GMKOREA EDS-T-5714-2008 METHOD OF TEST FOR ENGINE ROOM FUSE & RELAY BOX (CONVENTIONAL TYPE).pdf
《GMKOREA EDS-T-5714-2008 METHOD OF TEST FOR ENGINE ROOM FUSE & RELAY BOX (CONVENTIONAL TYPE).pdf》由会员分享,可在线阅读,更多相关《GMKOREA EDS-T-5714-2008 METHOD OF TEST FOR ENGINE ROOM FUSE & RELAY BOX (CONVENTIONAL TYPE).pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、GM DAEWOO Auto & Technology EDS Engineering, GM DAEWOO Auto & Technology Standards METHOD OF TEST FOR ENGINE ROOM FUSE & RELAY BOX (CONVENTIONAL TYPE) Do Not Use on New Programs. Being Replaced by GMW3172 EDS-T-5714 ISSUED DATE: 2000. 05. 18 REVISED DATE: 2008. 10. 21 VERSION: 3 (Superceded) EDS-T-5
2、714METHOD OF TEST FOR ENGINE ROOM FUSE & RELAY BOX (CONVENTIONAL TYPE) PAGE: 1/9 ISSUED DATE: 2000. 05. 18 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology Note: This standard may be applied only for current project (incl. T255 Program). It is Superceded for all future projects and
3、replaced by GMW3172. 1. PURPOSE This standard aims at specifying the method of verifying whether the conventional box type fuse and relay box (hereinafter called “fuse box”) in the engine room used for vehicles manufactured by GMDAT is appropriate. 2. SCOPE This standard applies to verifying appropr
4、iateness of the fuse box at new model development or change of the fuse box for the production models. 3. TEST EQUIPMENT 3.1. Power supply - DC 24V/200A 3.2. Oscilloscope 3.3. Recorder 3.4. Electric load 3.5. Digital multimeter 3.6. Tension tester 3.7. Thermostatic chamber 3.8. Salt spray 3.9. Verni
5、er calipers, projector 4. TEST ITEMS 4.1. Basic performance test 4.1.1. Appearance check (1) Test method: Visual inspection (2) Evaluation standard: No deformation, flaws affecting commercial value, dents, shrinkage, weld run marks, discoloration. 4.1.2. Outer dimensions (1) Test method: Measure dim
6、ensions of each portion with vernier calipers or projector. EDS-T-5714METHOD OF TEST FOR ENGINE ROOM FUSE & RELAY BOX (CONVENTIONAL TYPE) PAGE: 2/9 ISSUED DATE: 2000. 05. 18 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology (2) Evaluation standard: To meet drawing requirements 4.1.3.
7、 Abnormal noise (1) Test method 1) Shake right/left with hands 2) Perform test after inserting the connector with a lead wire and the spare fuse connected. (2) Evaluation standard 1) No abnormal noise in the box or loosening. 2) No harmful noise between the box and cap. 4.1.4. Voltage drop (1) Test
8、method 1) With the designated components (harness, relay, fuse) assembled to the fuse box, apply a current of 1A to the individual circuit and measure the voltage drop. The measuring point is 100mm from the cable tip. In measuring, the voltage drop in the fuse and cable is excluded. 2) Measuring poi
9、nt (See Fig 1) (2) Evaluation standard: Voltage drop, which varies according to the vehicle model and fuse box type, shall be specified in the drawing. In test, the value specified in the drawing shall be followed. Unless specified in the drawing, it shall not be larger than 3mV/A for each connected
10、 contact before durability test and not be larger than 10mV/A after durability test. 64&$“#-&5&3.*/“-N7“NN4.1.5. Temperature change (1) Test method 1) After installing the cable and fuse to the fuse box, apply current equivalent to the actual load. 2) Record the measured temperature minus the ambien
11、t temperature when the temperature of each conducting part has been stabilized. EDS-T-5714METHOD OF TEST FOR ENGINE ROOM FUSE & RELAY BOX (CONVENTIONAL TYPE) PAGE: 3/9 ISSUED DATE: 2000. 05. 18 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology 3) No. of measuring points shall not be
12、less than 10 and their positions shall be selected from where the preliminary test temperature was high. The measuring points shall be selected following an agreement among related departments prior to test. 4) The ambient temperature of engine room components shall basically be 90 and components sh
