1、*USACE / NAVFAC / AFCESA / NASA UFGS-03 30 00 (November 2011)-Preparing Activity: NAVFAC SupersedingUFGS-03 30 00 (November 2010)UFGS-03 30 00 (Jan 2008-May 2010)UFGS-03 30 00.00 20 (July 2006)UFGS-03 30 00.00 40 (July 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONReferences are in agreement with UMRL
2、dated October 2011*SECTION TABLE OF CONTENTSDIVISION 03 - CONCRETESECTION 03 30 00CAST-IN-PLACE CONCRETE11/11PART 1 GENERAL1.1 REFERENCES1.2 DEFINITIONS1.3 SUBMITTALS1.4 MODIFICATION OF REFERENCES1.5 DELIVERY, STORAGE, AND HANDLING1.5.1 Reinforcement1.5.1.1 Epoxy Coated Reinforcing Steel1.6 QUALITY
3、ASSURANCE1.6.1 Design Data1.6.1.1 Formwork Calculations1.6.2 Drawings1.6.2.1 Shop Drawings1.6.2.2 Formwork1.6.2.3 Reinforcing Steel1.6.3 Control Submittals1.6.3.1 Curing Concrete Elements1.6.3.2 Pumping Concrete1.6.3.3 Silica Fume Manufacturers Representative1.6.3.4 Finishing Plan1.6.3.5 Form Remova
4、l Schedule1.6.3.6 VOC Content for form release agents, curing compounds, and concrete penetrating sealers1.6.3.7 Material Safety Data Sheets1.6.4 Test Reports1.6.4.1 Concrete Mix Design1.6.4.2 Fly Ash and Pozzolan1.6.4.3 Ground Granulated Blast-Furnace Slag1.6.4.4 Aggregates1.6.4.5 Fiber-Reinforced
5、Concrete1.6.5 Field Samples1.6.5.1 Slab Finish SampleSECTION 03 30 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.6.6 Special Finisher Qualifications1.7 ENVIRONMENTAL REQUIREMENTS1.7.1 Submittals for Environmental Performance1.8 SUSTAINAB
6、LE DESIGN REQUIREMENTS1.8.1 Local/Regional Materials1.8.2 Forest Stewardship Council (FSC) Certification1.9 QUALIFICATIONS FOR CONCRETE TESTING SERVICE1.10 QUALIFICATIONS FOR WELDING WORK1.11 CONCRETE SAMPLING AND TESTINGPART 2 PRODUCTS2.1 MATERIALS FOR FORMS2.1.1 Wood Forms2.1.1.1 Concrete Form Ply
7、wood (Standard Rough)2.1.1.2 Overlaid Concrete Form Plywood (Standard Smooth)2.1.2 Plastic Forms2.1.3 Carton Forms2.1.4 Steel Forms2.2 FORM TIES AND ACCESSORIES2.2.1 Polyvinylchloride Waterstops2.2.2 Dovetail Anchor Slot2.3 CONCRETE2.3.1 Contractors Option for Material Only2.3.2 Contractor-Furnished
8、 Mix Design2.3.2.1 Mix Proportions for Normal Weight Concrete2.3.2.2 Lightweight Concrete Proportion2.3.2.3 Required Average Strength of Mix Design2.3.3 Ready-Mix Concrete2.3.4 Concrete Curing Materials2.3.4.1 Absorptive Cover2.3.4.2 Moisture-Retaining Cover2.3.4.3 Membrane-Forming Curing Compound2.
