1、*USACE / NAVFAC / AFCESA / NASA UFGS-41 22 13.33 (May 2010)-Preparing Activity: NAVFAC Superseding UFGS-41 22 13.33 (April 2008)UFGS 41 22 23.23 20 UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 41 - MATERIAL PROCESSING
2、 AND HANDLING EQUIPMENTSECTION 41 22 13.33PORTAL CRANE TRACK INSTALLATION05/10PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 QUALITY ASSURANCE1.3.1 Welder, Welding Method, and Welder Qualification1.3.2 Certifications Required1.4 DELIVERY, STORAGE, AND HANDLING1.5 EXISTING CONDITIONSPART 2 PRODUCTS2.1
3、 RAIL MATERIALS2.1.1 Crane Rail2.1.1.1 Rail Section Weight and Hardness2.1.1.2 Metallurgical Composition2.1.2 Joint Bars2.1.3 Track Bolts, Nuts, and Washers2.1.4 Rail Clips2.1.5 Weldable, Adjustable Rail Clips2.1.6 Impact Pads2.1.7 Electrodes2.2 CRANE TRACK FITTINGS2.2.1 Four-Rail Portal Crane Track
4、 Systems2.2.2 Two-Rail Portal Crane Track Systems2.2.2.1 Cast Manganese Steel Double-Tongue Switch Points2.2.2.2 Cast Manganese Steel Rigid Ramp-Type Frogs2.2.2.3 Cast Manganese Steel Turntable Frogs2.2.2.4 Fabricated Double-Tongue Switch Points2.2.2.5 Fabricated Rigid Ramp-Type Frogs2.2.2.6 Fabrica
5、ted Turntable Frogs2.2.2.7 Manually-Operated Switch Throw Mechanisms and Housings2.2.2.8 Power-Operated Switch Throw Mechanism2.3 DRAINAGE LINES FOR FITTINGS2.4 FOUNDATION MATERIALSSECTION 41 22 13.33 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS
6、-,-,-2.4.1 Base Plates2.4.2 Anchor Bolts2.4.3 Nonmetallic Nonshrink Grout2.4.4 Epoxy Grout2.4.5 Portland Cement Concrete2.5 STANDARD GAGE RAILROAD TRACK2.6 OIL FOR TRACK FIXTURESPART 3 EXECUTION3.1 WORKMANSHIP3.2 INSTALLATION OF CRANE TRACK AND FITTINGS3.2.1 Crane Rails3.2.2 Welded Crane Rail Joints
7、3.2.2.1 Thermite Method3.2.2.2 Manual Shielded-Arc Welding Method3.2.2.3 Electrical Flash-Butt Method3.2.3 Bolted Rail Joints3.2.3.1 Joint Bars3.2.3.2 Compromise Joints3.2.4 Anchor Bolts3.2.5 Base Plates3.2.6 Crane Track Fittings3.2.6.1 Crane Switches3.2.6.2 Rigid Frogs3.2.6.3 Turntable Frogs3.2.7 S
8、tandard Gage Railroad Tracks3.2.8 Oiling Track Fixtures3.2.9 Concrete3.3 CLEANUP3.4 FIELD QUALITY CONTROL3.4.1 Test for Grout3.4.2 Visual Inspection3.4.3 Ultrasonic Inspection of Welded Rail Joints3.4.4 Load Test3.4.5 Throw Mechanism Operational Test3.4.6 Retesting3.4.7 Record Drawing Survey- End of
9、 Section Table of Contents -SECTION 41 22 13.33 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-41 22 13.33 (May 2010)-Preparing Activity: NAVFAC Superseding UFGS-41 22 13.33 (April 2008)UFGS 41 22 23.23 20
10、UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 41 22 13.33PORTAL CRANE TRACK INSTALLATION05/10*NOTE: This guide specification covers the requirements for procurement, installation and testing of portal crane trackage.Edit this guide specificatio
11、n for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this gu
12、ide specification are welcome and should be directed to the technical proponent of the specification. A listing of Technical Proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (C
13、CR).*NOTE: Use this specification in conjunction with the following NAVFAC Standard Drawings that form part of MIL-DTL-82020 and MIL-DTL-29229 and following Definitive Drawings and UFC 4-860-02N, “Design: Trackage .“ These are available in inch-pound units only.NAVFAC NO./TITLE1404353 “Definitive Dr
14、awing - Fabricated Portal Crane Track Switch Throw Linkage“1404354 “Definitive Drawing - Portal Crane Track Switch Power Mechanism“1404355 “Definitive Drawing - Portal Crane Track SECTION 41 22 13.33 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-
15、,-,-Turntable Frog Power Mechanism“Crane track material, especially fittings, frequently require long lead time to become available to the Contractor. Ensure that the lead time required for material specified in this guide specification is considered when project construction time is established.*NO
16、TE: TO DOWNLOAD UFGS GRAPHICSGo to http:/www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf.*NOTE: Show the following information on the project drawings:1. Existing material to be reused, if required2. Crane rail system type3. Crane wheel type4. Rail curvature geometry5. Switch throw mechanism6. Utility line c
17、onnections for power operated switch throw mechanism7. Drainage for track fittings and switch throw mechanism housings8. Rail alignment and gage9. Rail joint connection types10. Welding method at each welded joint11. Sketch No. 41 22 13.33-1 and Sketch No. 41 22 13.33-2Scheduling restraints which im
18、pact on the Contractors time or cost to perform the work, station operations affected by the Contractors work, and station operations which may affect the performance of the Contractors work should be addressed in Section 01 30 00 ADMINISTRATIVE REQUIREMENTS. The following is a sample paragraph whic
19、h may be used in Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph “Special Scheduling Requirements.“INTERFACE WITH TRACK OPERATIONS: Schedule work to minimize interference to crane, (train,) and vehicular traffic operations. Crane and/or train SECTION 41 22 13.33 Page 4Provided by IHSNot for
20、ResaleNo reproduction or networking permitted without license from IHS-,-,-operations will be scheduled to minimize interruptions to Contractors work. However, critical materials must be transported as necessary. When it is required to transport critical material over trackage where Contractor is wo
21、rking, or to utilize portal cranes in work areas, Government will notify Contractor at least 5 calendar days, or as required, in advance so that he may schedule his work accordingly. If necessary, work scheduling for the entire project will be discussed during the pre-construction conference and pre
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS412213332010PORTALCRANETRACKINSTALLATION 起重机 轨道 安装 PDF

链接地址:http://www.mydoc123.com/p-984871.html