GMW GMW16602-2011 Sunroof Drain Hose Environmental Testing Issue 1 English《遮阳篷排水管的环境试验 第1次出版(英文版本)》.pdf
《GMW GMW16602-2011 Sunroof Drain Hose Environmental Testing Issue 1 English《遮阳篷排水管的环境试验 第1次出版(英文版本)》.pdf》由会员分享,可在线阅读,更多相关《GMW GMW16602-2011 Sunroof Drain Hose Environmental Testing Issue 1 English《遮阳篷排水管的环境试验 第1次出版(英文版本)》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、 WORLDWIDE ENGINEERING STANDARDS Test Procedure GMW16602 Sunroof Drain Hose Environmental Testing Copyright 2011 General Motors Company All Rights Reserved September 2011 Originating Department: North American Engineering Standards Page 1 of 8 1 Scope Note: Nothing in this standard supercedes applic
2、able laws and regulations. Note: In the event of conflict between the English and domestic language, the English language shall take precedence. 1.1 Purpose. Evaluation of the sunroof drain hose performance under environmental conditions. 1.2 Foreword. This document is intended to test performance r
3、equirements of a sunroof module drain hose system under environmental conditions. 1.3 Applicability. This test procedure applies to all passenger vehicles with a sunroof module requiring drain hoses for water management. This applies to all sunroof systems as defined in the Vehicle Technical Specifi
4、cations (VTS) Subsystem Technical Specification (SSTS). 2 References Note: Only the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. None 2.2 GM Standards/Specifications. GMW3600 3 Resources 3.1 Facilities. The test facilities shall be accre
5、dited to ISO/IEC standards or by the International Laboratory Accreditation Cooperation. However, all measuring variables as specified in this specification shall be determined correctly with respect to its physical definition. 3.1.1 Calibration. The test facilities and equipment shall be in good wo
6、rking order and shall have a valid calibration label. 3.1.2 Alternatives. Alternative test facilities and equipment may also be used. However, all measuring variables as specified in this specification shall be determined correctly with respect to its physical definition. 3.2 Equipment. 3.2.1 Test f
7、ixture (representative of interfacing components/body) or vehicle body. 3.2.2 Hose routing in the body or fixture must be representative of the installed hose design position. 3.2.3 Environmental chamber with the following requirements: x Relative Humidity 10% to 95% required x Hot Tmax = 90 C/Cold
8、Tmin = -30 C x Digital Camera x Permanent Marker x Test Samples x Tension/compression gauge 3.3 Test Vehicle/Test Piece. Test samples shall be of production intent design and material for design validation (DV); or, production intent design and materials manufactured with production processes (home
9、line) for product validation (PV). Any changes to the components or material, e.g., design, fit, form, function, Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE E
10、NGINEERING STANDARDS GMW16602 Copyright 2011 General Motors Company All Rights Reserved September 2011 Page 2 of 8 properties, manufacturing process, and/or location of manufacture require revalidation. GM shall approve validation methods for product/process changes before the supplier is committed
11、to the change. Refer to GMW3600. 3.4 Test Time. Calendar time: 10 days Test hours: 72 hours Coordination hours: 8 hours 3.5 Test Required Information. Requirements from the SSTS or respective specifications are necessary in order to execute test methods in this document (Table A1 and Table A2 for a
12、list of variables required). Equipment and test sample detail is included in Section 4 of this document. 3.6 Personnel/Skills. The test facility shall have sufficient personnel having the necessary education, training, technical knowledge, and experience for performing the required tests. 4 Procedur
13、e 4.1 Preparation. 4.1.1 Fixtures. Unless otherwise specified, mount the test sample on a fixture of welded construction designed to place the test sample in its vehicle orientation. Mount with the production attachment strategy or, equivalent. Locating features and body metal interface must be repr
14、esented in the fixture design. Position the fixture retention points to the test base such that the fixture can be removed without removing the sunroof. The GM Validation Engineer and GM Designing Engineer shall approve the design. 4.1.2 Test Samples. All test samples shall be design intent and meet
15、 all functional and dimensional requirements. Samples must have all design intent components that might affect performance. These include clips, grommets, connectors, hoses, sunroof spouts (or representation), etc. Preliminary tests may need to be made to evaluate whether a particular component may
16、be worst case, e.g., connectors. The GM Validation Engineer and GM Designing Engineer shall approve any exceptions prior to the start of testing. 4.2 Conditions. Conditions are according to the relevant test procedure. All conditions specified shall be targeted toward the specified value with any gi
17、ven tolerance () used to compensate for variation. During testing, conditions specified shall not be adjusted within the tolerance unless it is to maintain the particular test condition within the specified tolerance. If such an adjustment is made, it shall be approved by the applicable GM engineer
18、prior to the start of any testing. Unless otherwise specified, perform tests in the as received condition without special preconditioning. 4.2.1 Environmental Conditions. 4.2.1.1 Temperature and Voltage Definitions. Symbol definitions required for test methods contained in this procedure are listed
19、in Table A1. Actual requirement values for the symbols shall be obtained from the Subsystem Technical Specification (SSTS) or the respective specification and recorded on Table A3. If not otherwise specified, tests shall be performed at Troom = 23 3 C. If various temperature ranges for the tests are
20、 specified, the procedure shall be constructed, if not otherwise specified, in a way that all tests shall be performed first at Troom = 23 3 C, then at high temperature and lastly at low temperature. If not specified, the test parameter for relative humidity (RH) shall be set at 50 5% and voltage se
21、t to Unom. 4.2.1.2 System Performance Conditions. Symbol definitions required for test methods contained in this procedure are listed in Table A2. Actual requirement values for the symbols shall be obtained from the SSTS or the respective specification and recorded on Table A3. 4.2.2 Test Conditions
22、. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on component drawings, test certificates, reports, etc. 4.3 Instructions. The drain hoses are to be installed in the fixture/body in the design position. The insertion force should b
23、e recorded at this point. Also, three samples should be run to measure the retention force of the connector. Once installed the drain hoses are to be marked with a permanent marker. These marks are to be added to all points that are being inspected. Reference points should be established before test
24、ing to identify growth or shrinkage of the hose under environmental conditions. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16602 Cop
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW166022011SUNROOFDRAINHOSEENVIRONMENTALTESTINGISSUE1ENGLISH 遮阳篷 排水管 环境 试验 出版 英文 版本 PDF

链接地址:http://www.mydoc123.com/p-757805.html