藏版)》请在麦多课文档分享上搜索。
1、AN AMERICAN NATIONAL STANDARDNECA 410-2013 Standard forInstalling and Maintaining Liquid-Filled TransformersPublished byNational Electrical Contractors AssociationTMStandard forInstalling and MaintainingLiquid-Filled TransformersNECA 410-2013An AmericanNational StandardPublished byNational Electrica
2、l Contractors AssociationNOTICE OF COPYRIGHTThis document is copyrighted by NECAReproduction of these documents either in hard copy or soft (including posting on the web) is prohibited without copyright permission. For copyright permission to reproduce portions of this document, please contact NECA
3、Standards transformer weights often exceed the capacity of forklifts, and transformer termination compartments and radiator fins are easily damaged. g) Use the manufacturer recommended points for lifting, jacking, and/or pulling transformers. Do not lift or drag by placing a loop or sling around tra
4、nsformers. Do not use radiator fins for lifting or jacking. Use all lifting lugs when lifting transformers. Lifting lugs or ears are designed for vertical strain only.h) Use jacking plates at the corners of the tank base plate to jack transformers. Transformers should be jacked evenly on all four co
5、rners to prevent warping or tipping over. Do not place jacks under radiator fins, termination compartments, drain valves, pipe connections, or other attachments.5 nStandard for Installing and Maintaining Liquid-Filled Transformers NECA 410i) Exercise care not to damage the tank base structure when h
6、andling transformers using skids or rollers. Use skids to distribute stresses over the tank base when using rollers under large transformers.3.3 Storage a) Store transformers in accordance with manufacturer recommendations.b) Transformers may be stored outdoors. If possible, store transformers at fi
7、nal installation locations on concrete pads. If dry concrete surfaces are not available, use pallets of adequate strength to protect transformers from direct contact with the ground. Ensure transformer is level.c) Ensure that the transformer storage location is clean and protected from severe condit
8、ions. Protect transformers from dirt, water, contamination, and physical damage. Do not store transformers in the presence of corrosive or explosive gases. Protect transformers from weather when stored for more than 3 months.d) Store transformers with compartment doors closed.e) Regularly inspect tr
9、ansformers while in storage and maintain documentation of storage conditions, noting any discrepancies or adverse conditions. Verify that an effective pressure seal is maintained using pressure gauges or the pressure relief valve. Visually check for insulating liquid leaks and rust spots.3.4 Pre-Ins
10、tallation Checks a) Complete the following checks at the end of the storage period. Contact the manufacturer for acceptable results and for recommendations for deficient test results.b) Draw liquid samples and test characteristics, such as dielectric strength, power factor, and water content, in acc
11、ordance with Section 10.2.c) Test insulation resistance and insulation power factor and compare to factory test data in accordance with Section 9.3 and 9.8.d) Consult the manufacturer for recommendations for deficient test results.n 61. Scope4.1 General Installation Requirements a) Observe safety pr
12、ocedures in accordance with 7.1. Verify that there is no voltage on the incoming cables.b) Locate and coordinate transformer installations in accordance with manufacturer instructions and specific transformer markings.c) Consult the manufacturer for high altitude applications. At altitudes above 100
13、,650 m (3300 ft), decreased air density reduces transformer cooling efficiency.d) Coordinate installation of raceways and conductors at locations designated by the transformer manufacturer.e) Follow applicable national codes and any applicable local codes or ordinances when locating transformers in
14、close proximity to public thoroughfares or buildings, considering that transformer insulating liquid may be flammable.f) Do not install transformers near heat-generating equipment or heat-sensitive equipment.g) Avoid opening transformer termination compartments during inclement weather conditions, u
15、nless the opening is completely protected from weather.h) Verify that site drainage is adequate to prevent groundwater from entering transformers.i) Install bollards, fences, barriers, etc., as required to protect transformers and transformer accessories from physical damage and vehicular traffic, i
16、f applicable.4.2 Transformer Pad and Mounting a) Installing transformer pads may require the evaluation of soil characteristics, concrete and reinforcement, and structural characteristics. Clay soils are compressive and may require stabilizing backfill to prevent transformers from settling. Consult
17、qualified personnel regarding soil characteristics, concrete and reinforcement, and structural requirements for transformers.b) Install flat, level concrete pads in accordance with contract drawings and specifications prior to setting transformers in place. Install transformers level and plumb. When
18、 no drawings or specifications are available, consult transformer manufacturer for recommendations. Ensure that pad surfaces are flat. Prevent transformers from tilting more than 1-1/2 degrees in any direction while energized to ensure that energized parts remain submerged in insulating liquid. Inst
19、all shims under frames or bases to level transformers, if necessary.c) When installed, footings for transformer pads should be below the frost line to prevent settling and heaving in areas where the ground is subject to freeze and thaw.d) Coordinate conduit locations with concrete pad construction f
20、or underground entry into conductor termination compartments of transformers.e) Install vibration isolators or neoprene pads between the transformer enclosure and the concrete pad in accordance with manufacturer recommendations, where required.f) Use anchors and bolts suitable for the conditions of
21、installation to anchor transformers to concrete pads. Hold-down cleats or brackets, when supplied, should be used to bolt transformers securely to 4. Installation7 nStandard for Installing and Maintaining Liquid-Filled Transformers NECA 410concrete pads. Transformers have a relatively high center of
22、 gravity. Consult qualified personnel regarding seismic restraint of transformers. g) Ensure that interfaces between concrete pads and transformers, including termination compartments, are sealed to prevent foreign objects, rodents, or vermin from entering termination compartments. To preserve trans
23、former tamper-resistance, there must be no gaps between the transformer and the pad.4.3 Grounding and Bonding a) Transformer grounding is necessary to dissipate static charge and to provide a low-impedance path to ground for fault current in the event that the transformer windings inadvertently cont
24、act the transformer core or enclosure.b) Connect transformer and related accessories and components to ground in accordance with manufacturer recommendations and in accordance with the National Electrical Code.c) Bond exposed non-current-carrying metal parts of transformer installations, including f
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSINEIS4102013STANDARDFORINSTALLINGANDMAINTAININGLIQUIDFILLEDTRANSFORMERSPDF

链接地址:http://www.mydoc123.com/p-437455.html