1、PMP 资格认证考试-项目质量管理(四)及答案解析(总分:20.00,做题时间:90 分钟)一、B单项选择题/B(总题数:20,分数:20.00)1.The process giving confidence that the project will meet appropriate quality standards is called _. A. scope verification B. perform quality control C. perform quality assurance D. quality planning(分数:1.00)A.B.C.D.2.The stati
2、stical method that looks at the influence of different factors on specific variables is called _. A. design of experiments B. benchmarking C. variability of factors D. ISO(分数:1.00)A.B.C.D.3.Which of the following has the greatest effect on a products reliability and maintenance characteristic? A. Co
3、nceptualization. B. Product design. C. Fabrication. D. A and B.(分数:1.00)A.B.C.D.4.On a project the project manager should strive for a “Quality Level“ that _. A. is the highest level possible B. is as close to the project objectives as possible C. represents the least cost to the project D. exceeds
4、the specified requirement of the project(分数:1.00)A.B.C.D.5.Perform quality control in the final analysis is _. A. using the technical procedures of monitoring project results to decide if the outputs meet the requirements B. a production system C. a inspection system D. fitness for purpose(分数:1.00)A
5、.B.C.D.6.Costs of quality include _. A. the total of all costs incurred to assure the production and delivery of acceptable products and services B. only costs classified as prevention, detection and corrective action C. only the costs of scrap, rework due to defects, customer returns and warranty c
6、osts D. the expense of upper management(分数:1.00)A.B.C.D.7.Who benefits from a strong, comprehensive and consistent quality control program? A. The contracting organizations. B. The manufacturing group. C. The customer. D. A, Band C.(分数:1.00)A.B.C.D.8.To ensure the project team provides the functiona
7、lity the customer expects in a new piece of software, the PM asks the customer for sign-off on the design criteria. These documents are _. A. technical specifications B. performance specifications C. product descriptions D. quality assurance perform quality assurance(分数:1.00)A.B.C.D.9.The characteri
8、stics of a well-rounded and consistent quality program are _. A. top management support, quality is designed into the product or service, recognition of quality performance at all organizational levels, using statistics as a basis for control, regular audits, and team participation in the quality co
9、ntrol process B. middle management support only, quality is designed into the product or service, recognition of quality performance at all organizational levels, a strong and active punishment system, using statistics as a basis for control, and team participation in the quality control process C.
10、top management support, a quality policy force, a strong punishment system, quality is designed into the product or service, recognition of quality performance at all organizational levels, using statistics as basis for control and regular audits D. top management support, quality is designed into t
11、he product or service, recognition of quality performance at all organizational levels, using statistics as a basis for control, regular audits, and a global information system(分数:1.00)A.B.C.D.10.Jake has been assigned the position of PM of multi-organizational project. His organization, which is th
12、e primary performing organization, has a weak quality policy. The other organizations have no quality policy. Jake should _. A. use the policy for his organization, since his organization is the primary performing organization B. forget about the quality aspects of the project since two-thirds of th
13、e team have no quality policy C. work with the team members from the various organizations and develop a quality policy for the project without telling anyone, to eliminate negative feedback D. seek buy-in from all organizations to fund a quality program(分数:1.00)A.B.C.D.11.The widget production proj
14、ect is well underway. The requirements are clear that each widget must weigh between 0.320 and 0.325 ounces. The first day of test production resulted in 1247 widgets. Of the widgets inspected 47% fell within the acceptable weight range. This is an example of _. A. variable sampling B. attribute sam
15、pling C. control charting D. flow charting(分数:1.00)A.B.C.D.12.A project team is in the design stage of a new mountain bike prototype. The team is in the process of identifying which type of frame and material will provide high performance at a low cost. Which of the following is the most likely tech
16、nique used to determine these variables? A. cost/Benefit analysis. B. Ishikawa diagram. C. Design of experiments. D. System flowchart.(分数:1.00)A.B.C.D.13.Your project has had a major defect and you have gotten the project team and the quality engineers involved in problem analysis. There are three d
17、ifferent opinions of what the cause of the problem might be. In order to get the root of the problem you decide to use a cause-and-effect diagram. Which of the following would best describe what the group is involved in? A. Quality analysis. B. Quality planning. C. Quality control Perform quality co
18、ntrol. D. Quality assurance Perform quality assurance.(分数:1.00)A.B.C.D.14.The project team has created a plan for how they will implement the quality policy. If this changes during the project, it will also be a change to _. A. the project plan B. the quality control plan C. the quality assurance pl
19、an D. the quality management plan(分数:1.00)A.B.C.D.15.Which of the following is true of inspections? A. They may not be conducted by the project team. B. They test future desires of prospective customers. C. They can only be conducted on the final product. D. They prevent errors from reaching the cus
20、tomer before delivery.(分数:1.00)A.B.C.D.16.Based on quality control measurements on your manufacturing project, management releases that immediate corrective action is required to the material requirements planning (MRP) system to prevent future problems on other projects and to minimize rework. To i
21、mplement the necessary changes you should follow _. A. the organizations quality policy B. the quality management plan C. established operational definitions and procedures D. procedures for integrated change control(分数:1.00)A.B.C.D.17.Which of the following is not able to create positive effect? A.
22、 Continuous improvement. B. Do more inspection. C. Statistical quality control. D. Customer trace process.(分数:1.00)A.B.C.D.18.The project team should have knowledge of statistical process control to help conduct quality control activities. Of all the topics involved, which of the following is the mo
23、st important for the team to understand? A. Sampling and probability. B. Attribute sampling and variable sampling. C. Tolerances and control limits. D. Special causes and random causes.(分数:1.00)A.B.C.D.19.Ranking ordering of defects should be used to guide corrective action. This is the underlying p
24、rinciple behind _. A. trend analysis B. inspection C. control charts D. pareto diagrams(分数:1.00)A.B.C.D.20.The purpose of the Taguchi method is to _. A. manage the flow of material for better visibility and control B. use statistical techniques to compute a “loss function“ to determine the cost of p
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 计算机 职业资格 PMP 资格 认证 考试 项目 质量管理 答案 解析 DOC