REG NASA-LLIS-3636-2012 Lessons Learned Different Groups in Different Locations Working On the Same System but Under Different Contracts.pdf
《REG NASA-LLIS-3636-2012 Lessons Learned Different Groups in Different Locations Working On the Same System but Under Different Contracts.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-3636-2012 Lessons Learned Different Groups in Different Locations Working On the Same System but Under Different Contracts.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Public Lessons Learned Entry: 3636 Lesson Info: Lesson Number: 3636 Lesson Date: 2010-08-26 Submitting Organization: KSC Submitted by: Annette Pitt Subject: Different Groups in Different Locations Working On the Same System but Under Different Contracts Abstract: The Microwave Scanning Beam Landing
2、System (MSBLS) contract, originally controlled by Johnson Space Center (JSC), was split across NASA centers. The Kennedy Space Center (KSC) has operation and maintenance (O therefore, the DFRC and WSTF contractor teams are required to report any anomalies and resolve technical issues with the collab
3、oration of the KSC team. Since the groups were not managed under the same contract, responsibilities were not clearly identified, which resulted in miscommunication and possible detrimental consequences. Description of Driving Event: Prior to the STS-124 launch, several issues with the MSBLS 60Hz Po
4、wer cables at DFRC Runway 22R caused a smoldering fire and smoke at the MSBLS primary and backup shelters resulting in part failure and equipment damage, as well as loss of power to one of the MSBLS JR System. The failure resulted in smoke in the shelter, florescent light flickering and melting of t
5、he thermal breaker monitor panel. Per Safety Assurance Analysis document SAA-00199, subsequent failure of the other system could result in possible loss of life and/or vehicle At the time of the failure, KSC placed several phone calls to different personnel and received slightly different versions o
6、f events; however, it was clear the primary cause (as understood at KSC) was maintenance of MSBLS power cable. Although the Operations and Maintenance responsibility is split between KSC and JSC, sustaining engineering for all equipment, regardless of location is done at KSC. KSC is required to repo
7、rt any MSBLS issues to the Launch Readiness Director (LRD), who is at KSC. Both DFRC and WSTF had subcontracts with other companies to perform maintenance and operation. On numerous occasions, when the teams in charge of O&M had issues, not enough information about system problems was provided in or
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS36362012LESSONSLEARNEDDIFFERENTGROUPSINDIFFERENTLOCATIONSWORKINGONTHESAMESYSTEMBUTUNDERDIFFERENTCONTRACTSPDF

链接地址:http://www.mydoc123.com/p-1019429.html