1、 GODDARD TECHNICAL STANDARD GSFC-STD-1001A Goddard Space Flight Center Approved: 10-01-2009 Greenbelt, MD 20771 Expiration Date: 10-01-2014 Superseding GSFC-STD-1001 Criteria for Flight and Flight Support Systems Lifecycle Reviews October 1, 2009 THIS STANDARD HAS NOT BEEN REVIEWED FOR EXPORT CONTRO
2、L RESTRICTIONS; CONSULT YOUR CENTER/FACILITY/HEADQUARTERS EXPORT CONTROL PROCEDURES/AUTHORITY PRIOR TO DISTRIBUTION OF THIS DOCUMENT. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-i FOREWORD This standard is published by the Goddard Space Flight ce
3、nter (GSFC) to provide a consistent set of guidelines that detail the purpose, timing, success criteria and evaluation factors to be considered in the preparation and conduct of both Agency and Center-level mission and element reviews starting at Pre-Phase A, Concept Studies, through Phase F, Close
4、Out. These guidelines have been derived from best practices in use at GSFC as compiled both internally and at the NASA Agency level. Approved by: Original Signed by: George Alcorn Date Goddard Technical Standard Coordinator NASA/GSFC Code 300 Original Signed by: Steven Scott Date Chief Engineer NASA
5、/GSFC Code 500 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ii For any questions concerning this standard, please contact Code 301, Chief, System Review Office Goddard Space Flight Center Greenbelt, Maryland 20771 Provided by IHSNot for ResaleNo r
6、eproduction or networking permitted without license from IHS-,-,-iii Approved by: Original signed by: _ Orlando Figueroa Date Director Applied Engineering and Technology Directorate NASA/GSFC Code 500 Approved by: Original signed by: _ George W. Morrow Date Director Flight Programs and Projects Dire
7、ctorate NASA/GSFC Code 400 Approved by: Original signed by: _ Marcus Watkins Date Director Safety and Mission Assurance Directorate NASA/GSFC Code 300 Approved by: Original signed by: Arthur Obenschain Date Deputy Center Director NASA/GSFC Code 100 Provided by IHSNot for ResaleNo reproduction or net
8、working permitted without license from IHS-,-,-iv CHANGE HISTORY LOG Revision Effective Date Description of Changes - 02/19/2005 Baseline Release A 10/01/2009 Modified to reflect changes to NPR 7120.5 Rev. D, and NPR 7123.1 Rev. A. Provided by IHSNot for ResaleNo reproduction or networking permitted
9、 without license from IHS-,-,-v TABLE OF CONTENTS SECTION PAGE CHANGE HISTORY LOG 3 TABLE OF CONTENTS v LIST OF TABLES . vi 1.0 SCOPE 1 2.0 MISSION AND ELEMENT-LEVEL REVIEWS 2 3.0 MISSION CONCEPT REVIEW (MCR) 5 4.0 SYSTEM REQUIREMENTS AND SYSTEM DEFINITION REVIEWS (SRR/SDR) 7 5.0 PRELIMINARY DESIGN
10、REVIEW (PDR) 10 6.0 CRITICAL DESIGN REVIEW (CDR) 12 7.0 MISSION OPERATIONS REVIEW (MOR) . 14 8.0 SYSTEMS INTEGRATION REVIEW (SIR) 16 9.0 PRE-ENVIRONMENTAL REVIEW (PER) 18 10.0 FLIGHT OPERATIONS REVIEW (FOR) 20 11.0 PRE-SHIPMENT REVIEW (PSR). 22 12.0 OPERATIONAL READINESS REVIEWS (ORR) . 24 13.0 POST
11、-LAUNCH ASSESSMENT REVIEW (PLAR) 26 14.0 CRITICAL EVENT READINESS REVIEW (CERR) 28 15.0 DECOMMISSIONING REVIEW (DR) . 29 ACRONYM LIST . 31 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-vi LIST OF TABLES TABLE PAGE 2-1 Chairing Organizations of Key
12、Mission and Element-Level Reviews 4 3-2 MCR Success Criteria . 6 4-2 SRR/SDR or MSRR/MDR Success Criteria . 8 5-2 PDR Success Criteria. 11 6-2 CDR Success Criteria 13 7-2 MOR Success Criteria . 15 8-2 SIR Success Criteria 17 9-2 PER Success Criteria . 19 10-2 FOR Success Criteria . 21 11-2 PSR Succe
13、ss Criteria . 23 12-2 ORR Success Criteria 25 13-2 PLAR Success Criteria 26 14-2 CERR Success Criteria 28 15-2 DR Success Criteria . 30 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1 1.0 SCOPE 1.1 Purpose The guidelines and criteria contained in t
14、his document are intended for use by the project team, the GSFC System Review Office (SRO), the Independent Program Assessment Office (IPAO), and the Chair of the NASA appointed Standing Review Board (SRB) in support of planning and implementing the reviews conducted under the authority of each orga
15、nization. Such reviews range from subsystem and functional reviews to the mission-level reviews, many of which serve as Key Decision Point (KDP) gateways. The criteria defined in this document have been developed to encompass those specified by NPR 7123.1. As a supplement to this document, the GSFC
16、STD-1001- Appendix, “Lifecycle Review Success Criteria Key Evaluation Factors”, provides sample evaluation factors intended to be used in assessing the projects achievements toward meeting the success criteria in the development of associated system. The sample lists are organized by review type (i.
17、e., SRR, PDR, CDR, PER, etc.) and are a compilation of evaluation factors acquired from lessons learned and NASA best practices. Key evaluation factors may be tailored to suit the needs of the individual project. They are typically provided as reference material to the project in support of review p
18、reparation and to the independent review panels to support the conduct of the review (agenda definition, line of questioning, etc.). The Key Evaluation Factors are not success criteria for the associated review. 1.2 Applicability This document describes the mission and lower level element reviews (e
19、.g., spacecraft, instrument, ground system, operations, etc.) conducted during the development and operations lifecycle for Goddard Space Flight Center (GSFC) managed projects, and incorporates the requirements for: (a) Agency-level mission reviews as prescribed by National Aeronautics and Space Adm
20、inistration (NASA) Procedural Requirement (NPR) 7120.5D, “NASA Space Flight Program and Project Management Requirements” and NPR 7123.1, “NASA Systems Engineering Processes and Requirements”, (b) Center unique mission, flight, and flight support system reviews as prescribed by GSFC Procedural Requir
21、ement (GPR) 8700.4, “Integrated Independent Reviews”, the results of which are flowed up to the Agency level reviews that are conducted in support of the Agency level mission reviews at a lower level. The Project/Product Manager should use this guide when preparing the Systems Review Plan (SRP) for
22、conducting a comprehensive set of mission, spacecraft, instrument and ground system reviews as required by Agency and GSFC review process documents. In collaboration with the Systems Review Manager (SRM), the IPAO appointed Review Manager (RM) and SRB Chair should use this document to assess complia
23、nce with unique Agency requirements and to prepare the Terms of Reference (ToR) that documents the charter of the SRB. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2 2.0 MISSION AND ELEMENT-LEVEL REVIEWS The SRO is responsible for the implementati
24、on of the GSFC independent review requirements as approved by the Center Management Council (CMC) for all flight projects, including mission and element reviews. This document should be used by the Project Manager, and the Chairs of the Integrated Independent Review Team (IIRT) and SRB, to determine
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGGSFCSTD1001REVA2009CRITERIAFORFLIGHTANDFLIGHTSUPPORTSYSTEMSLIFECYCLEREVIEWSPDF

链接地址:http://www.mydoc123.com/p-1017417.html