1、PMP 资格认证考试-项目质量管理(三)及答案解析(总分:20.00,做题时间:90 分钟)一、B单项选择题/B(总题数:20,分数:20.00)1.There are specific absolutes for a comprehensive quality program. These are _. A. conformance to WBS B. fitness of use and involvement during the planning phase C. fitness of use and fitness for purpose D. none of the above(分
2、数:1.00)A.B.C.D.2.A Pareto diagram is used to _. A. identify nonconformity types B. provide a quick look at the data at a single point in time C. determine the effect of a corrective action D. determine the equation of a scatter plot(分数:1.00)A.B.C.D.3.Product availability contains _. A. usability and
3、 maintainability B. producibility and maintainability C. usability and reliability D. reliability and maintainability(分数:1.00)A.B.C.D.4.The process control charts are used _. A. to graph what typically focuses on the prevention of a problem B. to detect the problem C. to reject the problem D. to det
4、ermine the acceptability of the sample(分数:1.00)A.B.C.D.5.Setting the number of defects is a direct responsibility of _. A. a functional worker B. the project manager C. management D. the accounting department(分数:1.00)A.B.C.D.6.The primary driver behind the demand for continual quality improvement is
5、 _. A. an increase in the number of the projects being worked B. widespread public interest in government cost improvement reports C. the prevalence of media reports on quality circles and other quality improvement D. the need to reduce the cost and ensure the performance of products(分数:1.00)A.B.C.D
6、.7.Quality control should be performed _. A. when the product of the project is completed to ensure that no defects exist B. throughout the project life cycle C. during the closeout phase but before final acceptance by the customer D. as desired by the quality assurance department(分数:1.00)A.B.C.D.8.
7、Of the four types of risk inherent in project management, which one will have the most lasting effect from the customers perspective if not managed well? A. Scope risk. B. Schedule risk. C. Cost risk. D. Quality risk.(分数:1.00)A.B.C.D.9.Which of the following is not considered a cost of nonconformanc
8、e to quality? A. Scrap. B. Rework. C. Expediting. D. Process control.(分数:1.00)A.B.C.D.10.The “zero defects“ concept was proposed by _? A. Juan B. Crosby C. Deming D. Taguchi(分数:1.00)A.B.C.D.11.The benefits of a quality control program include _. A. reduced short term costs B. increased long term cos
9、ts C. able to make acceptance decisions D. a loss in competitiveness(分数:1.00)A.B.C.D.12.Due to lack of employee training and proper production controls, defects in a production run caused rework which cost the company $ 250000. How much of this cost is directly attributable to the employees on the p
10、roduction line? A. $75OOO B. $37500 C. $212500 D. $145OO(分数:1.00)A.B.C.D.13.The cost of a construction project was originally estimated at the $100000000. The current forecast to completion is $175000000. This could be due to _. A. poor project planning in terms of scope, specifications, strategy an
11、d implementation B. experienced project planning and management staff are expensive and difficult to find C. project administration is an overhead cost which contributes greatly to an increase in overall project cost D. A and B(分数:1.00)A.B.C.D.14.The project team uses various tools during project pl
12、anning. To determine the primary cause of problems within a process, the team would use _. A. flowcharting B. cost/benefit considerations C. benchmarking D. variable experiments(分数:1.00)A.B.C.D.15.The project quality assurance characterizes the followings except _. A. assessing overall project perfo
13、rmance B. checking the quality of specific project deliverables C. provided to the project management team D. provided to the project sponsor(分数:1.00)A.B.C.D.16.Which statement is true of quality planning? A. Quality planning should be performed regularly throughout the project. B. Quality planning
14、is done to compile a risk management plan. C. Quality planning is done only during project planning. D. Quality planning is not considered during project execution.(分数:1.00)A.B.C.D.17.Quality is achieved when _. A. the requirements have been met B. customer expectations have been exceeded C. the cus
15、tomer indicates acceptance of the product or service D. the customer stops asking for additional features(分数:1.00)A.B.C.D.18.During a team meeting, the team adds a specific area of extra work to the project because they have determined it would benefit the customer. What is wrong in this situation?
16、A. The team is gold plating. B. These efforts shouldnt be done in meetings. C. Nothing. This is how to meet or exceed customer expectations. D. Nothing. The project manager is in control of the situation.(分数:1.00)A.B.C.D.19.What percentage of the total distribution are 1 sigma from the mean equal to
17、? A. 68.8 %0 B. 99.9% C. 95.5 D. 99.7%(分数:1.00)A.B.C.D.20.The upper and lower control limits in a control chart indicate that _. A. boundaries the customer will accept B. acceptable specification limits C. acceptable range of variation in the process D. statistical control points form judging the su
18、ccess or failure of the project(分数:1.00)A.B.C.D.PMP 资格认证考试-项目质量管理(三)答案解析(总分:20.00,做题时间:90 分钟)一、B单项选择题/B(总题数:20,分数:20.00)1.There are specific absolutes for a comprehensive quality program. These are _. A. conformance to WBS B. fitness of use and involvement during the planning phase C. fitness of use
19、 and fitness for purpose D. none of the above(分数:1.00)A.B.C. D.解析:这里的全面质量计划,指的是关于产品要求和技术规范的计划,当然应该包括适用性和满足客户的需求。另外,工作分解结构是项目工作范围的总和,不包括对项目产品要求的说明。 全面的具体的质量计划是_。 A) 符合工作分解结构的要求 B) 适用性与在计划阶段的参与 C) 适用性与符合用户需求 D) 以上都不是2.A Pareto diagram is used to _. A. identify nonconformity types B. provide a quick lo
20、ok at the data at a single point in time C. determine the effect of a corrective action D. determine the equation of a scatter plot(分数:1.00)A.B.C. D.解析:“按发生频率排序的目的是为了有重点地采取纠正措施。项目团队应首先要处理那些导致最多缺陷的原因。”因为帕累托图以其发生频率顺序显示信息,它集中于最关键的问题。因此通过它可以表明,针对不同的错误产生根源采取相应的纠正措施,会有不同的效果。例如,80%的问题产生于原因 A,则针对A 采取的纠正措施所产
21、生的效果将可以消除 80%的问题。 帕累托图被用来_。 A) 确定不一致类型 B) 在单个时间点提供数据的快速浏览 C) 确定纠正措施的效果 D) 确定散点图的等式3.Product availability contains _. A. usability and maintainability B. producibility and maintainability C. usability and reliability D. reliability and maintainability(分数:1.00)A.B.C.D. 解析:在产品与项目规划质量过程中,必须考虑的属性包括: 可生产性
22、(producibility,或称可构造性(constructibility); 可用性(usability); 可靠性(reliability, mean time between failure, 简称 MTBF,即平均故障间隔时间); 可维护性(maintainability, bean time to repair, 简称 MTTR,即平均修理时间); 有效性(availability, MTBF+MTTR): 可操作性(operability); 可伸缩性(flexibility); 社会可接受性(social acceptability); 可支付性(affordability)。
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 计算机 职业资格 PMP 资格 认证 考试 项目 质量管理 答案 解析 DOC