1、03-01-12 08 71 00-1 SECTION 08 71 00 DOOR HARDWARE SPEC WRITER NOTE: Delete between / - / if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION A. Door hardware and related items necessary for
2、 complete installation and operation of doors. 1.2 RELATED WORK A. Caulking: Section 07 92 00 JOINT SEALANTS. B. Application of Hardware: / Section 08 14 00, WOOD DOORS / Section 08 11 13, HOLLOW METAL DOORS AND FRAMES / Section 08 17 10, INTEGRATED DOOR ASSEMBLIES / Section 08 41 13, ALUMINUM-FRAME
3、D ENTRANCES AND STOREFRONTS / Section 08 42 33, REVOLVING DOOR ENTRANCES / Section 08 33 00, COILING DOORS AND GRILLES / Section 08 33 13, COILING COUNTER DOORS / Section 08 34 36, DARKROOM DOORS / Section 08 34 53, SECURITY DOORS AND FRAMES / Section 08 34 73, SOUND CONTROL DOOR ASSEMBLIES / Sectio
4、n 08 42 23, INTENSIVE CARE UNIT/CRITICAL CARE UNIT (ICU/CCU) ENTRANCES / Section 08 42 29, AUTOMATIC ENTRANCES / Section 08 71 13, AUTOMATIC DOOR OPERATORS /Section 08 71 13.11, LOW ENERGY DOOR OPERATORS / Section 13 49 00, RADIATION PROTECTION / Section 32 31 33, CHAIN LINK FENCES AND GATES / and S
5、ection 32 31 19, DECORATIVE METAL FENCES AND GATES / C. Finishes: Section 09 06 00, SCHEDULE FOR FINISHES. D. Painting: Section 09 91 00, PAINTING. E. Card Readers: Section 28 13 11, PHYSICAL ACCESS CONTROL SYSTEMS. F. Electrical: Division 26, ELECTRICAL. G. Fire Detection: Section 28 31 00, FIRE DE
6、TECTION AND ALARM. 1.3 GENERAL A. All hardware shall comply with UFAS, (Uniform Federal Accessible Standards) unless specified otherwise. B. Provide rated door hardware assemblies where required by most current version of the International Building Code (IBC). C. Hardware for Labeled Fire Doors and
7、Exit Doors: Conform to requirements of NFPA 80 for labeled fire doors and to NFPA 101 for exit doors, as well as to other requirements specified. Provide hardware listed by UL, except where heavier materials, large size, or better grades are Provided by IHSNot for ResaleNo reproduction or networking
8、 permitted without license from IHS-,-,-03-01-12 08 71 00-2 specified herein under paragraph HARDWARE SETS. In lieu of UL labeling and listing, test reports from a nationally recognized testing agency may be submitted showing that hardware has been tested in accordance with UL test methods and that
9、it conforms to NFPA requirements. SPEC WRITER NOTE: The word “FIRE“ must be included as part of the certification on the Underwriters Laboratories label on exit devices to be used on fire doors. D. Hardware for application on metal and wood doors and frames shall be made to standard templates. Furni
10、sh templates to the fabricator of these items in sufficient time so as not to delay the construction. E. The following items shall be of the same manufacturer, except as otherwise specified: 1. Mortise locksets. 2. Hinges for hollow metal and wood doors. 3. Surface applied overhead door closers. 4.
11、Exit devices. 5. Floor closers. 1.4 WARRANTY A. Automatic door operators shall be subject to the terms of FAR Clause 52.246-21, except that the Warranty period shall be two years in lieu of one year for all items except as noted below: 1. Locks, latchsets, and panic hardware: 5 years. 2. Door closer
12、s and continuous hinges: 10 years. 1.5 MAINTENANCE MANUALS A. In accordance with Section 01 00 00, GENERAL REQUIREMENTS Article titled “INSTRUCTIONS“, furnish maintenance manuals and instructions on all door hardware. Provide installation instructions with the submittal documentation. 1.6 SUBMITTALS
13、 A. Submittals shall be in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES. Submit 6 copies of the schedule per Section 01 33 23. Submit 2 final copies of the final approved schedules to VAMC Locksmith as record copies (VISN Locksmith if the VAMC does not have a locksmith).
14、 B. Hardware Schedule: Prepare and submit hardware schedule in the following form: Hardware Quantity Size Reference Publication Finish Mfr. Name Key Control UL Mark (if ANSI/BHMA Finish Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-03-01-12 08 71 0
15、0-3 Item Type No. and Catalog No. Symbols fire rated and listed) Designation C. Samples and Manufacturers Literature: 1. Samples: All hardware items (proposed for the project) that have not been previously approved by Builders Hardware Manufacturers Association shall be submitted for approval. Tag a
16、nd mark all items with manufacturers name, catalog number and project number. 2. Samples are not required for hardware listed in the specifications by manufacturers catalog number, if the contractor proposes to use the manufacturers product specified. D. Certificate of Compliance and Test Reports: S
17、ubmit certificates that hardware conforms to the requirements specified herein. Certificates shall be accompanied by copies of reports as referenced. The testing shall have been conducted either in the manufacturers plant and certified by an independent testing laboratory or conducted in an independ
18、ent laboratory, within four years of submittal of reports for approval. 1.7 DELIVERY AND MARKING A. Deliver items of hardware to job site in their original containers, complete with necessary appurtenances including screws, keys, and instructions. Tag one of each different item of hardware and deliv
19、er to Resident Engineer for reference purposes. Tag shall identify items by Project Specification number and manufacturers catalog number. These items shall remain on file in Resident Engineers office until all other similar items have been installed in project, at which time the Resident Engineer w
20、ill deliver items on file to Contractor for installation in predetermined locations on the project. 1.8 PREINSTALLATION MEETING A. Convene a preinstallation meeting not less than 30 days before start of installation of door hardware. Require attendance of parties directly affecting work of this sect
21、ion, including Contractor and Installer, Architect, Project Engineer and VA Locksmith, Hardware Consultant, and Hardware Manufacturers Representative. Review the following: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-03-01-12 08 71 00-4 1. Inspec
22、tion of door hardware. 2. Job and surface readiness. 3. Coordination with other work. 4. Protection of hardware surfaces. 5. Substrate surface protection. 6. Installation. 7. Adjusting. 8. Repair. 9. Field quality control. 10. Cleaning. 1.9 INSTRUCTIONS A. Hardware Set Symbols on Drawings: Except fo
23、r protective plates, door stops, mutes, thresholds and the like specified herein, hardware requirements for each door are indicated on drawings by symbols. Symbols for hardware sets consist of letters (e.g., “HW“) followed by a number. Each number designates a set of hardware items applicable to a d
24、oor type. SPEC WRITER NOTE: Delete following paragraph if new hospital station, or where existing station is to be rekeyed. /B. Keying: All cylinders shall be keyed into existing _ / Great / Grand Master Key System /. Provide removable core cylinders that are removable only with a special key or too
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA0871002012DOORHARDWAREPDF