NAVY MIL-C-60643 A-1992 CARTRIDGE IMPULSE M127 ASSEMBLY《M127型炮筒推动装置》.pdf
《NAVY MIL-C-60643 A-1992 CARTRIDGE IMPULSE M127 ASSEMBLY《M127型炮筒推动装置》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-60643 A-1992 CARTRIDGE IMPULSE M127 ASSEMBLY《M127型炮筒推动装置》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-bOb43A 13 9999906 0575778 7 W INCH-POUND MIL-C-60643A 23 June 1992 SUPERSEDING 10 June 1968 MIL-C-60643(MU) MILITARY SPECIFICATION CARTRIDGE, IMPULSE, M127 ASSEMBLY mis specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This spec
2、ification covers the requirements for the M127 Impulse Cartridge (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. The following specifications and standards form a part of this document to the extent specified herein. Unless otherwise specified, the is
3、sues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplements thereto, cited in the solicitation (see 6.2). SPECIFICATIONS MILITARY MIL-A-2550 Ammunition, General Specification For MIL-A-8625 Anodic Coatings, For Alu
4、minum And Aluminum Alloy AMSC N/A FSC 1377 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Beneficial comments (recommendations, additions, deletions) and any pertinent however, one primary component production lot may be used in more than one cartridge production l
5、ot. 3.4.1.1 Primer. The primer shall conform to the applicable drawing and reference specification. Prior to assembly into a cartridge, the primer shall be visually examined in accordance with 4.6.2 and radiographically examined for defects as specified in 4.7.1. 3.4.2 Hardness. The hardness of each
6、 component part shall be in accordance with the applicable drawing (see 4.7.2). 3.4.3 Protective finish. The finish of each component part shall be in accordance with MIL-A-8625 and the applicable drawing (see 4.7.3). 3.5 Assembly. 3.5.1 Radiographic examination. Each cartridge assembly shall be rad
7、iographically examined for defects (see 4.7.4). 3.5.2 Airtightness. Each assembled cartridge shall exhibit no air leakage greater than 1 x lo4 standard cubic centimeters of air per second at a 14 psia pressure differential (see 4.7.5). 3.5.3 Vibration. The assembled cartridge shall withstand vibrati
8、on as prescribed in MIL-STD-8 10, Method 514.3, Test Procedure I, Test Condition 1-3.2.5 without evidence of any disintegration of the primer, propellant, or igniter, or derangement of any component (see 4.7.7 and 6.2). 3 Licensed by Information Handling ServicesMIL-C-bOb43A 13 = 99999Ob 0575783 7 M
9、IL-C-60643A Temperature (OF) - 60 to - 70 3.6 Functional requirements. 3.6.1 Primer sensitivity. The primer shall fire when drop tested at an energy level of 60 inch-ounces in a sectioned cartridge void of igniter and propellant charge (see 4.7.8.1). 3.6.2 Cartridge performance. 3.6.2.1 Misfires. Th
10、e cartridge shall not fail to fire. 3.6.2.2 Ballistics. The cartridge, when tested in closed bomb, Drawing 5185086, shall comply with the requirements of table I. TABLE I. Ballistic requirements. Maximum pressure (psig) Igition Delay Time, Time to P-max, Lower Upper max (ms) max (ms) 3285 none 65 11
11、8 65 to 75 195 to 205 3285 none 65 118 3285 none 65 118 3.7 Workmanship. Cartridges shall be free of cracks, splits, or other defects which might prevent proper mating with connecting parts or proper functioning of the device. 3.7.1 Metal defects. All components shall be free from cracks, splits, co
12、ld shuts, inclusions, porosity, or any similar defect. 3.7.2 Burr. No part shall have a burr which might interfere with the assembly or function of the item or which might be injurious to personnel handling the item. 3.7.3 Foreign matter. No part or assembly shall contain chips, dirt, grease, rust,
13、corrosion, or other foreign matter. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements (examinations and tests) as specified herein. Except a
14、s otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set
15、forth in this specification where such inspections are deemed necessary to ensure supplies and services conform to prescribed requirements (see 6.2). 4 Licensed by Information Handling ServicesMIL-C-bOb43A 13 = 99999Ob 0575782 9 MIL-C-60643A 4.1.1 Responsibility for compliance. All items shall meet
16、ail requirements of sections 3 and 5. The inspection set forth in this specification shall become a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of ensuring
17、 that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. Sampling inspection, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements; however, this does not authorize submission of known d
18、efective material, either indicated or actual, nor does it commit the Government to acceptance of defective material. 4.1.2 Quality assurance terms and definitions. Reference shall be made to MIL-STD-109 to define the quality assurance terms used. 4.1.3 Inspections. Inspections shall be in accordanc
19、e with MIL-A-2550 and MIL-STD-453. 4.2 Classification of inspections. The inspection requirements specified herein are classified as follows: a. First article inspection (see 4.4) b. Quality conformance inspection (see 4.5) 4.3 Inspection conditions. Unless otherwise specified in the contract or pur
20、chase order (see 6.2), inspection conditions shall be as follows: e a. Temperature: Room ambient 20“ to 25“ C (68“ to 77“ F) b. Altitude: Sea level c. Humidity: 50 percent relative, maximum d. Atmospheric: 14.7 psia 4.4 First article inspection. At the beginning of regular production, the contractor
21、 shall submit a first article sample to a Government approved facility for evaluation. The sample shall consist of 21 assembled cartridges for ballistics testing including 12 for vibration tests (to be selected from ballistic samples), 5 assembled cartridges for sealant tests, 10 sets of unassembled
22、 components for dimensional and visual examination, and a quantity in accordance with 4.4.2, Le., cartridges assembled without the igniter and propellant charge for primer sensitivity test. The first article sample shall be manufactured using the same materials, equipment, processes, and procedures
23、as used in regular production. All parts and materiais, including packaging and packing, shall be the same as used for regular production and shall be obtained from the same source of supply. When it becomes necessary to make a change in either the primer, propellant, or igniter lot after initial pr
24、oduction, 12 assembled cartridges from the first production lot thereafter shall be tested in accordance with 4.7.7. The Government reserves the right to require new first article samples until such time as an acceptable sample is submitted (see 6.3). 4.4.1 Examination, tests, and facility. After pr
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC60643A1992CARTRIDGEIMPULSEM127ASSEMBLYM127 炮筒 推动 装置 PDF

链接地址:http://www.mydoc123.com/p-977899.html