AIR FORCE MIL-H-8890-1961 HYDRAULIC COMPONENTS TYPE III (-65 DEG TO +450 DEG F) GENERAL SPECIFICATION FOR《III型(负65华氏度到450华氏度)液压部件的一般规范》.pdf
《AIR FORCE MIL-H-8890-1961 HYDRAULIC COMPONENTS TYPE III (-65 DEG TO +450 DEG F) GENERAL SPECIFICATION FOR《III型(负65华氏度到450华氏度)液压部件的一般规范》.pdf》由会员分享,可在线阅读,更多相关《AIR FORCE MIL-H-8890-1961 HYDRAULIC COMPONENTS TYPE III (-65 DEG TO +450 DEG F) GENERAL SPECIFICATION FOR《III型(负65华氏度到450华氏度)液压部件的一般规范》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-H-8890 Lb 7797906 0188439 O T MILH-8890(ASG) I NOVEMBER 1961 MILITARY SECIFICATION IwpBULIC COMPONENTS, TYIE III, (-65O to +450 F), GENEELAL SPECIFICATION FOR This speoification has been approved by the Department of the Air Foroe and by the Bureau of Naval Weapons. 1. SCOPE 1.1 This peoificatio
2、n covers general re uirements common to hydraulio components used in type III hydraulic systems Specification MIL-H-8891, to +450 F) conforming to For types I and II comporisnts, see Specification MIL-H-8L-C-5541 MIL-1-6866 MIL-1-6868 MIL-P-O MIL-S-7742 MIL-M-7969 Ma-H-844.6 MIL-F-8815 MIEH-8891 MIL
3、-T-9107 MIL-F-25682 MIL-D-70327 Solenoid, Eleotrioal, Gensral Specification for Environmental Testing, Aeronautioal and Aseooiated Chemioal Films for Aluminum and Aluminum Alloge Inspeotion, Ranstrant Method of inspection Proaesa, Maptic Partials Plates, Information and Identifioation Sorew Threads,
4、 Standard, Optimum Seleoted Serbs8 General Speoification far Motors, Alternating Current, O-Cyale, ll5/200 Volt System, Airoraft, Claas A end Class B, General Speoifioation for Hydraulio Fluid, Nonpetroleum Base, horaft Filter ad Filter Elements, Fluid Fressure, Hydraulio Line, i5 Micron Absolute, T
5、ype II Systems Hydraulic Systeme, ManiLed Flight Vehicles, Type III, Design, Installation, and Data Requirements for Test Reports, Preparation of Filter and Filter Element, Fluid Pressure, Hydraulio, Absolute, 25 Micron, - specification, which shall govern. Where the requirements for a 3.3 la or as
6、specified in the detail speci- fication within the fluid and anbie93 temperature range of -65 F to t45Oo F after being fatigued and temperature aged for a period equivalent to that experienced during the life of the component. 3.4.5 Surze pressures.- Components shall be designed so as to not ixuce s
7、urge presswes in excess of 135 perceit of the maximum operating pressure speci- fied in the deteil specification, wheti tested in a system and under test condi- tions as specified in the detail specification, 3. however, drive screws may be used for attaching nameplates. 3.4.12 Directionallv critica
8、l comDonents.- Components which are subject to Line-mounted units shall also be marked nialfur-ctfon or failure owing to reverse installation shall make provision to reider improper installation impossible with an arrow indicating direction of flow. shall be so desig-xed that size or location of por
9、ts or mounting provisions are unsymmetrfcal. Components which mount to structure 3.4.13 Structurai strew- in any case, index markes shall be incorporated to indicate the proper position, The design shall be such that special or unusual 3.13.1 Storage life.- The component shall be designed for B stor
10、age life Periodic inspection and exer- compatible with the specific weapon system requirements and shall perform satis- factorily at any the during the storage period. cising of the component, if required, shall be specified and accompanied by sub- stantiating data. 3.14 Sumlemental reauirements and
11、 information. - 3.l4.1 Froposal requirements.- The contractor shall submit the following with the proposal: (a) Drawings: A prelhainary design data drawing prepared as (b) Electrical power (if applicable) : A tabulation of electrical specified in this specification. power requirements shall be provi
12、ded and shall include the important electrical characteristics at the extreme environ- mental condit ions, 8 o Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-(c) Development programs An outline of the proposed development (d) Quality assurance progr
13、am: An outline of the proposed prepro- (e) testing of any mproven mechanisms, materials, and processes. duction and production testing. Ground eppor$x A list of any recommended publications, spares, equipment, training, and technical service for maintenance, overhaul and testing. 3.l4.2 u.- The cont
14、ractor shall submit the followbg data, Date5 of submittal will be determined in subsequent negotiations. (a) Progress reports8 Periodic reports showing the progress (b) Final versions: Finalized versions of the data under (c) Preproduction and production test reports: Formal reports (d) Engineering
15、drawingss Drawings prepared as specified in of the development program. proposal requirements. on preproduction ani: production tests. Specification MIL-D-70327. 3.14.3 Sumort.- The general areas of expected-contractor support are listed below., Requirements will be deterniined in subsequent negotia
16、tions. (a) Publications I All publications necessary for support of (b) Spares a Recommended storage period, overhaul, and spare (c) Training: Any special training required of service persomel. (d) Technical service t Technical persome1 required to support (e) Failure data: Record of failures in tes
17、t end service. the component. parts provisioning. the component. 3014.4 Ls it is the discretion of Che air vehicle contractor, This approval of similar devices is nut automatic upon approval 4-5 Test failures.- If a test specimen or any of its parts fails to conform to this specification, the contra
18、ctor shall advise the air vehicle contractor within 2i+ hours of the failure and of the planned corrective action. Individual tests may be continued, pending investigation of the failure. Final acceptance of components on hand or produced later will not be made until the cause of failure has been as
19、certained, the correction incorporated, and it is determined by further testing that the corrected component conforms to this specification. investigation of a test failure indicates that defects exist in components already Where the 11 Provided by IHSNot for ResaleNo reproduction or networking perm
20、itted without license from IHS-,-,-MIL-H-8890 Lb 7997906 0188450 T W I MIL-H-8890 (AS) accepted, the contractor shall advise the air vehicle contractor of these defects and shall be responsible for ascertaining and making the corrections to all prts whether delivered or in production. major failures
21、 and resulting corrective action with the proouring activity. The air vehicle contractor shall coordinate 4.6 Test conditions.- 4.6e Test fluid.- The test fluid shall be ML0-8200 Mess otherwise specified in the detail specification. 4.,6.2 Fluid temDerature.- The fluid temperature shall be as specif
22、ied for Unless otherwise specified, the tolerance shall be *5O F, each individual test. If the fluid temperature is not specified, the temperature shall be 95O A15O F. For components with appreciable heat- enerating characteristics, such as relief shall be as specified, and the inlet fluid temperatu
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AIRFORCEMILH88901961HYDRAULICCOMPONENTSTYPEIII65DEGTO450DEGFGENERALSPECIFICATIONFORIII 65 华氏度 450 液压

链接地址:http://www.mydoc123.com/p-427832.html