1、Lessons Learned Entry: 0939Lesson Info:a71 Lesson Number: 0939a71 Lesson Date: 2001-02-15a71 Submitting Organization: JPLa71 Submitted by: David A. NicholsSubject: MPL Uplink Loss Timer Software/Test Errors (1998) Abstract: Prelaunch tests and verification of software and hardware used to switch to
2、a redundant string should include assumed failures in either string during all mission phases. MPL did not verify the ability of the Lander to switch to the redundant uplink string after landing assuming a failure in the primary string had occurred during earlier entry, descent and landing phases. R
3、ecognize that transitions to another mission phase are high-risk sequences and that database changes that impact logic decisions should be retested.Description of Driving Event: The Mars Polar Lander (MPL) flight software design contained mission-critical logic errors that were not detected during t
4、esting of the spacecraft due to omissions in the pre-launch test program and pre-launch uplink verification process. The failure reviews (References 1 and 2) attributed MPL mission loss to a leg rebound transient that is summarized in Reference 4.The uplink loss timer is software designed to trigger
5、 a switch from a failed uplink hardware string to the backup string if the spacecraft has not received a command from mission operations for a selected time period. Because of the significant physical reconfiguration of the spacecraft telecommunications equipment from the cruise to post-landing conf
6、iguration, this uplink loss software was planned to self-reconfigure after the landing. Post mission testing demonstrated that an undetected logic error prevented the reconfiguration. With this software misconfigured, the detection of a failed uplink string and the required swapping to the backup st
7、ring could not occur.Inadequate Test of Mission Phase Transition: During software integration testing, there were several tests that crossed the boundary from Entry, Descent and Landing (EDL) to the landed mission phase. After the successful simulated landing, each test issued commands to configure
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS09392001LESSONSLEARNEDMPLUPLINKLOSSTIMERSOFTWARETESTERRORS1998PDF

链接地址:http://www.mydoc123.com/p-1018584.html