GME GMI L-7B01B-12-1998 Burst Speed Test Clutch Disk Assembly and Clutch Pressure Plate Assembly (English German Includes Appendix 1 ITDC Release Draft for Harmonization).pdf
《GME GMI L-7B01B-12-1998 Burst Speed Test Clutch Disk Assembly and Clutch Pressure Plate Assembly (English German Includes Appendix 1 ITDC Release Draft for Harmonization).pdf》由会员分享,可在线阅读,更多相关《GME GMI L-7B01B-12-1998 Burst Speed Test Clutch Disk Assembly and Clutch Pressure Plate Assembly (English German Includes Appendix 1 ITDC Release Draft for Harmonization).pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、I I Burst Speed Test Clutch Disk Assembly and Clutch Pressure Plate Assembly Berstdrehzahlprfung von Zusammenbau Kupplungsscheibe und Zusammenbau Kupplungsdruckplatte I Approved GM do Brasil File name: 7001 2-.doc Prepared: DM Approved Delta Motor GMB HOLDEN !SUZU SAAB Approved Saab Approved Holden
2、Approved ISUZU Approved ITDC - - . cier englische Text ausschlaggebend. 2 Gerte und Einrichtungen 2.1 Einrichtung Prfstand bestehend aus Bersikammer und Steuer- Schrank (siehe Abbildung Anhang 1). 2.1.1 Berstkammer mit hydrostatisch gelagerter Spindel zur Aufnahme des Prflings. 2.1.2 Gleichstromantr
3、ieb fr eine max. Drehzahl von 20 O00 min- (max. Prflingsgewicht 5 kg). 2.1 -3 Hydraulikanlage zur Olversorgung. April 1998 Page 3 of 7 LBSP GMI 2 11/95 I GM INTERNATIONAL ENGINEERING STANDARD Draft GMI L-7B01B-12 2.1.4 Heating device with a controllable temperature range from (+50 to +250)“C for the
4、 burst chamber. 2.1.5 Switch cabinet including control, measuring, and mon i to rin g equipment. 2.2 Equipment N.a. 2.3 Test Vehicieflest Piece The test shall be made according to drawing speci- fication with at least 3 test specimen. 3 Procedure 3.1 Preparation 3.1 .l Heat the burst chamber to the
5、specified temperature prior to installation of the test specimen. According to drawing specification the test temperature for pressure plates is and for clutcn disks +20C (room temperature), cl 80C I 3C. 3.1.2 If the test is made above room temperature, allow the test specimen to soak at the test te
6、mperature for 30 min at 700 min- subsequent to their installa- tion in the burst chamber. 3.1.3 The linings to be tested must be part of a clutch disk asm. 3.1.4 Install the balanced clutch pressure plate as a single part or as an assembly, depending on the test re- quirements. 2.1.4 Heizvomchtung m
7、it einem regelbaren Temperatur- bereich von (+50 bis +250)“C fr die Berstkammer. 2.1.5 Schaltschrank mit Steuer-, Me- und betwa- chungseinrichtungen. 2.2 Ausrstung N.a. 2.3 Versuc hsfa hrzeug/Probekrper Die Prfung erfolgt nach Zeichnungsvorschrift an mindestens 3 Prflingen. 3 Durchfhrung 3.1 Vorbere
8、itung 3.1.1 Die 5ers:kammer ist vor Einbau des Prflings auf die jeweils geforderte Prftemperatur aufzuheizen. Nach Zeichnungsvorschrift betrgt die Prftempera- tur ir Druckclaten und fr Kupqiuncsscheiben 3.1.2 Soll die Prfung bei - 2 O“ C ( Ra u m t e m p e rat u r) +180“C i. 3C. Temperaturen ber der
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMEGMIL7B01B121998BURSTSPEEDTESTCLUTCHDISKASSEMBLYANDCLUTCHPRESSUREPLATEASSEMBLYENGLISHGERMANINCLUDESAPPENDIX1ITDCRELEASEDRAFTFORHARMONIZATIONPDF

链接地址:http://www.mydoc123.com/p-755471.html