NAVY MIL-V-85033 A-1981 VALVE CHARGING《充气阀》.pdf
《NAVY MIL-V-85033 A-1981 VALVE CHARGING《充气阀》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-V-85033 A-1981 VALVE CHARGING《充气阀》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、MILITARY SPECIFICATION VALVE, CHARGING This specification is approved for use by Naval Air Systems Command, Department af the Navy, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification establishes the requirements for the desig
2、n, manufacture, inspection and testing of charging valves. 2. APPLICABLE DOCUMENTS 2.1 Issues of documents. The following documeqts of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS FEDERAL
3、BB-N-411 Nitrogen, Technical. Beneficial comments (recommendations, additione, deletions) and any pertinent data which may be of use in improving this document should be addressed to: neering Specifications and Standards Department (ESSD) Code 93, Lake- hurst, New Jersey 08733, by using the self-add
4、ressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. Commanding Officer, Naval Air Esgineering Center, Engi- FSC 4820 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-85033A 48 W
5、 99777Ob 0278377 O m MILITARY DOD-D-1000 MIL-B-22020 STAMIARDS MIL I TARY MIL-STD-109 MIL-STD-129 MIL-STD-130 MIL-STD-143 MIL-STD-794 MIL-STD-810 MIL-STD-831 MS 20813 DRAWINGS Drawings, Engineering and Associated Lists. Bag, Transparent, Flexible, Sealable, Volatile Corrosion Inhibitor, Treated. Qua
6、lity Assurance Terms and Definitions. Marking for Shipment and Storage. I) Identification Marking of U.S. Military Property. Specifications and Standards, Order of Precedence for Parts and Equipment, Procedures for Packaging and Environmental Test Methods. Test Reports, Preparation of. Cap, High Pre
7、ssure Air Valve. the Selection of. Packing of. NAVAL AIR SYSTEMS COMMAND (Code Ident 30003) DL 58A164D556 Receiver Assemb,ly, Nitragen. (Copies of specifications, standards, drawings, and publications required by contractors in connection with specific procurement functions should be obtained from t
8、he procuring activity or as directed by the contracting officer . ) 3. REQUIREMENTS 3. i First article. When specified (see 6.2.1) , the contractor shall fur- nish sample unit(s) for first article inspection and approval (see 4.4 and 6.4). 3.1.1 First article sample. Unless otherwise specified in th
9、e contract or purchase order (see 6.2.1), a first article sample of the charging valve shall be delivered to-the testing activity designated in the contract or purchase order (see 6.2.1). same methods, materials, processes, and procedures proposed for production. Any production prior to acceptance o
10、f the first article sample is at the con- tractors risk. The first article sample shall be manufactured using the 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-85033A 48 m 7779706 0278378 2 W MIL-V-85033A(AS) 3.2 Selection and quality verif
11、ication of parts and materials. Quality verified parts (see 3.2.1) and materials from approved sources (see 3.2.2) shall be used in the fabrication of the end item. The contractor shall prepare reports of confokmance to applicable requirements. a 3.2.1 Approval of parts and materials. Parts and mate
12、rials proposed for use in the fabrication of the end item that are not specified in detail herein or in applicable referenced documents shall be selected from other documents in the order of precedence specified in MIL-STD-143 and shall be approved by the procuring activity prior to use. (vendor) ap
13、proval and verification of part quality by test. - I Approval shall be predicated upon source 3.2.2 Source approval. The contractor shall be responsible for ascertain- ing that each proposed source for parts and materials maintains a quality control program to ensure consistent delivery of products
14、conforming to appli- cable requirements. When parts or materials are fabricated by the contractor, the area used for that purpose shall be considered the same as an outside vendor insofar as source approval is concerned. Source approvals by the contractor shall be subject to concurrence by the procu
15、ring activity. Source approval will be granted by the procuring activity upon preparation of accept- able evidence of any of the following: a. Formal on-site survey of the vendors manufacturing facilities. b. The source has been previously approved, and evidence is avail- able to confirm that accept
16、able product quality has been main- tained. a c. Other evidence of acceptable product quality is available. 3.2.3 Verification of part quality. Quality verification shall be demon- strated by successful testing of the part to levels of environmental, elec- trical, and physical stresses equal to or g
17、reater than those which will be encountered in the system and as required by the part specification. Part quality may be demonstrated by any of the following: a. When the part is manufactured and qualified to a military specification which includes requirements equal to or more severe than those of
18、the end item application. a. 3 .7. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-b. When the part is manufactured and qualified to a military speci- fication not including all requirements of the application, and additional tests for such requireme
19、nts have been performed. c. When the part is not qualified to a military specification, but all tests appropriate to the application have been performed. 3.2.4 Approved sourcelquality verified parts list (AS/QVPL). An AS/QVPL shall be prepared by the contractor for all subassemblies and parts for ap
20、- proval by the procuring activity. All entries on the AS/QVPL shall be fully substantiated by the preparation of data to satisfy the requirements of source approval and part test approval as specified herein. Reports of all quality verification testing shall conform to the requirements of MIL-STD-8
21、31. contractor may solicit from the procuring activity information as to the status of quality verified parts and approved sources which may have been previously developed. ports are required in those instances where vendors are selected from current AS/QVPLs of other programs. Entries on the AS/QVP
22、L shall identify the vendor and the product which is proposed or use in the charging valves by the con- tractor. In the event several sources have previously been approved for the application, the contractor shall specify the source of the parts to be used, Each item listed shall be supported in acc
23、ordance with the provisions of this section. tion or other Government Qualified Parts Listing. The Neither part environmental tests nor part environmental test re- This listing does not supplant or modify the applicable documenta- 3.2.4.1 Conditions governing the quality verification of parts. When
24、the contractor proposes to demonstrate the quality verification of parts, as provided herein, the following provisions shall apply: a. Test may be performed by the contractor, utilizing his own facilities, the facility of the manufacturer of the part or by any other suitable facility selected by the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILV85033A1981VALVECHARGING 充气 PDF
