NAVY MIL-G-23723 (2)-1967 GYROSCOPE RATE SWITCHING CN-495 AJB-3《CN-495 AJB-3速率开关陀螺》.pdf
《NAVY MIL-G-23723 (2)-1967 GYROSCOPE RATE SWITCHING CN-495 AJB-3《CN-495 AJB-3速率开关陀螺》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-G-23723 (2)-1967 GYROSCOPE RATE SWITCHING CN-495 AJB-3《CN-495 AJB-3速率开关陀螺》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-G-23723 (2) bb = 7777706 0132213 2 M 1 Aw 1967 . -. surrersedinn HILITARY SPECIFICATION Gyroscope, Rate Switching CN-495/AdB-3 This amendment forms a part of Military SpscUication MIL-0-23723(WEP) dated 15 January 1964 and has been approved by the Naval Air Systems Command, Departnent of the Nav
2、y. un particle size shall not exceed 8.8 Microns diameter in the medium.“ *Page 6, Paragraph 3 . 5 . 1 (1 ) : Delete “Three Phase“ and substitute “Single Phase“ *Page 6, paragraph 3.5.3: Delete Page 6: Add “3.5.6 Switchine: Mechanism - The switching mechanism shall contain a single pole double throw
3、 switch with solid plathum alloy contact points or equivalent. closed circuit shall open when a tup rate of 15 per minute or more is imposed on the Gyroscope. Amperes resistive load at 115 volts. The normally open circuit shall close and the normaily The contact rating shall be not less than 2 The c
4、ontact circuits shall be isolated from the Page 11, other circuitry in the gyroscope and from the case.“ Paragraph 4.4.2.2.1: Delete “Test for Helium“ t -2- Licensed by Information Handling ServicesM1L-C;-23723 (AS) AMENDMENT02 “4.4.3 Reliability Procedure - Reliability Assurance-Testing will Each e
5、quipment produce8 under be accomplished through a production burn-in. this contract shall be operated for one hundred-fifty (150) operating hours burn-in, and the test data (operating hours and failures) shall be compared to the accept/reject criteria of Test Plan V of MIL-STD-781. equipment shall n
6、ot be held up to await a decision under the Test Plan. In event an accept decision is reached, the test duration of each equip- ment shall be reduced to 100 operating hours. of time from the 100 hour burn-in, results in the second accept ddcision, the test duration on each equipment shall be reduced
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILG2372321967GYROSCOPERATESWITCHINGCN495AJB3CN495AJB3 速率 开关 陀螺 PDF

链接地址:http://www.mydoc123.com/p-979322.html