NAVY MIL-DTL-81530 B-2000 IGNITION ELEMENT ELECTRIC MARK 11 MOD 0《0系数11型电气点火元件》.pdf
《NAVY MIL-DTL-81530 B-2000 IGNITION ELEMENT ELECTRIC MARK 11 MOD 0《0系数11型电气点火元件》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-DTL-81530 B-2000 IGNITION ELEMENT ELECTRIC MARK 11 MOD 0《0系数11型电气点火元件》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、INCH-POUND MIL-DTL-8 1530B(OS) 24 August 2000 SUPERSEDING MIL-1-8 1530A(AS) 6 May 1987 DETAIL SPECIFICATION IGNITION ELEMENT, ELECTRIC, MARK 11 MOD O This specijcation is approved for use by the Naval Sea Systems Command, Department of the Navy, and is available for use by all Departments and Agenci
2、es of the Department of Defense. 1. SCOPE 1.1 Scope. This specification establishes requirements for the Electric Ignition Element Mark 11 Mod O (see 6.1). 2. Applicable Documents. 2.1 General. The documents listed in this section are specified in sections 3 and 4 of this specification. This section
3、 does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements documents specifie
4、d in sections 3 and 4 of this specification, whether or not they are listed. 2.2 Government documents. 2.2.1 Specifications and standards. The following specifications and standards form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents
5、 are those listed in the Department of Defense Index of Specifications and Standards (DODISS) and supplement thereto, cited in the solicitation (see 6.2). SPECIFICATIONS DEPARTMENT OF DEFENSE MIL-1-23 6 5 9 Initiators, Electric, Design and Evaluation of Beneficial comments (recommendations, addition
6、s, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, Indian Head Division, Naval Surface Warfare Center, Standardization Team (Code 840M), 101 Strauss Avenue, Indian Head, MD 20640-5035 by using the Standardization Document Improvemen
7、t Proposal D Form 1426) appearing at the end of this document, or by sending a letter. AMSC NIA FSC 1377 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-STANDARDS DEPAR
8、TMENT OF DEFENSE DOD-STD-2 1 O 1 Classification of Characteristics (Unless otherwise indicated, copies of federal and Department of Defense specifications and standards are available from Standardization Documents Order Desk, Bldg. 4D, 700 Robbins Avenue, Philadelphia, PA 191 11-5094.) 2.2.2 Other G
9、overnment documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation. DRAWINGS Naval Air Systems Command (Code Iden
10、t 30003) DL546659 Ignition Element, Electric, Mark 11 Mod O DL6 13457 Firing Test Fixture, Ignition Element (Output and Electrical Functioning) 838AS100 Propellant, Double Base (Application for copies should be addressed to Commander, Naval Surface Warfare Center, Indian Head Division, 101 Strauss A
11、venue, Data Control Branch (Code 8410), Indian Head, MD 20640-5035.) 2.3 Non-Government publications and drawings. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of the documents which are DOD adopted are those listed in th
12、e issue of the DODISS cited in solicitation. Unless otherwise specified, the issues of documents not listed in the DODISS are the issues of the documents cited in the solicitation (see 6.2). AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)/AMERICAN SOCIETY FOR QUALITY CONTROL (ASQC) ASQC 21.4 Sampling P
13、rocedures and Tables for Inspection by Attributes (DoD adopted) (Application for copies should be addressed to the American Society for Quality Control, PO Box 3005, 61 1 E. Wisconsin Ave., Milwaukee, WI 53201-4606) 2.4 Order of precedence. In the event of a conflict between the text of this documen
14、t and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-
15、,-,-MIL-DTL-81530B(OS) 3. REQUIREMENTS 3.1 General. The Mk 11 Mod O Ignition Element covered by this specification shall be manufactured in accordance with DL 546659 and all documents listed thereon. 3.1.1 First article. When specified in the contract or purchase order (see 6.2), a sample shall be s
16、ubjected to the first article inspection (see 4.2.1 and 6.4). Unless otherwise specified by the procuring activity, a first article sample of 146 ignition elements shall be manufactured using the same methods and procedures proposed for the production lot. The sample shall be tested as specified in
17、4.3.2 and is the purpose of determining that the contractor, prior to starting production, is capable of producing items which comply with the technical requirements of the contract. When the ignition element is being manufactured as an integral part of a procured cartridge, the first article and pr
18、oduction lot testing of the Mk 11 is not required. 3.2 Material. All materials used in the manufacture of the ignition elements shall conform strictly with the specifications referred to on the respective Bureau of Naval Weapons drawings unless specific approval in writing covering a departure there
19、fi-om has been obtained fi-om the Naval Air Systems Command prior to manufacture. When alternate materials or methods of manufacture are specified on the drawings, the bidders selections shall be clearly stated in the proposal. 3.3 Primary Components. For the purpose of this specification the loaded
20、 spacer charge, Drawing 2302165, is defined as a primary component. See 4.3.3. 3.4 Cleaning and condition of parts. All parts shall be fi-ee of chips, dirt, grease, rust and all other foreign materials. There shall be no burrs nor other imperfections in manufacture which would harmfully affect eithe
21、r the assembly or the functioning of the product. The cleaning methods which are used shall not be injurious to any of the parts nor shall the parts be contaminated by the cleaning agents which are used. 3.5 Explosive components, volatiles. The primer composition, Drawing 25 19878, shall have a maxi
22、mum moisture content of 0.5% at time of loading as determined in 4.6.1. After consolidation of the primer composition in the loaded spacer, Drawing 2302165, the loaded spacer shall be dried at +100“F to +120“F for a minimum of 16 hours. After removal of the units fi-om the drying equipment, if more
23、than 4 hours elapse before their assembly into ignition elements, the units shall be dried at +100“F to +120“F for a minimum of 4 hours immediately prior to their being assembled into ignition elements. 3.6 Insulation resistance. Prior to assembly of bridgewires, the insulation resistance shall not
24、be less than 50 megohms at a relative humidity of less than 80 percent when measured in accordance with 4.6.2. 3.7 Bridgewire (Soldering). 3.7.1 Bridgewire assembly, decontamination. All assemblies shall be cleaned and inspected as stated in 4.6.3. 3.8 Igniter assembly, loading. The consistency of t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILDTL81530B2000IGNITIONELEMENTELECTRICMARK11MOD00 系数 11 电气 点火 元件 PDF

链接地址:http://www.mydoc123.com/p-978883.html