MSFC NASA MWI 8730 3 REV E-2009 MSFC MATERIAL REVIEW SYSTEM《马歇尔太空飞行中心材料审查系统》.pdf
《MSFC NASA MWI 8730 3 REV E-2009 MSFC MATERIAL REVIEW SYSTEM《马歇尔太空飞行中心材料审查系统》.pdf》由会员分享,可在线阅读,更多相关《MSFC NASA MWI 8730 3 REV E-2009 MSFC MATERIAL REVIEW SYSTEM《马歇尔太空飞行中心材料审查系统》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE MWI 8730.3 REVISION E EFFECTIVE DATE: March 23, 2009 EXPIRATION DATE: March 23, 2014 MARSHALL WORK INSTRUCTION QD01 MSFC MATERIAL REVIEW SYSTEM Provided by IHSNot fo
2、r ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction QD01 MSFC Material Review System MWI 8730.3 Revision: E Date: March 23, 2009 Page 2 of 7 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE C
3、ORRECT VERSION BEFORE USE DOCUMENT HISTORY LOG Status (Baseline/ Revision/ Canceled) Document Revision Effective Date Description Baseline 5/14/99 Document converted from MSFC-P13.1-C01 to a Directive. Previous history retained in system as part of canceled or superseded ISO Document files. Revision
4、 A 8/16/99 Changed organizational references to reflect MSFCs reorganization. Added definitions for critical, major, and minor. Clarified requirements for Project MRBs to document membership in the Project Quality Plan. Replaced reference to MSFC-STD-555 with reference to MWI 8040.3. Changed paragra
5、ph 6.1.1.d to indicate that the responsible design engineer is to be contacted if a discrepancy disposition requires a design change. In paragraph 6.1.2, deleted the reference to the specific paragraph in MWI 5100.1. Revision B 5/9/03 Document updated to be in compliance with AS9100 and current prac
6、tices. Updated the Master List URL in the footer. Revision C 10/15/2004 Revised to bring document in compliance with the HQ Rules Review Action (CAITS: 04-DA01-0387). Changes were also made to reflect S however, the chairperson and alternate chairperson shall be named by S&MA. 6.2 Responsibilities.
7、6.2.1 Safety and Mission Assurance Directorate. The S&MA Directorate shall: 6.2.1.1 Assure overall and timely implementation of the material review system. 6.2.1.2 Establish Centerwide MRB. Provide chairperson and alternate chairpersons for Centerwide and Project MRBs and maintain a listing of the c
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- MSFCNASAMWI87303REVE2009MSFCMATERIALREVIEWSYSTEM 马歇尔 太空飞行 中心 材料 审查 系统 PDF

链接地址:http://www.mydoc123.com/p-822920.html