Astronomy and Astrophysics Advisory Committee.ppt
《Astronomy and Astrophysics Advisory Committee.ppt》由会员分享,可在线阅读,更多相关《Astronomy and Astrophysics Advisory Committee.ppt(17页珍藏版)》请在麦多课文档分享上搜索。
1、Astronomy and Astrophysics Advisory Committee,James Webb Space Telescope (JWST) DiscussionEric P. Smith Astrophysics Division, Science Mission Directorate,5/11/06,AAAC, Ballston,2,Contents,Replan and Special Review Context Special Review Summary Slides with blue background are verbatim from review t
2、eam Astrophysics Division Plans,5/11/06,AAAC, Ballston,3,JWST Status,JWST is the top priority new mission investment for the Astrophysics Division Program is in Phase B, detailed design, confirmation to Phase C: March 2008 Cost-to-launch (April 2006 projection) $2.5B (FY06) European contribution def
3、ined (value $0.5B) , industrial partners under contract Project on track for January 2007 technology non-advocate review, beginning of mission confirmation process Cost Comparison (FY06, design, develop and construction only, full-costed) with other Great Observatories:Collecting Area Launch Mass JW
4、ST: $0.1B/m2 $0.5M/kg (projected) Spitzer: $1.4B/m2 $0.8M/kg Chandra: $0.2B/m2* $0.6M/kg HST: $0.9B/m2 $0.4M/kg,*Chandras grazing incidence optics not directly analogous to other great observatorys normal incidence optics,5/11/06,AAAC, Ballston,4,Replan and Special Review Context,JWST reports growth
5、 in development cost - Mar05 Science Mission Directorate (SMD) investigates descopes, commissions independent Science Assessment Team (SAT), directs replanning - Apr05 PA&E commissions independent special review - May05 Interim special Agency Program Management Council (APMC) meetings - Jul05, Sep05
6、, Jan06 Replanning completed - Mar06 Special Review Completed - Apr06 Final special APMC meeting - Apr06,5/11/06,AAAC, Ballston,5,JWST Cost Growth Today,$1B net cost growth from POP-04; No change since September 2005 $530M for 22 month launch slip to June 2013. Launch vehicle uncertainty and lack of
7、 TAA Budget profile limitations in FY06 and 07 Previous budget cuts Schedule reduction risk $177M at NGST Reevaluation of I&T effort, additional launcher-related testing requirements, additional ISIM resources, etc $125M of recommended added contingency funding Contingency levels on cost-to-go 19% $
8、113M in instruments and instrument-related elements Change in content (cryo-cooler, IEC, ASIC, IRSU), growth in Microshutter and detector cost, etc $96M in JWST project growth other than ISIM or NGST JSC Chamber modifications, ITA pool, etc,5/11/06,AAAC, Ballston,6,Special Review Process,Many SRT me
9、mbers have prior experience on JWST or relevant experience on other systems Team attended System Definition Review at GSFC January 23-27, 2006 Site meetings held at GSFC February 15-17, 2006, and at NGST March 12-18, 2006 Special in-depth site/telecon reviews were held at: GSFC (Mission Systems Engi
10、neering) - telecon NGST (Sunshield, Backplane,Thermal Testing) Tinsley Corp. (Primary Mirror Segments) GSFC (ISIM Structures, Micro-shutter Array, Program Schedules) STScI (Mission Operations) telecon Observer on Optical Product Integrity Team (PIT) Independent Cost Estimate (ICE) developed Out-brie
11、fing Process: April 7, 2006, GSFC Management Review April 12, 2006, Science Mission Directorate Program Management Council April 13, 2006, Agency Program Management Council,5/11/06,AAAC, Ballston,7,Executive Summary,Scientific performance meets the expectations of the science community Technical con
12、tent is complete and sound GSFC and Contractor teams are effective Early year funding constraints are the major re-plan issue,5/11/06,AAAC, Ballston,8,Management & Engineering Capability and Strategy,Worked effectively with the science community to implement Science Assessment Team (SAT) findings Th
13、e team is well integrated, organized, experienced and has strong institutional management support The re-plan effectively prioritizes the critical elements: Advanced technology development Telescope elements ISIM development Sunshield development Critical system interfaces and analyses are prioritiz
14、ed to reduce risk in hardware development and fabrication,5/11/06,AAAC, Ballston,9,Management and Engineering Progress,All flight primary mirror segment blanks are delivered and machining at Axsys is on schedule On schedule toward completion of Tinsley mirror fabrication capability in the fall of 20
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTRONOMYANDASTROPHYSICSADVISORYCOMMITTEEPPT