REG NASA-LLIS-0929-2000 Lessons Learned Planning Effective Project Reviews (1999).pdf
《REG NASA-LLIS-0929-2000 Lessons Learned Planning Effective Project Reviews (1999).pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0929-2000 Lessons Learned Planning Effective Project Reviews (1999).pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0929Lesson Info:a71 Lesson Number: 0929a71 Lesson Date: 2000-11-29a71 Submitting Organization: JPLa71 Submitted by: K. Atkins, D. OberhettingerSubject: Planning Effective Project Reviews (1999) Abstract: The root cause of the Mars Climate Orbiter (MCO) mission failure was iden
2、tified as cumulative navigation errors. These errors resulted, in part, from operational procedures and software that were inadequately reviewed, evaluated, and implemented. A high degree of formality, anomaly follow-up and close out, selection of reviewers and penetration of technical issues is ess
3、ential in the review process, including the design, operational, and peer reviews.Description of Driving Event: The root cause of the Mars Climate Orbiter (MCO) mission failure was identified as cumulative navigation errors. These errors resulted, in part, from operational procedures and software th
4、at were inadequately reviewed, evaluated, and implemented.During development and operational phases, review board membership frequently did not include the appropriate discipline experts to identify important issues. For example, the Navigation line organization was not represented at the “MOI (Mars
5、 orbit insertion) and Aerobraking Readiness Review“ during which information on cumulative navigational errors was provided. Contrary to established best practices, requests for action were not generated to address issues identified during this review. Neither the project nor the line organizations
6、utilized peer reviews to their full potential.References:1. “Management of MCO Risks During Mars Encounter,“ Lesson Learned No. 09162. “Report on the Loss of the Mars Climate Orbiter Mission,“ JPL D-18441, JPL Special Review Board, November 11, 1999.3. “Phase I Report,“ (NASA) Mars Climate Orbiter M
7、ishap Investigation Board, November 10, Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-19994. “Mars Climate Orbiter Mishap Investigation Board Phase I Report“, Lesson Learned Number 0641, December 1, 19995. Corrective Action Notice No. Z66277, MCO-J
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS09292000LESSONSLEARNEDPLANNINGEFFECTIVEPROJECTREVIEWS1999PDF

链接地址:http://www.mydoc123.com/p-1018574.html