ANSI ASME OM CODE INTERPRETATIONS-2012 Interpretations to OM CODE Code for Operation and Maintenance of Nuclear Power Plants (Includes Interpretations Dated September 1 1995 thru A.pdf
《ANSI ASME OM CODE INTERPRETATIONS-2012 Interpretations to OM CODE Code for Operation and Maintenance of Nuclear Power Plants (Includes Interpretations Dated September 1 1995 thru A.pdf》由会员分享,可在线阅读,更多相关《ANSI ASME OM CODE INTERPRETATIONS-2012 Interpretations to OM CODE Code for Operation and Maintenance of Nuclear Power Plants (Includes Interpretations Dated September 1 1995 thru A.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、ASME OM INTERPRETATIONSASME OM INTERPRETATIONS(FOR DIVISION 1)Replies to Technical InquiriesJune 7, 2011 Through April 18, 2012FOREWORDThis publication includes all of the written replies issued between the indicated dates bythe Secretary, speaking for the ASME Committee on Operation and Maintenance
2、, to inquiriesconcerning interpretations of technical aspects of ASME OM Code.These replies are taken verbatim from the original letters, except for a few typographicalcorrections and some minor editorial corrections made for the purpose of improved clarity.These interpretations were prepared in acc
3、ordance with the accredited ASME procedures.ASME procedures provide for reconsideration of these interpretations when or if additionalinformation is available which the inquirer believes might affect the interpretation. Further,persons aggrieved by this interpretation may appeal to the cognizant ASM
4、E Committee orSubcommittee. ASME does not “approve,” “certify,” “rate,” or “endorse” any item, construction,proprietary device, or activity.An interpretation applies to the edition or addenda stated in the interpretation itself, or, ifnone is stated, to the latest published edition and addenda at th
5、e time it is issued. Subsequentrevisions to the rules may have superseded the reply.For detailed instructions on the preparation of technical inquiries, refer to Preparation ofTechnical Inquiries to the Committee on Operation and Maintenance of Nuclear Power Plants(p. v of ASME OM-2012).I-1INTENTION
6、ALLY LEFT BLANKI-2ASME OM INTERPRETATIONSInterpretation: 12-01Subject: ISTC-4.1 (ISTC-3700) and ISTC-4.2.3 (ISTC-3530), Obtrurator PositionDate Issued: June 7, 2011File: OMI 11-913Question (1): If it is practicable, is it arequirement of ISTC-4.1 (ISTC-3700) that local observationof valve operation
7、be supplemented by other indications to verify obturator position?Reply (1): No.Question (2): If remote indicating lights provide confirmation of changes in obturator position,is it a requirement of ISTC-4.2.3 (ISTC-3530) to also observe other evidence, such as changes insystem pressure, flow rate,
8、level, or temperature, that reflects change of obturator position?Reply (2): No.lnterpretation: 12-02Subject: ISTA-9220(b), Coversheet RequirementDate Issued: November 7, 2011File: OMI 09-1312Question: Is it a requirement of ISTA-9220(b) to have a coversheet attached to every singledocumented test r
9、ecord?Reply (1): No.Interpretation: 12-03Subject: Mandatory Appendix I, I-1320(b)(2)Date Issued: December 22, 2011File: OMI 10-1096Question:WhenafullcomplementofreliefvalvesisreplacedusingtheprovisionsofI-1320(b)(2),does this satisfy the testing requirements of I-1320(a) with respect to the minimum
10、required testinterval of 20% within a 24-mo period?Reply: Yes.Interpretation: 12-04Subject: Mandatory Appendix I, Main Steam Relief ValveDate Issued: December 22, 2011File: OMI 10-1980Question: If a main steam relief valve is operated/controlled by a pilot valve and that pilotvalve, in addition to r
11、esponding to manual inputs that results in the opening of the MSRV,functions to automatically open the MSRV upon reaching the valves setpoint, can that pilot valvebe defined as an auxiliary actuating device?Reply: No.I-3ASME OM INTERPRETATIONSInterpretation: 12-05Subject: ISTC-5100, Valve Stroke Tes
