SANS 10120-5 MG-1996 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section MG B.pdf
《SANS 10120-5 MG-1996 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section MG B.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-5 MG-1996 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section MG B.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120-5 Section MG:1996 Bituminous surface treatment First revision Part 5 : Contract administration Section MG Contents 1 Startofcnstruction 1 1.1 G
4、eneral . 1 2 Immediately after the handing over of the site . 1 2.1 General . 1 2.2 Samples 1 2.3 Curingcoat l . 2.4 Binderforslurryseal 1 2.5 Alternativebinders . 1 3 Duringconstruction 1 3.1 Constructionmethods 1 3.1 . 1 Flat steel-tyred rollers 1 3.1.2 Aggregate for slurry seal l 3.1.3 Protection
5、 of kehs. channels. etc 1 3.1.4 Spraying of prime and bituminous binders 1 3.1.5 Precoatingmethods 2 3.1.6 Applicationofslurryseal 2 3.1.7 Sandseal . 2 3.2 Administration 2 3.2.1 Mixer for slurry seal . 2 3.2.2 Demarcation of work area . 3 3.2.3 Applicationrates 3 3.2.4 Finishedsurface 3 4 Quality c
6、ontrol and other considerations . 3 This section of the code supersedes SABS 0120-5 : Section MG:l981 Approved by the PRESIDENT OF THE SOUTH AFRICAN BUREAU OF STANDARDS CODE OF PRACTICE SABS 0120-5 : Section MG:1996 SABS 1200 MG : Bituminous surface treatment NOTE - The clause number(s) given in bra
7、ckets at the beginning or after the heading of a clause isfare, unless otherwise stated, the number(s) of the relevant clause(s) of SABS 1200 MG. 1 Start of construction 1.1 General For the purposes of this part of the code, contract administration starts with instructions to the contractor to comme
8、nce work as set out in 4.1 of the Introduction to SABS 0120. 2 Immediately after the handing over of the site 2.1 General Give early attention to the matters set out in 2.2 to 2.5 below. 2.2 Samples (7.1) Test samples of materials should be submitted by the contractor timeously. 2.3 Curing coat (5.3
9、) Unless details have been set out in the drawings or elsewhere in the contract, it is necessary for the engineer to advise the contractor of the areas or sections to be cement-stabilized, to enable him to programme his work effectively. 2.4 Binder for slurry seal (5.5.6) The binder used for slurry
10、seal should not be varied, since any variation will affect adversely the appearance of the finished surface. 2.5 Alternative binders If alternative binders have been offered by the contractor in his tender (see Note (b) in section MG of SABS 0120-4), the engineer should make the choice early. 3 Duri
11、ng construction 3.1 Construction methods 3.1 .l Flat steel-tyred rollers (4.4.3) Flat steel-tyred rollers should be heavy enough to embed the aggregate firmly, but not so heavy as to crush more than a small percentage of the aggregate particles. Generally, the mass of a roller has to be reduced if t
12、he aggregate is susceptible to crushing or has a high flakiness index, or if the existing surface is very hard or uneven. Furthermore, the greater the uniformity of the size of the aggregate particles, the smaller is the amount of crushing that occurs. 3.1.2 Aggregate for slurry seal (3.7) Water may
13、 be used to assist in the screening of aggregate for slurry seal and to clean the aggregate of dust and foreign matter. 3.1.3 Protection of kerbs, channels, etc. (5.1.3) The responsibility for ensuring that kerbs, channels, etc., are not sprayed or splashed with binder or slurry or damaged during sp
14、ray or slurry applications rests with the contractor. He has sole discretion as to the method of protection to be used, e.g. sand, mud, plastics sheeting or cement pockets. A thick mud mixed in a cement mixer and painted on kerbs, channels, etc., has been found to be extremely effective. 3.1.4 Spray
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101205MG1996CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART5CONTRACTADMINISTRATIONSECTIONMGBPDF

链接地址:http://www.mydoc123.com/p-1028621.html