REG NASA-LLIS-1289-2002 Lessons Learned Managing Human Resources in Projects Where Each Individual is Multi-tasked Frequently Required to Work Overtime is One-deep in Skills and Spty C.pdf
《REG NASA-LLIS-1289-2002 Lessons Learned Managing Human Resources in Projects Where Each Individual is Multi-tasked Frequently Required to Work Overtime is One-deep in Skills and Spty C.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1289-2002 Lessons Learned Managing Human Resources in Projects Where Each Individual is Multi-tasked Frequently Required to Work Overtime is One-deep in Skills and Spty C.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1289Lesson Info:a71 Lesson Number: 1289a71 Lesson Date: 2002-01-01a71 Submitting Organization: ARCa71 Submitted by: DR Mendoza/ M. SumichSubject: Managing Human Resources in Projects Where Each Individual is Multi-tasked, Frequently Required to Work Overtime, is One-deep in Sk
2、ills and Specialization, and is Required to Have a Security Clearance Description of Driving Event: The project had three significant challenges with respect to managing human resources, and the potential loss of any project member was a significant risk. First, the project was classified and used a
3、 small, select, and collocated team. When a project member left or transferred to other work, the delay in bringing in someone new could be significant and cause both a delay in schedule and overload on other team members. Second, the project was developing two identical flight vehicles, which split
4、 some project resources into teams dedicated to each vehicle. However, many of the project personnel were specialists devoted to both vehicles. The bulk of the schedule was sequential to make effective and efficient use of these people. However, at times parallel efforts were taking place that stret
5、ched certain project people to their limit. Third, once the first flight vehicle was completed, it was shipped to a distant location for flight, which further split the project personnel. The result was that many members devoted to one vehicle could not assist in the efforts of completing the other
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS12892002LESSONSLEARNEDMANAGINGHUMANRESOURCESINPROJECTSWHEREEACHINDIVIDUALISMULTITASKEDFREQUENTLYREQUIREDTOWORKOVERTIMEISONEDEEPINSKILLSANDSPTYCPDF

链接地址:http://www.mydoc123.com/p-1018928.html