NAVY MIL-A-23404 A-1982 ADAPTOR KIT MARINE MARKER MK 34 MOD 0《MK 34 MOD 0海洋标记适配器套件》.pdf
《NAVY MIL-A-23404 A-1982 ADAPTOR KIT MARINE MARKER MK 34 MOD 0《MK 34 MOD 0海洋标记适配器套件》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-A-23404 A-1982 ADAPTOR KIT MARINE MARKER MK 34 MOD 0《MK 34 MOD 0海洋标记适配器套件》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-A-23404A 13 999990b 0303345 9 H - -_ - - _- - - - MILiA-23404A (AS) 2 December 1982 - MI L-A-23404 ( Wep ) 25 July 1962 keneficial comnents (recommendations, additions, deletions) and any pert%nt data which may be of use in improving this document should be addressed to: Engineering Specificatio
2、ns and Standards Department (Code 93), Naval Air Engi neeri ng Center, Lakehurst , NJ 08733 by usi ng the sel f-addressed Standardization Document Improvement Proposal (DD Form 1426) appeari ng at the ,end of this document or by letter. MI L I TARY SP EC I FI CAT ION ADAPTER KIT, MARINE MARKER MK 34
3、 MOD O This specification is approved for use by the Naval Air Systems Command, Department of the Navy, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 SCO e. This specification establishes the requirements for the manu + acture and inspection of t
4、he Adapter Kit, Marine Marker, MK 34, Mod O. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications, standards, and handbooks. Unless otherwise specified, the folMdbooks of the issue listed in that issue of the Department of Defense Index of Specifications and Standards (DODISS) spec
5、ified in the solicitation form a part of this specification to the extent specified herein. STANDARDS MI L I TARY MI L-STD-105 MI L-STO-129 MIL-STD-1168 Sampling Procedures and Tables for Inspection by Attri bu te s. Marki ng for Shi pment and Storage. Arrmuni tion Lot Numberi ng. THIS DOCUMENT CONT
6、AINS &L. PAGES. - - - - FSC 1370 Licensed by Information Handling ServicesflIL-A-2340qA 13 m 779770b 0303346 O m 2.1.2 Other Government documents, drawings and publications. The following other Government documents, drawings, and publications form a part of this specification to the extent specified
7、 herein. DRANI NGS NAVAL AIR SYSTEMS COMMAFID L8282828 LD28283 O Adapter Kit, Marine Marker, MK 34 Mod O. BOX, Shipping and Storage, Marine Adapter Kit. SA2 52291 3 Assembly, Test Fixture, MK 34 Kit. 1331 9 91 Package, Shi ppi ng , Storage 121 2853 Adapter Ki t. 1212851 Leaf Spring Assembly. 112961
8、8 . U Pin. (Copies of specifications, standards, handbooks, drawings, and pub1 ications required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting officer. ) 2.1.3 Order of precedence. this specificat
9、ion and the references cited herein, the text of this specification shall take precedence. In the event of a conflict between the text of 3. REQUIREENTS 3.1 First article. When specified, a sample shall be subjected to first article inspection (see 4.3 and 6.3). 3.2 Material, Unless otherwise specif
10、ied in the contract, or purchase order, al 1 material s and purchased parts entering into the fi na1 assembly of the adapter shall conform strictly to the detail requirements indicated on the drawings and specifications listed on LD 282828 or as specified herein. 3.3. Design and construction. adapte
11、r kit (drawing lrlz853) shall be of the design, construction and physical dimensions specified in LD282828. The adapter kit shall consist of a cadmium plated steel mtainer nominally three inches in diameter and 2-1/16 inches deep. A coil spring, approximately two inches in diameter, shall be secured
12、 in the bottom of the retainer. A cadmium plated steel spring assembly shall have a plug seal at each end and shall be attached to the coil spring with a wire. The assemblies and component parts of the 3 2 Licensed by Information Handling ServicesMI L-A-23404A (AS ) 3.4 Performance characteristics.
13、3.4.1 Sealing. The adapter kit shall withstand an external hydrostatic pressur- psig minimum to 6.0 psig maximum for a minimum period of 30 seconds without leakage into the fuze simulator cavity when tested as specified in 4.5.1. 3.4.2 Leaf spri ng embri ttlement. The 1 eaf spri ng (drawing 121 2851
14、 ) shall not crack or break when tested as specified in 4.5.2. 3.5 Workmanship, The product, in all stages of production, shall be processed under such inspection control as to assure uni formi ty in qual i ty. There shall be no imperfections or deviations from the specification affecting the functi
15、oning or assembly of the product. Where applicable, al 1 material shall be free of pits, corrosion, cracks, spalls, rough edges, etc. All components shall be free of chips, dirt, grit, or other foreign material. The cleaning methods used shall not be injurious to any of the parts nor shall the parts
16、 be contaminated by the cleaning agents employed. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILA23404A1982ADAPTORKITMARINEMARKERMK34MOD0MK34MOD0 海洋 标记 适配器 套件 PDF

链接地址:http://www.mydoc123.com/p-976886.html