FORD SS-M99G9515-A-2006 INSULATION SHIELD - II NOISE TO BE USED WITH FORD WSS-M99P1111-A 《II型隔噪板 与标准FORD WSS-M99P1111-A一起使用 》.pdf
《FORD SS-M99G9515-A-2006 INSULATION SHIELD - II NOISE TO BE USED WITH FORD WSS-M99P1111-A 《II型隔噪板 与标准FORD WSS-M99P1111-A一起使用 》.pdf》由会员分享,可在线阅读,更多相关《FORD SS-M99G9515-A-2006 INSULATION SHIELD - II NOISE TO BE USED WITH FORD WSS-M99P1111-A 《II型隔噪板 与标准FORD WSS-M99P1111-A一起使用 》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING MATERIAL SPECIFICATION Date Action Revisions 2006 10 18 Revised Inserted 3.0; Deleted 3.16 Corrected numbering in 3 1994 12 16 Revised specimen to be cut from finished part) 3.7.1 Original, min 210 N/cm2 3.7.2 After Humidity Ageing, max -15% (48 h at 38 +/- 2 C and 98 +/- 2% relative hu
2、midity) 3.7.3 After Heat Ageing No loss (14 d at 90 +/- 2 C, 1 h at room temperature) 3.7.4 After Immersion in Engine Oil, max -10% (48 h in Oil No. 1 of ASTM D 471 at room temperature) 3.8 TEAR RESISTANCE, min 180 N/cm (ASTM D 624, Die C; specimens to be cut from finished part) 3.9 RESISTANCE TO VA
3、RIOUS REAGENTS The material shall not dissolve or exhibit tackiness when lightly rubbed for 15 seconds with a cloth, soaked with each of the following reagents. Use separate specimens, cut from the finished part for each reagent. Test Reagents: 1) Oil No. 1 of ASTM D 471 2) Brake fluid, SA-M6C9101-A
4、 3) Sulfuric acid (10 % by weight in distilled water) 4) Longlife coolant SS-M97B9103-A, 50% by weight in distilled water 5) Rust preventive compound SK-M7C9552-A. ENGINEERING MATERIAL SPECIFICATION SS-M99G9515-A Printed copies are uncontrolled Copyright 2006, Ford Global Technologies, LLC Page 3 of
5、 5 3.10 ACOUSTIC OVERALL EFFICIENCY (FLTM BV 160-03) Minimum 10 dB for range 200 - 800 Hz. Note: The supplier is required to provide, together with the Initial Sample Report, specimens in dimensions as specified and of same material and equivalent manufacture used for the finished part. Samples for
6、control and routine checks shall be submitted as required by Quality Control. 3.10 AIR BORNE NOISE INSULATION (See Figure 1) Note: If the finished part does not allow the preparation of specimens in dimensions as necessary for this test, proceed according to 3.9, Note. 3.12 FINISHED PART REQUIREMENT
7、S 3.12.1 Dimensions As specified on Engineering drawing 3.12.2 Mass (kg) The tolerance in mass of the finished part for any one supplier shall be maximum +/- 10%, based on the recorded mass of his originally approved initial sample. 3.12.3 Heat Stability The part shall show no visible shrinkage or d
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDSSM99G9515A2006INSULATIONSHIELDIINOISETOBEUSEDWITHFORDWSSM99P1111AII 型隔噪板 标准 FORDWSSM99P1111A 一起

链接地址:http://www.mydoc123.com/p-748245.html