ANSI ASTM F2647-2007 Standard Guide for Approved Methods of Installing a CVS (Central Vacuum System)《中央真空系统(CVS)安装的认可方法用指南》.pdf
《ANSI ASTM F2647-2007 Standard Guide for Approved Methods of Installing a CVS (Central Vacuum System)《中央真空系统(CVS)安装的认可方法用指南》.pdf》由会员分享,可在线阅读,更多相关《ANSI ASTM F2647-2007 Standard Guide for Approved Methods of Installing a CVS (Central Vacuum System)《中央真空系统(CVS)安装的认可方法用指南》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F2647 07 (Reapproved 2016) An American National StandardStandard Guide forApproved Methods of Installing a CVS (Central VacuumSystem)1This standard is issued under the fixed designation F2647; the number immediately following the designation indicates the year oforiginal adoption or, in
2、 the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide demonstrates proper methods for installing acentral-vacuum system.1.2 Ap
3、pendix X1 contains additional sources of informationthat may be helpful to the user of this guide.1.3 The values stated in inch-pound units are to be regardedas the standard. The values given in parentheses are forinformation only.1.4 This standard does not purport to address all of thesafety concer
4、ns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2E814 Test Method for Fire Tests of Penetr
5、ation FirestopSystemsE2174 Practice for On-Site Inspection of Installed FirestopsF402 Practice for Safe Handling of Solvent Cements,Primers, and Cleaners Used for Joining ThermoplasticPipe and FittingsF412 Terminology Relating to Plastic Piping SystemsF2158 Specification for Residential Central-Vacu
6、um Tubeand Fittings3. Terminology3.1 Definitions:3.2 For definitions of terms used in this guide, see Termi-nology F412.4. Significance and Use4.1 The suggestions of this guide are intended to provideproper installation materials and practices to be used during theinstallation of a central-vacuum sy
7、stem.5. Materials5.1 Plastic MaterialsFor information on plastic materialsused for installing a CVS system, see Specification F2158.1This guide is under the jurisdiction of ASTM Committee F11 on VacuumCleaners and is the direct responsibility of Subcommittee F11.30 on Durability-Reliability.Current
8、edition approved Oct. 1, 2016. Published October 2016. Originallyapproved in 2007. Last previous edition approved in 2013 as F2647 07 (2013).DOI: 10.1520/F2647-07R16.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual B
9、ook of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States1APPENDIXES(Nonmandatory Information)X1. STORAGEX1.1 Outside StoragePlastic tube s
10、hould be stored on aflat surface or supported in a manner that will prevent saggingor bending. Do not store tube in direct sunlight for longperiods. To prevent damage, tubing and fittings should not bestored where the temperature exceeds 130F (54C).X1.2 Inventories of plastic tube should be used on
11、a first-in,first-out basis.X2. JOINTS AND CONNECTIONSX2.1 PVC tubing and fittings shall be joined by the solvent-cement method.X2.2 Metal tubing and fittings shall be joined according toAppendix X4.X3. SOLVENT CEMENT JOINTSX3.1 Tube CuttingCut the tube square with the axis, usinga fine-tooth handsaw
12、 and a miter box. A rotary cutter may beused if the cutting blades are specifically designed for cuttingplastic tube in such a way as not to raise a burr or ridge (flare)at the cut end (see Fig. X3.1). Remove all burrs with adeburring tool, knife, file, or abrasive paper.X3.2 Dry Fit TestThe solvent
13、 cement joint is designed sothat there will generally be interference of the tube wall withthe fitting socket before the tube is fully inserted. Insert thetube into the fitting and check that the interference occurs about13 to23 of the socket depth (Fig. X3.2).X3.3 CleaningSurfaces to be joined must
14、 be cleaned andbe free of dirt, moisture, oil, and other foreign material. If thiscannot be accomplished by wiping with a clean, dry cloth, achemical or mechanical cleaner must be used. If a chemicalcleaner is used, apply with an applicator. (WarningSkincontact with chemical cleaners should be avoid
15、ed.)X3.4 Application Procedure:X3.4.1 Handling CementKeep the cement can closed andin a shady place when not actually in use. Discard the cementwhen an appreciable change in viscosity takes place or at thefirst sign of gelation. The cement should not be thinned. Keepthe applicator immersed in cement
16、 between applications. (SeePractice F402 for proper handling procedures.)X3.4.2 Application of CementPVC solvent cement is fastdrying, and, therefore, the cement shall be applied as quickly aspossible, consistent with good workmanship (see Fig. X3.3).The surface temperature of the mating surfaces sh
17、ould notexceed 110F (43C) at the time of assembly.X3.4.3 Apply cement lightly but uniformly to the outside ofthe tubing, taking care to keep the use of cement to a minimum.(WarningApplication of cement to fitting socket is notrecommended and can cause drippings or an excess amount ofFIG. X3.1 Appara
18、tus for Cutting TubeFIG. X3.2 Tube Entering Dry FittingF2647 07 (2016)2cement to be pushed to the inside diameter of the connectionthat can possibly snag debris and eventually create a clog.)X3.4.4 Low-Temperature ApplicationsAt temperaturesbelow freezing, 32F (0C), solvents penetrate and soften the
19、PVC surfaces more slowly than in warmer weather. For thisreason, it is recommended that testing be done on a piece ofscrap tube to determine if satisfactory penetration of thesurfaces can be achieved.X3.4.5 Assembly of JointImmediately after applying acoat of cement to the tube, forcibly insert the
20、tube into thesocket. To distribute the cement evenly, turn the tube or fittinga14 turn during the process (see Fig. X3.4).X3.4.6 Assembly should be completed within 20 s after theapplication of cement. (WarningUntil the cement is set inthe joint, the tube may back out of the fitting socket, if not h
21、eldin place for approximately 1 min after assembly. Care shouldbe taken during assembly not to disturb or apply any force tothe joints previously made, as early rough handling can destroyfresh joints.)X4. METHODS OF JOINING METAL TUBING AND FITTINGSX4.1 Tube CuttingCut the tube square with the axis,
22、 usinga metal cutting blade in a chop saw or band saw.Arotary cuttermay be used if the cutting blades are specifically designed forcutting metal tube in such a way as not to raise a burr or ridge(flare) at the cut end. Remove all burrs with a deburring tool,file or abrasive paper.X4.2 CleaningSurfac
23、es to be joined must be cleaned andfree of dirt, moisture, oil and other foreign material. If thiscannot be accomplished by wiping with a clean, dry cloth, achemical or mechanical cleaner must be used. If a chemicalcleaner is used, apply with an applicator. (WarningSkincontact with chemical cleaners
24、 should be avoided.)X4.3 Assembly of JointThere are three popular and rec-ommended methods of joining metal tubing and fittings for usein low vacuum and pressure systems under 16 psig (Adhesive,Compression Couplings and Shrink Sleeves). All of thesemethods provide secure connections eliminating the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIASTMF26472007STANDARDGUIDEFORAPPROVEDMETHODSOFINSTALLINGACVSCENTRALVACUUMSYSTEM 中央 真空 系统 CVS 安装 认可

链接地址:http://www.mydoc123.com/p-433152.html