12、t PerformanceDate Issued: April 18, 2012File: OMI 10-1094Question: Is it a requirement of the 1998 Edition and addenda, paras. ISTC-5115, ISTC-5123,ISTC-5133, ISTC-5143, and ISTC-5153, that a valve with abnormal or erratic operation observedduring valve stroke testing performed per paras. ISTC-5113(
13、a), ISTC-5121(a), ISTC-5131(a),ISTC-5141(a), and ISTC-5151(a) be declared inoperable if the measured value of stroke time iswithin limits and the obturator travels to the required position per ISTC-3521(a)?Reply: No.I-4ASME OM INTERPRETATIONSASME OM INTERPRETATIONS(FOR DIVISION 1)Replies to Technica
14、l InquiriesJune 20, 2007 Through July 25, 2008FOREWORDThis publication includes all of the written replies issued between the indicated dates bythe Secretary, speaking for the ASME Committee on Operation and Maintenance, to inquiriesconcerning interpretations of technical aspects of ASME OM Code.The
15、se replies are taken verbatim from the original letters, except for a few typographicalcorrections and some minor editorial corrections made for the purpose of improved clarity.These interpretations were prepared in accordance with the accredited ASME procedures.ASME procedures provide for reconside
16、ration of these interpretations when or if additionalinformation is available which the inquirer believes might affect the interpretation. Further,persons aggrieved by this interpretation may appeal to the cognizant ASME Committee orSubcommittee. ASME does not “approve,” “certify,” “rate,” or “endor
17、se” any item, construction,proprietary device, or activity.An interpretation applies to the edition or addenda stated in the interpretation itself, or, ifnone is stated, to the latest published edition and addenda at the time it is issued. Subsequentrevisions to the rules may have superseded the rep
18、ly.For detailed instructions on the preparation of technical inquiries, refer to Preparation ofTechnical Inquiries to the Committee on Operation and Maintenance of Nuclear Power Plants(p. v of ASME OM-2009).I-1INTENTIONALLY LEFT BLANKI-2ASME OM INTERPRETATIONSInterpretation: 09-01Subject: Subsection
19、 ISTD (ASME OM Code: 1998 Edition through 2005 Addenda)Date Issued: June 20, 2007File: OMI 07-118Question (1): Does Subsection ISTD allow for the substitution of a snubber being removed formaintenance activities not affecting the snubber, in place of a snubber randomly selected fortesting, if the sn
20、ubber is within the same DTPG?Reply (1): No; paras. ISTD-5311 and ISTD-5411 do not allow this type of substitution.Question(2):IfthesnubberbeingsubstitutedisNOTwithinthesameDTPG,butitssubstitutiondoes not make either DTPG fall below the minimum testing requirements (10% or 37 Plan)?Reply (2): No; pa
21、ras. ISTD-5311 and ISTD-5411 have specific sample selection criteria for eachDTPG and do not allow substitution of snubbers between different DTPGs.Question(3):IfthesnubberbeingsubstitutedisNOTwithinthesameDTPG,anditssubstitutionwould result in the DTPG falling below minimal testing requirements (10
22、% or 37 Plan)?Reply (3): No; paras. ISTD-5311 and ISTD-5411 have specific sample selection criteria for eachDTPG and do not allow substitution of snubbers between different DTPGs.lnterpretation: 09-02Subject: ASME Code Case OMN-1Date Issued: August 28, 2007File: OMI 07-501Question (1): Is it a requi
23、rement of Code Case OMN-1, subpara. 3.3(a), that a portion of thevalves in a group be tested more frequently?Reply (1): No.Question (2): Is it a requirement of Code Case OMN-1, subpara. 3.3(a), for MOVs that aretested early, the due dates would still be maintained on the original due dates, as long
24、as thevalve(s) tested at the original date have sufficient margin when inservice tested?Reply (2): No.Question (3): Is it a requirement of Code Case OMN-1, subpara. 3.3(a) and subparas. 3.5(a)and (b), that if sufficient margin does not exist, the entire MOV group would be required to betested at a m
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIASMEOMCODEINTERPRETATIONS2012INTERPRETATIONSTOOMCODECODEFOROPERATIONANDMAINTENANCEOFNUCLEARPOWERPLANTSINCLUDESINTERPRETATIONSDATEDSEPTEMBER11995THRUAPDF

链接地址:http://www.mydoc123.com/p-432020.html