GMW GMW16568-2011 Adhesive Primer Time Link-Up Test Stationary Glass Issue 1 English [Replaced GMNA GM9520P GMNA GM9520P]《固定玻璃的粘合底漆时间连接试验 第1次出版(英文版本)[代替 GMNA GM9520P GMNA GM9520P]》.pdf
《GMW GMW16568-2011 Adhesive Primer Time Link-Up Test Stationary Glass Issue 1 English [Replaced GMNA GM9520P GMNA GM9520P]《固定玻璃的粘合底漆时间连接试验 第1次出版(英文版本)[代替 GMNA GM9520P GMNA GM9520P]》.pdf》由会员分享,可在线阅读,更多相关《GMW GMW16568-2011 Adhesive Primer Time Link-Up Test Stationary Glass Issue 1 English [Replaced GMNA GM9520P GMNA GM9520P]《固定玻璃的粘合底漆时间连接试验 第1次出版(英文版本)[代替 GMNA GM9520P GMNA GM9520P]》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、 WORLDWIDE ENGINEERING STANDARDS Material Specification GMW16568 Adhesive Primer Time Link-Up Test, Stationary Glass Copyright 2011 General Motors Company All Rights Reserved August 2011 Originating Department: North American Engineering Standards Page 1 of 3 1 Scope This standard describes a test p
2、rocedure to determine the length of time necessary for a specific primer or adhesion promoter to link-up and/or cure to specific substrates. 1.1 Material Description. Not applicable. 1.2 Symbols. Not applicable. 1.3 Typical Applications. Primers intended to be tested under this procedure will genera
3、lly be used for, but restricted to, glass bonding adhesive system applications, e.g., Body Primer on painted metal, Glass Primer on glass or Ceramic Enamel on glass, polyvinyl chloride (PVC) Primer on PVC. Primers and substrates may also pertain to other trim bonding such as metal and plastic trim p
4、anels, appliques and moldings. 1.4 Remarks. 1.4.1 Safety. This method may involve hazardous materials, operations and equipment. This method does not intend to address all the safety problems associated with its use. It is the responsibility of the user of this method to establish appropriate safety
5、 and health practices and determine the applicability of regulatory limitations prior to use. 2 References Note: Only the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. None 2.2 GM Standards/Specifications. GMW3059 2.3 Additional Reference
6、s. TMC003 Material Safety Data Sheet guidance documents 3 Requirements 3.1 Requirements on Test Specimens. Not applicable. 3.2 Equipment Required. 3.2.1 Test substrate based upon candidate primer. All test panel dimensions and materials are to be defined in the associated report. 3.2.2 Appropriate c
7、andidate primer. 3.2.3 Draw down bar capable of applying a 125 m wet film thickness. 3.2.4 Razor knife. 3.2.5 Roll of 25 mm wide tape (Permacel No. 99 or equivalent). 3.2.6 Clock or suitable timer. 3.3 Test Procedure. 3.3.1 Apply a 125 m 60 mm 250 mm wet film of primer to the center of the painted t
8、est panel. Use a draw down bar capable of applying a 125 m wet film thickness. 3.3.2 After 5 minutes at 23 2 C and 30% relative humidity (RH) (record actual temperature and relative humidity), cut an X into the primer film with the razor knife. Ensure that the razor knife also penetrates the test su
9、bstrate under the primer film. The area of the X should fill a rectangle of approximately 25 60 mm2. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING S
10、TANDARDS GMW16568 Copyright 2011 General Motors Company All Rights Reserved August 2011 Page 2 of 3 3.3.3 Apply a strip of 25 mm wide tape (Permacel No. 99 or equivalent) transversely to the primer film directly over the X scribe. Allow an additional 75 to 100 mm of tape on one side to provide a loo
11、se tail to grasp when removing the tape. Use firm finger pressure to be slicked down/wet-out tape over the X in order to achieve intimate contact with the primer film. 3.3.4 With the test substrate secure, immediately pull the tape from the panel at an approximate 90 angle with a firm, jerking motio
12、n. Record the amount of primer that is pulled off the panel on the tape. The amount removed should be approximated based upon the relation to the rectangular area created around the X. Report the amount as a percent (%) relative to this rectangular area. 3.3.5 The above procedure (3.3.2 through 3.3.
13、4) shall be repeated at 15 minute intervals from time 0 until the primer no longer peels from the test substrate. The time it takes for the primer to no longer be peeled from the test substrate is recorded and reported as the link-up time. 3.4 Report. Report the following data: a. Candidate primer m
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW165682011ADHESIVEPRIMERTIMELINKUPTESTSTATIONARYGLASSISSUE1ENGLISHREPLACEDGMNAGM9520PGMNAGM9520P

链接地址:http://www.mydoc123.com/p-757787.html