9、4 MATERIALS2.4.1 Cement2.4.1.1 Fly Ash and Pozzolan2.4.1.2 Ground Granulated Blast-Furnace Slag2.4.1.3 Silica Fume2.4.1.4 Portland Cement2.4.2 Water2.4.3 Aggregates2.4.3.1 Aggregates/Combined Aggregate Gradation (Floor Slabs Only)2.4.3.2 Aggregates for Lightweight Concrete2.4.3.3 Recycled Aggregate
10、Materials2.4.4 Nonshrink Grout2.4.5 Admixtures2.4.5.1 Air-Entraining2.4.5.2 High Range Water Reducer (HRWR) (Superplasticizers)2.4.5.3 Pozzolan2.4.6 Vapor Retarderand Vapor Barrier2.4.7 Materials for Curing Concrete2.4.7.1 Impervious Sheeting2.4.7.2 Pervious Sheeting2.4.7.3 Liquid Membrane-Forming C
11、ompound2.4.8 Liquid Chemical Sealer-Hardener Compound2.4.9 Expansion/Contraction Joint Filler2.4.9.1 Preformed Joint Filler Strips2.4.10 Joint Sealants2.4.10.1 Horizontal Surfaces, 3 Percent Slope, MaximumSECTION 03 30 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted wit
12、hout license from IHS-,-,-2.4.10.2 Vertical Surfaces Greater Than 3 Percent Slope2.4.10.3 Waterstops2.4.10.4 Joint Sealant Compound2.4.11 Epoxy Bonding Compound2.4.12 Biodegradable Form Release Agent2.5 REINFORCEMENT2.5.1 Reinforcing Bars2.5.1.1 Galvanized Reinforcing Bars2.5.1.2 Weldable Reinforcin
13、g Bars2.5.1.3 Epoxy-Coated Reinforcing Bars2.5.2 Mechanical Reinforcing Bar Connectors2.5.3 Wire2.5.3.1 Welded Wire Fabric2.5.3.2 Steel Wire2.5.4 Reinforcing Bar Supports2.5.5 Fiber-Reinforced Concrete2.5.6 Chairs and Bolsters: Plastic Steel2.5.7 Dowels for Load Transfer in Floors2.5.8 Supports for
14、Reinforcement2.6 BONDING MATERIALS2.6.1 Concrete Bonding Agent2.6.2 Epoxy-Resin Adhesive Binder2.7 FLOOR FINISH MATERIALS2.7.1 Liquid Chemical Floor Hardener2.7.2 Abrasive Aggregate for Nonslip Aggregate Finish2.7.3 Dry Materials for Colored Wear-Resistant Finish2.7.4 Aggregate for Heavy-Duty Wear-R
15、esistant Finish2.7.5 Aggregate for Heavy-Duty Floor Topping2.8 CLASSIFICATION AND QUALITY OF CONCRETE2.8.1 Concrete Classes and Usage2.8.2 Limits for Concrete Proportions2.8.3 Maximum Size of Aggregate2.8.4 Slump2.8.5 Total Air ContentPART 3 EXECUTION3.1 EXAMINATION3.2 PREPARATION3.2.1 General3.2.2
16、Subgrade Under Foundations and Footings3.2.3 Subgrade Under Slabs on Ground3.2.4 Formwork3.2.5 Edge Forms and Screed Strips for Slabs3.2.6 Reinforcement and Other Embedded Items3.3 FORMS3.3.1 General3.3.2 Design and Construction of Formwork3.3.3 Coating3.3.4 Reshoring3.3.5 Reuse3.3.6 Forms for Stand
17、ard Rough Form Finish3.3.7 Forms for Standard Smooth Form Finish3.3.8 Form Ties3.3.9 Forms for Concrete Pan Joist Construction3.3.10 Tolerances for Form Construction3.3.11 Removal of Forms and Supports3.3.11.1 Special Requirements for Reduced Time Period3.4 WATERSTOP SPLICESSECTION 03 30 00 Page 3Pr
18、ovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.5 FORMED SURFACES3.5.1 Preparation of Form Surfaces3.5.2 Tolerances3.5.3 As-Cast Form3.6 PLACING REINFORCEMENT AND MISCELLANEOUS MATERIALS3.6.1 General3.6.2 Vapor Retarder and Vapor Barrier3.6.3 Reinfor
19、cement Supports3.6.4 Epoxy Coated Reinforcing3.6.4.1 Epoxy Coated Reinforcing Steel Placement and Coating Repair3.6.5 Splicing3.6.6 Future Bonding3.6.7 Cover3.6.8 Setting Miscellaneous Material3.6.9 Construction Joints3.6.10 Expansion Joints and Contraction Joints3.6.11 Fabrication3.6.12 Placing Rei
20、nforcement3.6.13 Spacing of Reinforcing Bars3.6.14 Concrete Protection for Reinforcement3.6.15 Welding3.7 BATCHING, MEASURING, MIXING, AND TRANSPORTING CONCRETE3.7.1 Measuring3.7.2 Mixing3.7.3 Transporting3.8 PLACING CONCRETE3.8.1 General Placing Requirements3.8.2 Footing Placement3.8.3 Vibration3.8
21、.4 Application of Epoxy Bonding Compound3.8.5 Pumping3.8.5.1 Pumping Lightweight Concrete3.8.6 Cold Weather3.8.7 Hot Weather3.8.8 Follow-up3.8.9 Placing Concrete in Forms3.8.10 Placing Concrete Slabs3.8.11 Bonding3.9 SURFACE FINISHES EXCEPT FLOOR, SLAB, AND PAVEMENT FINISHES3.9.1 Defects3.9.2 Not Ag
22、ainst Forms (Top of Walls)3.9.3 Formed Surfaces3.9.3.1 Tolerances3.9.3.2 As-Cast Rough Form3.9.3.3 Standard Smooth Finish3.9.4 _ Finish3.9.5 Surface Finish Samples3.9.6 Grout Finish3.10 FLOOR, SLAB, AND PAVEMENT FINISHES AND MISCELLANEOUS CONSTRUCTION3.10.1 Finish3.10.1.1 Scratched3.10.1.2 Floated3.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS0330002011CASTINPLACECONCRETE 现场 浇筑 混凝土 PDF

链接地址:http://www.mydoc123.com/p-984702.html