13、all be attached in the vehicle condition. 5) In temperature measuring, attach the thermocouple for temperature measuring to the point. (by soldering) 6) The thermocouple shall be attached around the cathode connector neck (See Fig2) and separately agreed upon when required. 7) Change of measuringpoi
14、nts and the actual loading conditions shall be agreed upon among related departments prior to test. The test is conducted under the changed conditions. (2) Evaluation standard 1) Temperature rise : Max 55 2) No deformation of the fuse box. 3) Voltage drop : To meet 4.1.4.(2). .&“463*/(10*/55&3.*/“-4
15、#-0864&-*/-“%&64&3&-“:$“#-&5&3.*/“-.&“463*/(10*/54.2. Mechanical performance test 4.2.1. Fuse insertion force (1) Test method: After aligning the fuse and its insertion part on a straight line, fix the fuse to the tension tester, and insert it to the terminal 5 times at a speed of 20200X per minut
16、e. The result of each measurement shall meet the evaluation standard. (2) Evaluation standard 1) Mini/auto fuse: Max 9.2Kgf, maxi/slow blow fuse: Max 18.4Kgf. 2) When the fuse other than these are used, its insertion force shall be separately specified on the drawing and shall be met in test. EDS-T-
17、5714METHOD OF TEST FOR ENGINE ROOM FUSE & RELAY BOX (CONVENTIONAL TYPE) PAGE: 4/9 ISSUED DATE: 2000. 05. 18 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology 4.2.2. Fuse detachment force (1) Test method: With the fuse and its insertion part combined, fix the fuse to the tension teste
18、r, and pull it at a speed of 20200X /min. Measure the force 5 times when the terminal separates from the box. The result of each measurement shall meet the evaluation standard. (2) Evaluation standard 1) Vertical: 1.5Kgf 8Kgf 2) 30inclination: No separation of the terminal at 8Kgf. 4.2.3. Box fixing
19、 part strength (1) Test method: Immediately after taking the fuse box out of thermostatic chamber following exposure to 03 for 12 hours, evaluate as follows: 1) Formally fasten with a fastener. 2) Fasten the bolt or nut in the following conditions: - Bolt, nut : M6 - Fastening torque : M6 : 46 N 3)
20、Under the set conditions, pull it with a force of 10Kgf in the direction perpendicular to the fixing part. 4) The withstanding force of the mounting hole in the vehicle condition shall be MIN 6N. 5) In the event of any changes in the size of bolts and nuts and fastening torque stated in clause 2), t
21、he size of bolts and nuts shall be specified in the drawing, which shall be followed in test. (2) Evaluation standard: No damage 4.2.4. Relay insertion force/ detachment force (1) Test method: After aligning the relay and its insertion part on a straight line, fix the relay to the tension tester, an
22、d insert it to the terminal 5 times at a speed of 20200X per minute. The result of each measurement shall meet the evaluation standard. (2) Evaluation standard : 1) 280 micro relay : insertion force 3.5Kgf Max per pin, detachment force 0.8Kgf Min per pin 2) 280 mini relay : insertion force 3.5Kgf Ma
23、x per pin, detachment force 0.8Kgf Min per pin 3) When the relay other than these are used, its spec and evaluation standards shall be separately specified on the drawing and shall be met in test. 4.2.5. Terminal fastening force (1) Test method: After putting the terminal with a wire into the box an
24、d having it connected, pull it in the vertical direction at a rate of 20200X per minute with a push-pull gage or tensile strength tester and measure the load at the moment when the terminal comes out of the box. The measured load shall meet the evaluation standard. Then , apply the 6Kgf in the direc
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMKOREAEDST57142008METHODOFTESTFORENGINEROOMFUSERELAYBOXCONVENTIONALTYPEPDF

链接地址:http://www.mydoc123.com/p-757186.html