NAVY MIL-R-24011 A-1965 RADAR ALTIMETER WARNING SET AN APQ-107( )《AN APQ-107( )型雷达高度表警告设备》.pdf
《NAVY MIL-R-24011 A-1965 RADAR ALTIMETER WARNING SET AN APQ-107( )《AN APQ-107( )型雷达高度表警告设备》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-R-24011 A-1965 RADAR ALTIMETER WARNING SET AN APQ-107( )《AN APQ-107( )型雷达高度表警告设备》.pdf(23页珍藏版)》请在麦多课文档分享上搜索。
1、- -_ MIL-R-24OllA(WP) .i5 March i965 SUPERSEDING MIL-R-24011 (WEP) 15 March i964 MILITARY SPECIJ?ICA!TION RADAR ALTSlCEFEB WARNING SET AN/AFQ-107 (*) This specification has been approved by the Bureau of Naval Weapons, Department of the Navy. 1. SCOPE 1.1 Scope - The equipment covered by this specif
2、ication shall provide an aural warning signal to energize the pilots and copilots headsets and a visual warning signal to illuminate a visual warning feature in accordance with the operational requirements speclf ied herein. 1.2 Classification - The Radar Altimeter Warning Set shall consist of a sin
3、gle unit designated AN/Ap Bases I Mounting; and Mounts, Vibration 1-.4682 Electron Tubes and Transistors, Choice and : (For use with Electronic Equipment in Aircraft) Application of - . - -if .DOUMVPENT COnPiNs 22, PAGE$, 1 FSC 584 _. .-nient interchangeability shall exist between units and all repl
4、aceable - assemblies, subassemblies, nd parer between -1-3 and +29 volts when the altimeter is reliable and less than one volt when the altimeter is unreliable. than 5,000 ohms. 3.4.4.3 signal is a IX voltage of 3-25 f 4 volts when the ASE coupler is engaged (“ON“ condition) and zero volts when the
5、ASE coupler is disengaged (“OFIF condition). than 20,000 ohms. eter power failure input signal voltage is i05 - 122 V RMS,. 380 - 420 cps in the “ON“ condition and zero volts in the impedance presented to this signai shall be greater than 30,000 ohms. Weel Dam and Locked Input Signals - The wheel da
6、m and locked input signal voltage is aircraft DC growid when the wheel is dam and locked and is between + 4.5 and f 29 volts when the wheel is not down and locked. than 10,000 ohms. 3.4.4.2 Reliability Input Signal -.The reliability input signal The input impedance presented to this signal shall be
7、greater ASE Ehgagement Input Signal - The ASE engagement input The input impedance presented to this signal shall be greater 3.4.4.4 Altimeter Indicator Power Failure Input Signal - The altim; condition. The input 3.4.4.5 The input impedance presented to each signal shall be greater Provided by IHSN
8、ot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.4.4.6 Test Command Input Signal - The test command input signal will be +25 2 4 V DC when the- “press to test“ switch is depressed and open circuited at all other times. shall be greater than 200 oms. The input imped
9、ance presented to this signal 3.4.4.7 Pressure Altitude Input Signal - The equipment shall contain a barometric switch. The switch shall be closed at a pressure differential corresponding to an altitude increase of TOO 2 200 feet with respect to the take-off altitude and shall be open at any altitud
10、e below 700 f 200 feet with respect to the take-off altitude. be limite however, it may be reworked by the contractor and submitted for acceptance as a production equipment, “he apprGed preproduction-sample will b returned to the con- equipment meets all the requirements of this specification and th
11、e contract. Preproduction tests shall include environmental tests in accordance with the procedures of Specification MIL-T-5422 and interference tests in accordance with Specification MIL-z-6181. 4.2.4 sample shall be by the procuring activSty upon satisfactory completion of all tests. approval of t
12、he preproduction sample. ment prior to the approval of the preproduction sample is at the contractors Preproduction Approval - Approval of the preproduction No production equipments shall be delivered prior to the Prefabrication of production equip- 4.2.5 Production Equipents - Equipments supplied u
13、nder the con- tract shall in all respects, including design, construction, workmanship, performance and quality, be equivalent to the approved preproduction sample. Each equipment shall be capable of successfuly passing the same tests as imposed on the preproduction sample. above shall. constitute c
14、ause for rejection and for equipment already accepted by the government it shall be the obligation of the contractor to make necessary corrections as approved by the procuring activity. Ehidence of noncompliance with the 4.3 Production Sample Tests - When requested by the procuring activity, one equ
15、ipment shall be selected from the first 10 production equipents submitted for acceptance and sent at the contractors expense to a designated government laboratory for tests. This equipment shall be selected by the government inspector after the equipment has successfully passed all individual tests.
16、 for this test. The preproduction sample shall not be selected 4.3.1 Scope of Tests - This equipment may be subjected to any and all tests the procuring activity deems necessary to assure that the produc- _- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IH
17、S-,-,- MIL-R-240LLA 58 m 777770b 0152775 I m_L_( MIL-R-OJA (W) tion equipment is equivalent to the previously approved preproduction sample in design, construction, workmanship, performance and quality, and that it meets all applicable requirements. 4.3.2 Boduction Sample Approval - Approval of the
18、production sample shall be by the procuring activity upon satisfactory completion of all tests. this test shall be corrected by the contractor to the satisfaction of the procuring activity. tests shall be cause for deliveries of equipment under the contract to cease until proper corrective action is
19、 approved and accomplished. tive action shall also be accomplished on equipment previously accepted when requested by the procuring activity. Any design, material or performance defect made evident during Failure of the production sample to pass any of the Correc- 4.3.3 Reconditioning of Production
20、Test Sample - On completion of the production sample test the equipment shall be reworked by the con- tractor by replacing all wear or damaged items. contractor shall resubmit the equipment for acceptance. After reworking, the 4.4 Acceptance Tests - The contractor shall furnish all samples and shall
21、 be responsible for accomplishing the acceptance tests. inspection and testing shall be under the supervision of the government inspector. Contractors not having testing facilities satisfactory to the procuring activity shall engage the service of a commercial testing labor- atory acceptable to the
22、procuring activity. The contractor shall furnish test reports showing quantitateve results for all acceptance tests. Such reports shall be signed by an authorized representative of the contractor or laboratory? as applicable. the course of manufacture shall not be construed as a guarantee of the acc
23、eptance of the finished product. f ollaring: Ail Acceptance or approval of material during Acceptance tests shall consist of the (i) Individual Tests (2) Sampling Tests (3) Reliability Assurance Tests (4) Special Tests Individual Tests - Each equipment submitted for acceptance 4.4.1 shall be subject
24、ed to the individual tests. to detemnine compliance with the requirements of material workmanship, operational adequacy, and reliability. accepted shall have passed the following tests: These tests shall be adequate As a minimum, each equipment (1) Examination of Product (2) Operational Test (3) Man
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILR24011A1965RADARALTIMETERWARNINGSETANAPQ107ANAPQ107 雷达 高度表 警告 设备 PDF

链接地址:http://www.mydoc123.com/p-981196.html